You are on page 1of 6

Interleavant Powder Measurement Record

Opening in Weight of the Weight of


S.No Date Powder
Powder
powder with
Weight of the
the powder Remarks(Specification -250-350 Mg/Sqm Use powder name Lab tech.
flow % plastic (Grams)
machine plastic (Grams) Milligram From Oct-21 revised spec to 450-500 Mg/Sqm

1 27-Nov-17 0.6 45 88.33 88.04 290 Ok AC SEPAROL KS M.Irfan

2 6-Dec-17 0.6 45 91.99 91.52 470 thick glass production AC SEPAROL KS M.Irfan

High Quantity informed to Mr.Richard


3 10-Dec-17 0.6 45 74.17 73.78 387 AC SEPAROL KS M.Irfan
so,reduce powder

4 12-Dec-17 0.6 45 91.92 91.67 250 OK AC SEPAROL KS M.Irfan

5 15-Dec-17 0.6 45 91.96 91.7 260 OK AC SEPAROL KS M.Irfan

6 24-Dec-17 0.6 45 89.67 89.44 230 KO - Powder unformity uneven AC SEPAROL KS M.Irfan

7 25-Dec-17 0.6 45 89.85 89.48 370 After cleaning powder storage Device AC SEPAROL KS M.Irfan

8 22-Jan-18 0.8 45 91.86 91.57 290 OK AC SEPAROL KS M.Irfan

9 15-Feb-18 0.8 45 95.65 95.3 350 OK AC SEPAROL KS M.Irfan

12 7-Oct-18 0.7 45 56.14 55.89 250 correction(Trial) AC SEPAROL KS M.Irfan

11 7-Oct-18 0.6 45 56.1 55.88 220 Low Quantity so second time take(Trial) AC SEPAROL KS M.Irfan

21 10-Oct-18 0.8 45 54.15 53.79 360 Trial AC SEPAROL KS M.Irfan

22 10-Oct-18 0.8 45 55.39 54.98 410 Trial AC SEPAROL KS M.Irfan

20 10-Oct-18 0.7 45 54.2 53.92 280 Trial AC SEPAROL KS M.Irfan

19 10-Oct-18 0.7 45 55.74 55.42 320 Trial AC SEPAROL KS M.Irfan

17 10-Oct-18 0.6 45 53.05 52.81 240 Trial AC SEPAROL KS M.Irfan

18 10-Oct-18 0.6 45 56.04 55.83 210 Trial AC SEPAROL KS M.Irfan

19 11-Oct-18 0.7 75 54.28 53.8 480 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

20 11-Oct-18 0.7 75 55.87 55.43 440 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

21 11-Oct-18 0.7 75 54.41 53.91 500 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

22 11-Oct-18 0.7 75 55.38 54.94 440 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

23 15-Oct-18 0.7 70 55.47 54.95 520 During Production AC SEPAROL KS M.Irfan

Trial (Plastic Change)-Changed spec to started


24 29-Oct-18 0.7 75 95.89 95.44 450 450-500 Mg/Sqm AC SEPAROL KS M.Irfan
25 23-Dec-18 0.7 75 55.97 55.46 510 During Production AC SEPAROL KS M.Irfan

