You are on page 1of 11

LIFTING PLAN

CHOKE MANIFOLD

Project : Choke Manifold Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 16,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 5.350 Kg
Serial Number : 4212006 Boom Length (m) : 43.00 Max Allowable Load (-20% tandem, as per assessment) : 4.815 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
2.3 meter Load Dimension (LxWxH), (ØxL), meter 1.02 x 0.56 x 0.7 m
(hook overhoisting limit) Weight of Load (Wℓ) : 600 Kg
Safety Factor (Sf) (manufacture) : 1,05
1.8 meter Weight (Wo) : 630 Kg
(sling height, vertically) Lifting accessories weight (Wa) : 18 Kg
Weight of Hook (Wh) : 0 Kg
Weight of Aux. Hook (Wah) : 320 Kg
26.1° (sling angle)
Other (Wot) (spreader bar) : Kg
DAF : 1,00
20 cm
Tot. Weight of Load : 968 Kg
(lifting point - bottom)
% Crane Capacity SWL Used : 20,10% OK
REQUIRED HEIGHT CALCULATION
Crane Working Angle : 65 °
Crane's boom height (a) : 40,00 m
4 meter Required height (b) : 8,30 m
(space to lift) - est. down point elevation : 4,00 m
- lifting point - bottom : 0,20 m
- sling height : 1,80 m
- hook overhoisting limit : 2,30 m
Space to lift, a - b > 0 : 31,700 OK
LIFTING ACCESSORIES
Wire Sling Ø 1/2 in, 2.2 meter, 4 ea : 5,10 Ton
Shackles Bolt Type Anchor 3/4 inch, 4 ea : 2,63 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0,866 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom of crane to safe area
9
10
11
12
13
14
15
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 5,10 x 3 x 1 x 0,866 :
: 13,25 Ton : 0,28 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 13,25 / 0,97 :
: 13,69 > 1,00 OK : 9,41 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
LIFTING PLAN

COUNTER WEIGHT

Project : Counter Weight Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 10,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 8.000 Kg
Serial Number : 4212006 Boom Length (m) : 43.00 Max Allowable Load (-20% tandem, as per assessment) : 7.200 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
Load Dimension (LxWxH), (ØxL), meter 1.5 x 1.5 x 2 m
2.3 meter Weight of Load (Wℓ) : 5.000 Kg
(hook overhoisting limit) Safety Factor (Sf) (manufacture) : 1,05
Weight (Wo) : 5.250 Kg
1.6 meter Lifting accessories weight (Wa) : 22,7 Kg
(sling height, vertically) Weight of Hook (Wh) : 0 Kg
Weight of Aux. Hook (Wah) : 320 Kg
0° (sling angle) Other (Wot) (spreader bar) : Kg
5T DAF : 1,00
1.3 meter
(lifting point - bottom) Tot. Weight of Load : 5.593 Kg
% Crane Capacity SWL Used : 77,68% OK
REQUIRED HEIGHT CALCULATION
Crane Working Angle : 72 °
Crane's boom height (a) : 44,00 m
4 meter Required height (b) : 9,20 m
(space to lift)
- est. down point elevation : 4,00 m
- lifting point - bottom : 1,30 m
- sling height : 1,60 m
- hook overhoisting limit : 2,30 m
Space to lift, a - b > 0 : 34,800 OK
LIFTING ACCESSORIES
Wire Sling Ø 5/8 in, 1.8 meter, 1 ea : 4,20 Ton
Shackles Bolt Type Anchor 7/8 inch, 1 ea : 6,50 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom crane to safe area
9
10
11
12
13
14
15
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 4,20 x 1 x 1 x 1 :
: 4,20 Ton : 5,59 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 4,20 / 5,59 :
: 0,75 > 1,00 OK : 1,16 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
LIFTING PLAN

