Professional Documents
Culture Documents
Paint Intake
Paint Intake
USED BY
PROJECT BPS
x Safety Helmet x Cotton Gloves Work Vest Fire Extinguisher Lock Out / Tag Out
x Safety Shoes / Boots x Rubber Gloves x Safety Vest Gas Detector x Permit to Work
x Safety Glasses Leather Gloves x Full Body Harness x Safety Signage Competency Certificate
Face / Welding Shield Gauntlets x Air Purifying Mask x Barricades Fitness Certificate
x Safety Googles Ear Protection Supplied Air Respirator Flagman / Signalman x Others: First Aid
Page 1 of 7
Page 2 of 7
Form No. : BM-HSE-FM-36 REF NO: BEWG/HSE/BPS/HIRARC/
Date :
Rev. No. :
Rev. Date :
29.06.2016
A
29.06.2016
BEWG (M) SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
DESCRIPTION OF JOB: PREPARED BY: HIRARC NO:
PAINTING WORK ( RAW WATER PIPELINE ) Name: LUQMAN NUR HAKIM BIN MOHAMMAD HANIFFAH
EXACT LOCATION OF WORK: APPROVED BY: Construction / Project Manager DATE: 04.01.2020
NEW INTAKE & RAW WATER PIPELINE A3 Name: KOK CZE PING
HAZARD IDENTIFICATION RISK ASSESSMENT
Probabilit
NO JOB SEQUENCE / STEPS Severity Risk Rating CONTROL MEASURES RESPONSIBILITY
Potential Hazards y
(A) (B) (A)X(B)
Site supervisor
1 Apply PTW - - - - - Site engineer
.Trained worker
Wear proper PPE. Site supervisor
2 Mixing paint. Paint contact with worker skin. 3 2 6
Ensure using the correct tools Site Engineer
.Trained worker
Wear suitable PPE.
Ensure worker provided suitable face Site supervisor
Toxic fumes from paint. 3 2 6 mask Site Engineer
Place a warning sign in the
workplace
Page 3 of 7
Form No. : BM-HSE-FM-36 REF NO: BEWG/HSE/BPS/HIRARC/
Date :
Rev. No. :
Rev. Date :
29.06.2016
A
29.06.2016
BEWG (M) SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
DESCRIPTION OF JOB: PREPARED BY: HIRARC NO:
PAINTING WORK ( RAW WATER PIPELINE ) Name: LUQMAN NUR HAKIM BIN MOHAMMAD HANIFFAH
EXACT LOCATION OF WORK: APPROVED BY: Construction / Project Manager DATE: 04.02.2020
NEW INTAKE & RAW WATER PIPELINE A3 Name: KOK CZE PING
HAZARD
RISK ASSESSMENT
NO JOB SEQUENCE / STEPS IDENTIFICATION CONTROL MEASURES RESPONSIBILITY
Probability Severity Risk Rating
Potential Hazards (A) (B) (A)X(B)
Page 4 of 7
Form No. : BM-HSE-FM-36 REF NO: BEWG/HSE/BPS/HIRARC/
Date :
Rev. No. :
Rev. Date :
29.06.2016
A
29.06.2016
BEWG (M) SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
DESCRIPTION OF JOB: PREPARED BY: HIRARC NO:
PAINTING WORK ( RAW WATER PIPELINE ) Name: LUQMAN NUR HAKIM BIN MOHAMMAD HANIFFAH
EXACT LOCATION OF WORK: APPROVED BY: Construction / Project Manager DATE: 04.02.2020
NEW INTAKE & RAW WATER PIPELINE A3 Name: KOK CZE PING
HAZARD
RISK ASSESSMENT
NO JOB SEQUENCE / STEPS IDENTIFICATION CONTROL MEASURES RESPONSIBILITY
Probability Severity Risk Rating
Potential Hazards (A) (B) (A)X(B)
Wear proper PPE.
Site supervisor
1) paint contact with Trained worker
4 Painting work. 3 2 6 Site Engineer
worker skin. Place a warning sign in the workplace
Page 5 of 7
Form No. : BM-HSE-FM-36 REF NO: BEWG/HSE/BPS/HIRARC/
Date :
Rev. No. :
Rev. Date :
29.06.2016
A
29.06.2016
BEWG (M) SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
DESCRIPTION OF JOB: PREPARED BY: HIRARC NO:
PAINTING WORK ( RAW WATER PIPELINE ) Name: LUQMAN NUR HAKIM BIN MOHAMMAD HANIFFAH
EXACT LOCATION OF WORK: APPROVED BY: Construction / Project Manager DATE: 04.02.2020
NEW INTAKE & RAW WATER PIPELINE A3 Name: KOK CZE PING
HAZARD
RISK ASSESSMENT
NO JOB SEQUENCE / STEPS IDENTIFICATION CONTROL MEASURES RESPONSIBILITY
Probability Severity Risk Rating
Potential Hazards (A) (B) (A)X(B)
Wear full body harness and hook at suitable anchorage point
during working at height.
Work done by trained & experience worker Site supervisor
5 Dismantle working platform / scaffold 1) Slip & fall from height 3 4 12 Work on focus and carefully. Site Engineer
Ensure working platform free from loose materials.
Ensure worker fit to work at height.
Page 6 of 7
Form No. : BM-HSE-FM-36 REF NO: BEWG/HSE/BPS/HIRARC/
Date : 29.06.2016
Rev. No. : A
Rev. Date : 29.06.2016
EXACT LOCATION OF WORK: APPROVED BY: Construction / Project Manager DATE: 04.02.2020
NEW INTAKE & RAW WATER PIPELINE A3 Name: KOK CZE PING
HAZARD
RISK ASSESSMENT
NO JOB SEQUENCE / STEPS IDENTIFICATION CONTROL MEASURES RESPONSIBILITY
Probability Severity Risk Rating
Potential Hazards (A) (B) (A)X(B)
Ensure sufficient man power for that task.
Site supervisor
3) Manual handling heavy Ensure worker fit to work.
3 4 12 Site Engineer
materials (GI pipe) Use crane for lifting / hold heavy materials.
Site supervisor
Demobilization manpower & -
7 - - - - Site Engineer
machinery from site
Site supervisor
-
8 Close PTW - - - - Site Engineer
Page 7 of 7