ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/005

Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 1 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

DESCRIPTION TYPE OF ACTIVITY REASON FOR CHANGES


Non-Legal Non-Routine Incident / Accident
Management of Change (Management System / Process /
Legal Routine
Legal / Equipment / Chemical / etc)
New Activity Yearly Reviewed

PROJECT / CONSTRUCTION TEAM APPROVED BY


DESCRIPTION PREPARED BY REVIEWED BY
(EME Project Management Team – Section Head) (Project Manager / Client Rep)
Signature
Name AMIR NAQIUDDIN B. ABD JALIL EN. AHMAD TAUFIQ MR. KONG WENG WAI HELMY BIN HAMDAN
Designation SSS SHO PROJECT MANAGER PROJECT MANAGER / SHO
Date

REQUIRED PPE OTHER SAFETY EQUIPMENT / REQUIREMENTS


Safety Helmet Leather Gloves Respiratory Protection Fire Extinguisher Permit To Work
Safety Shoes / Boot Face Mask Work vest Gas Detector Competency Certificate
Safety Glasses Ear Protection Proper Work Attire Safety Signs Fitness Certificate
Face / Welding Shield Full Body Safety Harness Leather Apron Barricades
Cotton Gloves Double Lanyard Gauntlets Flagman / Signalman
Rubber Gloves Safety Vest Life Line Tag Out / Lock Out

WORK SUPERVISOR : I CERTIFIED THAT I HAVE EXPLAIN THIS HIRARC TO ALL WORKERS
No. Name Position IC No Signature Witness By EME - HSE Signature Date
En. Syammir SITE MANAGER AMIR NAQIUDDIN B. ABD JALIL
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/005
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 2 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

LIKELIHOOD (L) EXAMPLE RATING SEVERITY (S) EXAMPLE RATING

MOST LIKELY The most likely result of the hazard / event being realized 5 CATASTROPHIC Numerous fatalities, irrecoverable property damage and productivity 5
Approximately one single fatality major or major property damage if hazard is
POSSIBLE Has a good chance of occurring and is not unusual 4 FATAL 4
realized
CONCEIVABLE Might be occur at some time in future 3 SERIOUS Non-fatal injury, permanent disability or minor property damage 3

REMOTE Has not been known to occur after many years 2 MINOR Disabling but not permanent injury 2

INCONCEIVABLE Is practically impossible and has never occurred 1 NEGLIGIBLE Minor abrasions, bruises, cuts, first aid type injury 1

Potential Hazard Examples for Specific Categories: SEVERITY (S) MITIGATION


Slip/trip/fall Back injury LIKELIHOOD (L) 1 2 3 4 5 LOW Safe Working Practices (SWP)
Struck / Against Hazardous chemical 5 5 10 15 20 25 MEDIUM SWP, PTW, HSEMS
Overhead work Contact by/with 4 4 8 12 16 20 SWP, PTW, HSEMS, HSE awareness
HIGH
Burn (heat/chemical) caught/in/on/between 3 3 6 9 12 15 Special procedure, OSH program

Eye injury Strains 2 2 4 6 8 10


Radiation hazard Electrical hazard 1 1 2 3 4 5 NOTE : -

Sharp object SWP : Safe Working Practice


Equipment Environment LOW MEDIUM HIGH PTW : Permit To Works
Fire Gas release (HC/ H2s) HSEMS : Health Safety Management System
Damage (Physical) Spill or loss of containment OSH : Occupational, Safety & Health
Loss of production Dusty HSE: Health, Safety & Environment
Explosion Off-site impact
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 3 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Concrete Works

Prepare work tools / a. Obstruction a. Body injury Identify proper inspection area 1 2 2 a. Good Housekeeping Site Supervisor /
1 materials b. Slip Trip & Fall at (LOW) b. Identify proper inspection area Engineer
same level c. Clear any obstruction
d. Maintain good housekeeping at all
time
b. Floor opening a. Serious body 3 3 9 a. Installation barricade for floor opening Site Supervisor /
injury (MEDIUM) b. Install safety signage Engineer

c. Sharp edges a. Cut and abrasion 1 2 2 a. Always practice correct & safe method Site Supervisor /
(LOW) of works Engineer
b. Wearing proper work attire (PPE)
c. Covered sharp edges (if possible)
d. Defective equipment a. Property damage 1 2 2 a. Inspection on equipment before Site Supervisor /
(LOW) start work. Engineer
b. Ensure the tools and equipment’s
were checked and recorded
e. Untrained worker a. Property damage 1 2 2 a. Follow work method statement. Site Supervisor /
b. Body injury (LOW) b. Wear proper work attire (PPE) Engineer /
Conduct training/awareness Safety
f. Ergonomic issue a. Back pain 1 2 2 a. Practice correct body posture and Site Supervisor /
b. Muscle strain (LOW) movement Engineer /
b. Provide in-house training to all related Safety
workers
Working At Height a. Falling from height due a. Resulting into All worker must be briefed before 4 4 16 Site Supervisor /
2 (WAH) to work above personel injury start work especially on safety aspect (HIGH) a.Workers must wear full body harness Engineer /
ground/floor level more through briefing toolbox talk and with double lanyard, chin strap and Safety
than 2meter HIRARC to be explained to all ensure the hook 100% tie off to the firm
workers. structure properly.
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 4 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