Injector + Lubricator

Project : Injector Head + Lubricator Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 10,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 12.300 Kg
Serial Number : 4212006 Boom Length (m) : 35,00 Max Allowable Load (-20% tandem, as per assessment) : 11.070 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
Load Dimension (LxWxH), (ØxL), meter 4.1 x 1.3 x 5.9
2.5 meter Weight of Load (Wℓ) : 6.890 Kg
(hook overhoisting limit) Safety Factor (Sf) (manufacture) : 1,05
Weight (Wo) : 7.235 Kg
4.2 meter Lifting accessories weight (Wa) : 70 Kg
(sling height, vertically) Weight of Hook (Wh) : 450 Kg
Weight of Aux. Hook (Wah) : 0 Kg
15° (sling angle) Other (Wot) (spreader bar) : Kg
DAF : 1,00
Tot. Weight of Load : 7.755 Kg
% Crane Capacity SWL Used : 70,05% OK
1.90 meter REQUIRED HEIGHT CALCULATION
(lifting point - bottom) Crane Working Angle : 70 °
Crane's boom height (a) : 34,00 m
Required height (b) : 12,60 m
- est. down point elevation : 4,00 m
- lifting point - bottom : 1,90 m
- sling height : 4,20 m
- hook overhoisting limit : 2,50 m
Space to lift, a - b > 0 : 21,400 OK
LIFTING ACCESSORIES
Wire Sling Ø 28 mm, 2.5 ft, 4 ea : 18,00 Ton
4 meter
Shackles Bolt Type Anchor 1 inch, 4 ea : 8,50 Ton
(space to lift)
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0,866 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom crane to safe area
9
10
11
12
13
14
15
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 18,00 x 3 x 1 x 0,866 :
: 46,76 Ton : 2,24 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 46,76 / 7,75 :
: 6,03 > 1,00 OK : 3,80 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
LIFTING PLAN

BOP & X-OVER

Project : BOP & X-Over Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 10,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 12.300 Kg
Serial Number : CTU 02-STB-01 Boom Length (m) : 35,00 Max Allowable Load (-20% tandem, as per assessment) : 11.070 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
Load Dimension (LxWxH), (ØxL), meter 2.3 x 1.85 x 1.3
2.3 meter Weight of Load (Wℓ) : 6.900 Kg
(hook overhoisting limit) Safety Factor (Sf) (manufacture) : 1,05
Weight (Wo) : 7.245 Kg
1.8 meter Lifting accessories weight (Wa) : 22,7 Kg
(sling height, vertically)
Weight of Hook (Wh) : 0 Kg
Weight of Aux. Hook (Wah) : 320 Kg
0° (sling angle) Other (Wot) (spreader bar) : Kg
DAF : 1,00
3 meter Tot. Weight of Load : 7.588 Kg
(lifting point - bottom) % Crane Capacity SWL Used : 68,54% OK
REQUIRED HEIGHT CALCULATION
Crane Working Angle : 70 °
Crane's boom height (a) : 34,00 m
Required height (b) : 8,80 m
- est. down point elevation : 4,00 m
4 meter
(space to lift) - lifting point - bottom : 3,00 m
- sling height : 1,80 m
- hook overhoisting limit : 2,30 m
Space to lift, a - b > 0 : 25,200 OK
LIFTING ACCESSORIES
Wire Sling Ø 5/8 in, 1.8 meter, 1 ea : 4,20 Ton
Shackles Bolt Type Anchor 7/8 inch, 1 ea : 6,50 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom crane to safe area
9
10
11
12
13
14
15
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 4,20 x 1 x 1 x 1 :
: 4,20 Ton : 7,59 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 4,20 / 7,59 :
: 0,55 > 1,00 OK : 0,86 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
LIFTING PLAN

CLIP IN DRUM (CID)

Project : Clip in Drum (CID) Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 8,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 17.300 Kg
Serial Number : 4212006 Boom Length (m) : 23,00 Max Allowable Load (-20% tandem, as per assessment) : 15.570 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
Load Dimension (LxWxH), (ØxL), meter 5X3X4
2.3 meter Weight of Load (Wℓ) : 14.000 Kg
(hook overhoisting limit)
Safety Factor (Sf) (manufacture) : 1,05
Weight (Wo) : 14.700 Kg
2.74 meter
(sling height, vertically) Lifting accessories weight (Wa) : 22,7 Kg
Weight of Hook (Wh) : 450 Kg
0° (sling angle) Weight of Aux. Hook (Wah) : 0 Kg
Other (Wot) (spreader bar) : Kg
DAF : 1,00
3 meter Tot. Weight of Load : 15.173 Kg
(lifting point - bottom) % Crane Capacity SWL Used : 97,45% OK
REQUIRED HEIGHT CALCULATION
Crane Working Angle : 65 °
Crane's boom height (a) : 26,00 m
Required height (b) : 12,24 m
- est. down point elevation : 4,00 m
4 meter
(space to lift) - lifting point - bottom : 3,00 m
- sling height : 2,74 m
- hook overhoisting limit : 2,50 m
Space to lift, a - b > 0 : 13,760 OK
LIFTING ACCESSORIES
Wire Sling Ø 26 mm, 3.6 meter, 4 ea : 8,50 Ton
Shackles Bolt Type Anchor 1 inch, 4 ea : 8,50 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0,866 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom crane to safe area
9
10
11
12
13
14
15
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 8,50 x 3 x 1 x 0,866 :
: 22,08 Ton : 4,38 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 22,08 / 15,17 :
: 1,46 > 1,00 OK : 1,94 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
LIFTING PLAN

CT DRUM

Project : CT DRUM Date : Revision :