26 16-Feb-19 0.7 75 54.28 53.8 480 During Production AC SEPAROL KS Johani

27 12-Apr-19 0.7 75 55.87 55.41 460 During Production AC SEPAROL KS Johani

28 6-Jun-19 0.7 75 54.41 53.91 500 During Production AC SEPAROL KS Johani

29 31-Jul-19 0.7 75 55.38 54.94 440 During Production AC SEPAROL KS Johani

30 24-Sep-19 0.7 75 54.28 53.8 480 During Production AC SEPAROL KS Johani

31 18-Nov-19 0.7 75 55.87 55.43 440 During Production AC SEPAROL KS Johani

32 12-Jan-20 0.7 75 54.41 53.91 500 During Production AC SEPAROL KS Johani

33 7-Mar-20 0.7 75 55.38 54.94 440 During Production AC SEPAROL KS Johani

34 13-Sep-20 0.7 95 49.02 48.72 300 During Production AC SEPAROL KS M.Irfan

35 13-Sep-20 0.7 95 48.79 48.53 260 During Production AC SEPAROL KS M.Irfan

36 17-Apr-21 0.75 (L) 90 47.92 47.88 40 During Tuning AC SEPAROL KS M.Irfan

37 17-Apr-21 0.75 (C) 90 48.82 48.71 110 During Tuning AC SEPAROL KS M.Irfan

38 17-Apr-21 0.75 (R.) 90 46.98 46.95 30 During Tuning AC SEPAROL KS M.Irfan

39 17-Apr-21 0.85 90 47.01 46.8 210 During Tuning AC SEPAROL KS M.Irfan

40 18-Apr-21 0.1 (L) 90 47.96 47.53 430 During Tuning AC SEPAROL KS M.Irfan

41 18-Apr-21 0.1 (C) 90 48.9 48.49 410 During Tuning AC SEPAROL KS M.Irfan

42 18-Apr-21 0.1 (R.) 90 47.13 46.75 380 During Tuning AC SEPAROL KS M.Irfan

43 4-Jun-21 0.7 (L) 25 46.43 45.86 570 During Production AC SEPAROL KS M.Irfan 4-Jun-21
380
44 23-Jun-21 0.7 (R) 25 47.72 47.18 540 During Production AC SEPAROL KS M.Irfan 23-Jun-21
375
45 15-Jul-21 0.8 30 49.38 48.91 470 During Tuning AC SEPAROL KS M.Irfan 15-Jul-21
385
30-Jul-21 0.8 30 49.38 48.91 470 During Tuning AC SEPAROL KS M.Irfan 30-Jul-21
373
46 9-Aug-21 0.75 25 55.24 54.84 400 During Tuning AC SEPAROL KS M.Irfan 9-Aug-21
390 Jun
47 19-Sep-21 0.7 30 51.32 51.02 300 During Production AC SEPAROL KS M.Irfan 19-Sep-21
Chart Title 430
48 19-Sep-21 0.7 30 51.32 51.02
500 300 During Production AC SEPAROL KS M.Irfan 19-Sep-21
445
Interleaving Powder measurement
49 3-Oct-21 0.7 550 30 46.85 46.46 390 After maintanance & During Production AC SEPAROL KS M.Irfan 3-Oct-21
450 435

500
400
Interleaving Powder measurement
550
450

50 19-Oct-21 0.7 500


30 46.85 46.46 390 After maintanance & During Production AC SEPAROL KS M.Irfan 19-Oct-21
400 443
51 5-Nov-21 0.7 (L) 30 47.08 46.62 460 Left side (During production) AC SEPAROL TN (New) M.Irfan 5-Nov-21

Milligram/Sq.M
450 448
350
52 26-Nov-21 0.7 (R) 30 47 46.57 430 Right side (During Production) AC SEPAROL TN (New) M.Irfan 26-Nov-21
400 420
300
53 3-Dec-21 0.7 (L) 30 47.08 46.62 460 Left side (During production) AC SEPAROL TN (New) M.Irfan 3-Dec-21
350 430
54 28-Dec-21 0.7 (R) 30 47 250
46.57 430 Right side (During Production) AC SEPAROL TN (New) M.Irfan 28-Dec-21
300 4-Jun-21 4-Jul-21 4-Aug-21 4-Sep-21 4-Oct-21 4-Nov-21 4-Dec-21 4-Jan-22 446
4-Jun-21 4-Jul-21 4-Aug-21 4-Sep-21 4-Oct-21 4-Nov-21 4-Dec-21 4-Jan-22
5-Jan-22 0.7 (L) 30 47.08 DAte
46.62 460 Left side (During production) AC SEPAROL TN (New) M.Irfan 5-Jan-22
448
21-Jan-22 0.7 (R) 30 47 46.57 430 Right side (During Production) AC SEPAROL TN (New) M.Irfan 21-Jan-22
442

0
Interleavant Powder Measurement Record
Opening in Weight of the Weight of
S.No Date Powder
Powder
powder with
Weight of the
the powder Remarks(Specification -250-350 Mg/Sqm Use powder name Lab tech.
flow % plastic (Grams)
machine plastic (Grams) Milligram From Oct-21 revised spec to 450-500 Mg/Sqm

1 27-Nov-17 0.6 45 88.33 88.04 290 Ok AC SEPAROL KS M.Irfan

2 6-Dec-17 0.6 45 91.99 91.52 470 thick glass production AC SEPAROL KS M.Irfan

High Quantity informed to Mr.Richard


3 10-Dec-17 0.6 45 74.17 73.78 387 AC SEPAROL KS M.Irfan
so,reduce powder

4 12-Dec-17 0.6 45 91.92 91.67 250 OK AC SEPAROL KS M.Irfan

5 15-Dec-17 0.6 45 91.96 91.7 260 OK AC SEPAROL KS M.Irfan

6 24-Dec-17 0.6 45 89.67 89.44 230 KO - Powder unformity uneven AC SEPAROL KS M.Irfan

7 25-Dec-17 0.6 45 89.85 89.48 370 After cleaning powder storage Device AC SEPAROL KS M.Irfan

8 22-Jan-18 0.8 45 91.86 91.57 290 OK AC SEPAROL KS M.Irfan

9 15-Feb-18 0.8 45 95.65 95.3 350 OK AC SEPAROL KS M.Irfan

12 7-Oct-18 0.7 45 56.14 55.89 250 correction(Trial) AC SEPAROL KS M.Irfan

11 7-Oct-18 0.6 45 56.1 55.88 220 Low Quantity so second time take(Trial) AC SEPAROL KS M.Irfan

