1 8:00-9:30 CLASS DISCUSSION: Training CD: ECLOS Differences (Compared to CXR4) System Description System Boot Up System Shut Down 9:00-12:00 LAB: System Operation Lab (Tasks to Complete) System Power On and Boot Up / Basic Menu Operations Warm-Ups / Air Calibrations Perform the Daily QC Test Perform a Few Air Scans Maintenance Mode Scans (Password: rs0471314185) Examine Raw Data (Using Maintenance Mode) Press the “Ctrl” + “Shift” + “Backspace” Keys in Succession Press the “Ctrl” + “Shift” + “Space” Keys in Succession 12:00-1:00 LUNCH 1:00-1:30 CLASS DISCUSSION: Quick Parts Location Overall System Block Diagram 1:30-2:30 LAB: System Components Identification 2:30-3:30 CLASS DISCUSSION: X-Ray Generator Cabinet Differences (None) Stationary Gantry Components Differences (MTCPU3 Board) Cosmetic Differences Rotating Gantry Differences (RXCPU3 Board/RTC2 Board/Detector) 3:30-5:00 LAB: Differences in the X-Ray Generator Cabinet Differences in the Stationary Gantry Differences in the Rotating Gantry 2 8:00-10:00 CLASS DISCUSSION: Training CD: PHS Components and Differences Image Processor Differences (3 Extra Boards) Network/DICOM Configuration System Calibration Differences 10:00-12:00 LAB: PHS Differences and Calibration Tilt Motion Calibration Image Processor Diagnostics Network/DICOM Configuration 12:00-1:00 LUNCH 1:00-5:00 LAB: Morning Lab Continued Install all Covers on the System Daily QC Final Test Review Dismissal