Location : Mutiara/Badak Certification No. : 1355/56-215/PA/DMT/2019 Outrigger (fuly extended, 360 area) : 7,00 m
Crane Type : Rough Terrain Crane Validation Date : 18-Jan-21 Max. Radius : 5,00 m
Year of Build : 2013 Manufacture : Kato Works co.id SWL Manufacture : 30.800 Kg
Serial Number : 4212006 Boom Length (m) : 11,00 Max Allowable Load (-20% tandem, as per assessment) : 27.720 Kg
SKETCH, SLING ANGLE, HOOK OVER HOISTING LIMIT, WORKING RANGE LOAD CALCULATION
Load Dimension (LxWxH), (ØxL), meter 3 X 3 X 2,7
2.3 meter
(hook overhoisting limit) Weight of Load (Wℓ) : 25.000 Kg
Safety Factor (Sf) (manufacture) : 1,05
Weight (Wo) : 26.250 Kg
4 meter
Lifting accessories weight (Wa) : 22,7 Kg
(sling height, vertically)
Weight of Hook (Wh) : 450 Kg
0° (sling angle) Weight of Aux. Hook (Wah) : 0 Kg
Other (Wot) (spreader bar) : 300 Kg
DAF : 1,00
3.5 meter Tot. Weight of Load : 27.023 Kg
(lifting point - bottom) % Crane Capacity SWL Used : 97,48% OK
REQUIRED HEIGHT CALCULATION
Crane Working Angle : 60 °
Crane's boom height (a) : 14,00 m
Required height (b) : 12,30 m
- est. down point elevation : 4,00 m
5 meter
(space to lift) - lifting point - bottom : 3,50 m
- sling height : 2,30 m
- hook overhoisting limit : 2,50 m
Space to lift, a - b > 0 : 1,700 OK
LIFTING ACCESSORIES
Wire Sling Ø 1 in, 2.3 meter, 2 ea : 18,00 Ton
Shackles Bolt Type Anchor 1 inch, 2 ea : 17,00 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 0,86 °
LIFTING ACCESSORIES
Wire Sling Ø 1 in, 2.3 meter, 2 ea : 20,00 Ton
Shackles Bolt Type Anchor 1 inch, 2 ea : 17,00 Ton
Other : Ton
Load factor (tying / hitch) (direct) : 100 %
Sling Angle (from vertical) : 1 °
METHOD STATEMENTS
1. Check crane before used for lifting
2. Check Sling and Shackle
3. Install Sling and Shackle to Pad Eyes
4. Put Master Link to Crane's Hook
5. Install Tag Line
6. Lifting the equipment to target point
7. Disconnect Master Link from hook of crane after job is done
8. Positioning boom crane to safe area
SLING SHACKLE GROUND BEARING PRESSURE (GBP)
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor Wheel Crane
: 18,00 x 2 x 1 x 0,866 :
: 31,18 Ton : 15,60 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 31,18 / 27,02 :
: 1,15 > 1,00 OK : 1,09 > 1,00 OK
Wo : Weight n : Number of Lifting Point
SLING SHACKLE
WLL min : SWL x N_sling x Load Factor x Angle Factor WLL min : [(Wo/1000) / n] / Angle Factor
: 20,00 x 2 x 1 x 1 :
: 40,00 Ton : 13,51 Ton
Safety Factor : WLL min / [(Wo/1000) Safety F. : SWL/WLL min
: 40,00 / 27,02 :
: 1,48 > 1,00 OK : 1,26 > 1,00 OK
Wo : Weight n : Number of Lifting Point
NOTE: Angle Factor
1) Always makes assessment (above, surrounding and below) including possible escape route
2) Consider enviromental condition (wind speed)
3) Always give barricade line over operated radius of crane
4) No person stand below line of fire / suspended load
5) Make sure all lifting equipment, accessories, pad eyes / lifting point are fit to use and has valid certification
6) Use tag-line as per assessment and should not joined / knoted and not tied on part of bodies

Safety Factor : 1,20 id Estimated, 1,10 if Calculation, 1,05 if given by manufacture, 1,00 if weighed
DAF : 1,30 for Offshore, 1,15 for inshore, 1,00 for onshore
Allowable GBP: Badak 10 Ton/m² , Nilam 8 Ton/m², Lempake 8 Ton/m², Semberah 12 Ton/m², Mutiara 10 Ton/m², Pamaguan 7 Ton/m²
GBP Calculator: http://www.hsc-crane.com/simulation/index.php/Init/index?lang=en OR https://www.kobelco-kenki.com/en_cris/top/home.htm
Prepared by, Acknowledged by, Reviewed by, Approved by,