21 10-Oct-18 0.8 45 54.15 53.79 360 Trial AC SEPAROL KS M.Irfan

22 10-Oct-18 0.8 45 55.39 54.98 410 Trial AC SEPAROL KS M.Irfan

20 10-Oct-18 0.7 45 54.2 53.92 280 Trial AC SEPAROL KS M.Irfan

19 10-Oct-18 0.7 45 55.74 55.42 320 Trial AC SEPAROL KS M.Irfan

17 10-Oct-18 0.6 45 53.05 52.81 240 Trial AC SEPAROL KS M.Irfan

18 10-Oct-18 0.6 45 56.04 55.83 210 Trial AC SEPAROL KS M.Irfan

19 11-Oct-18 0.7 75 54.28 53.8 480 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

20 11-Oct-18 0.7 75 55.87 55.43 440 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

21 11-Oct-18 0.7 75 54.41 53.91 500 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

22 11-Oct-18 0.7 75 55.38 54.94 440 Trial for revised spec of 450-500 Mg/Sq.m AC SEPAROL KS M.Irfan

23 15-Oct-18 0.7 70 55.47 54.95 520 During Production AC SEPAROL KS M.Irfan

Trial (Plastic Change)-Changed spec to started


24 29-Oct-18 0.7 75 95.89 95.44 450 450-500 Mg/Sqm AC SEPAROL KS M.Irfan
25 23-Dec-18 0.7 75 55.97 55.46 510 During Production AC SEPAROL KS M.Irfan

26 16-Feb-19 0.7 75 54.28 53.8 480 During Production AC SEPAROL KS Johani

27 12-Apr-19 0.7 75 55.87 55.41 460 During Production AC SEPAROL KS Johani

28 6-Jun-19 0.7 75 54.41 53.91 500 During Production AC SEPAROL KS Johani

29 31-Jul-19 0.7 75 55.38 54.94 440 During Production AC SEPAROL KS Johani

30 24-Sep-19 0.7 75 54.28 53.8 480 During Production AC SEPAROL KS Johani

31 18-Nov-19 0.7 75 55.87 55.43 440 During Production AC SEPAROL KS Johani

32 12-Jan-20 0.7 75 54.41 53.91 500 During Production AC SEPAROL KS Johani

33 7-Mar-20 0.7 75 55.38 54.94 440 During Production AC SEPAROL KS Johani

34 13-Sep-20 0.7 95 49.02 48.72 300 During Production AC SEPAROL KS M.Irfan

35 13-Sep-20 0.7 95 48.79 48.53 260 During Production AC SEPAROL KS M.Irfan

36 17-Apr-21 0.75 (L) 90 47.92 47.88 40 During Tuning AC SEPAROL KS M.Irfan

37 17-Apr-21 0.75 (C) 90 48.82 48.71 110 During Tuning AC SEPAROL KS M.Irfan

38 17-Apr-21 0.75 (R.) 90 46.98 46.95 30 During Tuning AC SEPAROL KS M.Irfan

39 17-Apr-21 0.85 90 47.01 46.8 210 During Tuning AC SEPAROL KS M.Irfan

40 18-Apr-21 0.1 (L) 90 47.96 47.53 430 During Tuning AC SEPAROL KS M.Irfan

41 18-Apr-21 0.1 (C) 90 48.9 48.49 410 During Tuning AC SEPAROL KS M.Irfan

42 18-Apr-21 0.1 (R.) 90 47.13 46.75 380 During Tuning AC SEPAROL KS M.Irfan

43 23-Jun-21 0.7 (L) 25 46.43 45.86 570 During Production AC SEPAROL KS M.Irfan

44 23-Jun-21 0.7 (R) 25 47.72 47.18 540 During Production AC SEPAROL KS M.Irfan

45 15-Jul-21 0.8 30 49.38 48.91 470 During Tuning AC SEPAROL KS M.Irfan

30-Jul-21 0.8 30 49.38 48.91 470 During Tuning AC SEPAROL KS M.Irfan

46 9-Aug-21 0.75 25 55.24 54.84 400 During Tuning AC SEPAROL KS M.Irfan


Jun
47 19-Sep-21 0.7 30 51.32 51.02 300 During Production AC SEPAROL KS M.Irfan

48 19-Sep-21 0.7 30 51.32 51.02 300 During Production AC SEPAROL KS M.Irfan

49 3-Oct-21 0.7 30 46.85 46.46 390 After maintanance & During Production AC SEPAROL KS M.Irfan
50 19-Oct-21 0.7 30 46.85 46.46 390 After maintanance & During Production AC SEPAROL KS M.Irfan

51 5-Nov-21 0.7 (L) 30 47.08 46.62 460 Left side (During production) AC SEPAROL TN (New) M.Irfan

52 26-Nov-21 0.7 (R) 30 47 46.57 430 Right side (During Production) AC SEPAROL TN (New) M.Irfan

53 3-Dec-21 0.7 (L) 30 47.08 46.62 460 Left side (During production) AC SEPAROL TN (New) M.Irfan

54 3-Dec-21 0.7 (R) 30 47 46.57 430 Right side (During Production) AC SEPAROL TN (New) M.Irfan