b. Ensure workers aware the potential


hazard
c. Don’t allow workers to use the
incomplete scaffold without green tag.
b. Slippery a. Slip, Trip and Fall Every worker must completely 4 4 16 Site Supervisor /
Platform/Structure resulting into attire the PPE, fully body harness (HIGH) a.Every workers to ensure to use proper Engineer /
personnel injury with double lanyard shall be used safety shoes to avoid slippery Safety
and hooked at strong structure at
all time.
c. Falling object/loose a. Resulting into To barricade the working area 2 5 10 Site Supervisor /
item serious injury during erection an adequate (MEDIUM) a.Tools and material shall be kept in the Engineer /
signages. proper container. Safety
a. b. Work area shall be free from
loose/un-used materials.
d. Limited visibility (Blind a. Personnel injury To get approval with SDOB area 3 4 12 Site Supervisor /
spot/Night Activity) owner (MEDIUM) a.To have adequate lightings for night Engineer /
Activity Safety
b. To establish proper communication
tools eg. Walkie talkie
c. . Barricade and signage worksite area
d. Ensure close monitoring by site
supervisor

a.
e. Bad Weather a. Thunderstorm 1 3 3 a. Stop works when heavy rain or Site Supervisor /
b. Flooding (LOW) thunderstorm Engineer /
b. To have weather forecast before Safety
starting work (if necessary)
c. Provide shelter resting area for resting
time
d. Ensure all drain clear from obstruction
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 5 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Apply coating and a. Exposed to paint and a. Personnel Injury 2 3 6 a. SDS (Safety Data Sheet) display at Site Supervisor /
3 painting solvents flammable (MEDIUM) storage area Engineer /
- Manual Touch Up b. Wear PPE as per stated in SDS (Dust Safety
- Powered Tools mask, Rubber glove, etc)
c. Avoid exposing hand and parts of
body from any chemical
d. Identify nearest location of safety
shower and safety eye wash
b. Spillage of paint/thinner a. Environment 2 2 4 a. Use proper container for mixing Site Supervisor /
/ ceramic alloy Issue (LOW) purposes Engineer /
materials b. Cover underneath mixing area Safety
container with canvas
c. Cleanup the spillage immediately
d. To dispose contaminated PPE as
scheduled waste
e. Wear appropriate PPE.
a. Chemical a. Eye injury 3 4 12 a. Obtain and read the manufacturer's Site Supervisor /
Handling/Exposure b. Skin Irritation (MEDIUM) SDS for health hazard information Engineer /
c. May cause b. Avoid exposing hand and parts of Safety
cancer body from any chemical
d. Cause damage c. Wear proper PPE as per PTW & SDS
to organs requirements
d. To follow SDS (Safety Data Sheet)
requirements for handling
e. Identify nearest location of safety
shower and safety eye wash
f. Make sure all workers know about the
task of work
b. Ergonomics - Manual a. Muscular strain 1 3 3 a. Conduct Manual Handling Awareness Site Supervisor /
handling, repetitive and back pain (LOW) Training. Engineer /
work etc. from work b. Working with assistant Safety
position & Use machinery for lifting heavy
manual lifting of material
materials
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 6 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

c. Working under hot a. Collapse / 2 2 4 a. Drink lot of water Site Supervisor /


weather Fainted (LOW) b. Provide shelter resting area Engineer /
b. Dehydration. c. Adequate rest time. Safety
c. Heat Stress Wear proper attire.
d. Slip, trip and fall a. Personnel Injury 2 4 8 Site Supervisor /
(MEDIUM) a. To ensure proper housekeeping of Engineer /
tools, cables, equipments and Safety
materials
b. To ensure all loose tools are tied off /
in tool bags
c. To wear proper PPE as per PTW
requirements and in good condition

Housekeeping a. Manual Handling a. Back pain / 2 2 4 a. Wear proper PPE as per PTW Site Supervisor /
4 ergonomic (LOW) requirement Engineer /
b. Body Injury b. Correct body posture & do not over Safety
stretch body
c. Working with buddy system when
handling a heavy load
d. Use correct / proper tools and proper
manual lifting method
b. Slip, Trip and Fall a. Personnel Injury 2 3 6 a. To ensure proper housekeeping of Site Supervisor /
(MEDIUM) tools, cables, equipments and Engineer
materials
b. To ensure all loose tools are tied off/
in tool bags
c. To wear proper PPE as per PTW
requirements and in good condition
c. Waste Disposal a. Environment 3 3 9 a. To segregate domestic and scheduled Site Supervisor /
(Scheduled waste) (MEDIUM) waste Engineer
b. To properly allocate the scheduled
waste in drum and labelling
c. To seal the drum once the scheduled
waste full
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 7 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

d. Send the full schedule waste drum to


the scheduled waste storage
e. Remove domestic waste by daily
basis
f. Ensure the liquid/sludge like waste
are not dripping from the
drums/pallets to avoid spillage during
transferring of drums.
g. Scheduled waste drum/container must
be put on concrete or on proper lining
(e.g canvas, hdpe lining) to avoid
spillage.
h. Wear proper work attire (PPE)
i. Barricade and install warning signage
at work area.
d. Contact with Chemical a. eye/skin/respirato 2 3 6 a. SDS (Safety Data Sheet) display at Site Supervisor /
ry system (MEDIUM) storage area Engineer /
b. Wear PPE as per stated in SDS (Dust Safety
musk, rubber glove etc.)
c. Designated storage to be barricaded
and signage
d. Avoid exposing hand or parts of body
from any chemical
e. Identify nearest location of safety
shower and safety eye wash
f. No food and drink are allowed in
temporary chemical storage area.