Armin Alamsyah / Achmad Jalaluddin Giant Hermawan


03 - Juni -2021 03 - Juni -2021
RESCUE PLAN TEMPLATE
1{SE.SAF'.TMP-OO1q

Bahasa lndonesia - Hal 1

Detail Pekerjaan
Tanggal Lokasi No. Work Permit

Disiapkan oleh PA
Nama TandaTangan
Direview oleh ERT
ry,w
Direview oleh
Safety Assurance ftl,tlh Disetu.iu ioleh AA
T^
r ar^l^T^ rgd' -
rud r dr^^^ r

A l-+:f;+^^ +^-1,^;+
nALiltLsS tEt nqlL
f Memasuki Ruang Terbatas ffieieriadi ketinggian
f]Penggalian ILain-taln (elaskan):

Potensi Situasi Penyelamatan

fTerperangkap ilAtmosfir Berbahaya fjApi []Cedera


ffiKetinggian ffimia Berbahaya iltistrit< fl Lain-lain (jelaskan):_
Apakah akses keluarlmasuk dari/ke area kerja akan mempengaruhi penyelamatan darurat? Xya tfiOat<
(1ika YA, jelaskan tindakan pencegahan dan pengendalian dalam rencana penyelamatan)

Jumlah petugas P3K: _3_ orang


(harus setidaknya 1i5 darijumlah anggota tim kerja)
Pekerja ketinggian.......... .. M

Persyaratan Peralatan Darurat


(PA harus memastikan peralatan penyelamatan tersedia di lokasi kerja dan dalam kondisi baik sebelum memulai
aktifitas pekerjaan)

1'
ffi M(r,nuu. 5ea
f#
ffi
j:* dautun P3K 1ea
ffi
ilSCBAset N/A

F ilRescue strop 2ea -*.f*o

H
flTandu 1ea
# [Oxygen
resuscitation 1ea

*'il,
N/A

t
ILite
(100 m
I rescue line 2ea
I ea)
E #, o"r""ro,2ea O peneranganl ea
(instrically safe)

,*
fltripod I davil I
j,.\ points 1ea EIRadio 6ea #o* 4ea
anchor

d 6
[-lRainkimia
"* -.,
1\/A ^

Berbahayaea
@ fi*,on seluler 2ea .ry IDefibrillator

g LI SATJA
. rr/r
SCt i\/A
ECKLIST INSPEKSI FULL BODY HARNESS

Pengguna
Model
No Serial
Tahun Pembuatan
Tanggal pertama kali digunakan
Layak Tidak Layak
A. Pemeriksaan Visual untuk komponen keselamatan
Digunakan Digunakan
Kondisi webing
Periksa apakah ada luka, bekas terbakar, kontaminasi kimia, berjumbai, abrasi, jamur, perubahan warna, jahitan rusak, kerapuhan
Kondisi attachment point
Periksa apakah ada deformasi, bekas dan korosi
Kondisi jahitan load bearing
Periksa apakah ada yang terpotong, usang, robek dan benang yang terurai
Kondisi dan kompatibilitas konektor
Periksa apakah ada deformasi, retak, korosi
Kondisi Gesper (adjustment buckles)
Periksa apakah ada deformasi, bekas, retak, korosi, tepi tajam, pecah, usang, distorsi dan kerusakan
Kondisi Pelabelan/ Serial Number
Semua label harus ada dan sepenuhnya terbaca (standar yang relevan, Manufaktur ID, Tahun, Nomor Seri, Type)

Layak Tidak Layak


B. Pemeriksan komponen kenyamanan
Digunakan Digunakan
Kondisi padding dari sabuk pinggang dan leg-loops, jaket, spreader, gear loopsr
Kenyamanan, ergonomis dan kompatibel

Layak Tidak Layak


C. Pemerikasaan Operasional
Digunakan Digunakan
Periksa webbing straps dalam posisi yang benar masuk ke buckles
Verifikasi fungsi pegas pada fast quick-connect buckles
Kondisi dan kompatibilitas konektor

D. Contoh Gambar
Dorsal Sternal attachment point
Sternal attachment point

Double back adjusment buckles

Belt Directional connector

Latteral belt attachement point


Ventral attachment point

FAST rapid buckles

Komentar:

Formulir ini harus diisi setiap 6 bulan


Inspeksi visual peralatan harus dilakukan sebelum dan setelah digunakan

Keputusan (tik)
Peralatan ini Layak Digunakan Peralatan ini Tidak Layak Digunakan
Tanggal Inspeksi : Tanggal inspeksi berikutnya :
Inspeksi oleh :
Tanda tangan
Department :

D:\1. WORKING FILE\1. OIL FIELD SERVICE\2. EN - CTU OPERATION\2. PHSS\2021\WAH Inspection Checklist PHSS Page 1

You might also like