You are on page 1of 1

QUOTATION

To, Quo. No : DA/QU/22-23/00012-R1


Schneider Electric India Private Limited Date : 25/04/2022
Block No. 205 to 208, 240,EAIC Vadodara Manufacturing Cont. Per. : Mr.Rohitkumar Sahu
Plant,ANKHOL,Vadodara, Gujarat,390019,Vadodara,Gujarat

E-mail : ROHIT.SAHU@lntebg.com Mob /Ph. : 9712363141 /

Reference :
Subject : Quotation for DZ-0 Housing Assembly Vision Inspection system

Sr.No Unit Rate Dis(%) Amount


Item Name HSN Code Qty
Rs
1 3.80
DZ-0 Housing Assembly Vision Inspection, 84798999 1 No 1,287,070.00 1,238,161.34

Fabricated Structure
Base plate SS 6mm / AL 10mm
Vision Belt Conveyor system
Vision Inspection Unit (5 MP) with customised DSS light
Singling unit & Rejection unit
Vision Camera Enclosure
Lifetime Remote support from keyence & on site support from
DSS
Belt Cover, Bottom Cover, Push button Mounting, etc.
Monitor mounting, keyboard and mouse bracket

Rupee : Twelve Lakhs Thirty-Eight Thousand One Hundred Sixty-One Only Total Amount 1,238,161.00

GSTIN No: 24AAFCD8277N1Z2 PAN: AAFCD8277N BANK: HDFC

A/C NO: 50200021260607 IFSC CODE: HDFC0000416 CIN U29308GJ2016PTC093565

Terms & Conditions:

1 FINAL INSPECTION AND ACCEPTANCE: Final inspection and acceptance shall be made by Buyer at Seller's facility.
2 Quote is valid for 30 Days only.
3 Suppliers and Payments are subject to Vadodara Jurisdiction only.
4 GST: 18% Extra.
5 P&F and Transportation: Inclusive
6 Please confirm the Concept design, Drawings and BOM before Purchse Order, Any addition in parts/system wrt Design/BOM in the setup form your
site will cost extra.
7 Warranty: 1 Year after date of Invoice for Manufactured parts against Manfacturing defects and for electrical and electronics parts As per standard
warrenty terms of Manufacturer.
8 Transit insurance:In Buyres Scope.
9 Force Majeure: DSS Automation Technologies Pvt. Ltd. will not be liable for any loss, damage or delay arising out of its failure to perform hereunder
due to causes beyond its reasonable control, including without limitation, act of God or the customer, acts of civil or military authority,
fire, strikes, floods, epidemics, quarantine restrictions, war, riots, delay in transportation or transportation embargoes, and inability to obtain
necessary materials. In the event of any such delay, Buyer agrees that the date of delivery shall be extended for a period equal to the time lost by
reason of the delay without penalty to Seller.
10 Delivery can be affect due to Covid19 Pandemic Conditions.
11 Delivery Time: 8-10 Weeks after design confirmation from client.
12 Payment Terms: 45 Days after Date of Invoice.

For DSS Automation Technologies Pvt. Ltd.

We hope that above will be in line with your requirement, we are


waiting for your positive reply.

If any futher clarification, please do not hesitate to contact us. (Authorised Signatory)

You might also like