You are on page 1of 1

METRO MANILA SUBWAY PROJECT

Health, Safety & Environment …for a Better Future

(FEL) LOADER INSPECTION CHECKLIST - DAILY


Name of Contractor: Name of Person In charge / Operator: Month / Year:

Equipment ID No. Color Code: Safety Remarks:

NO ITEM INSPECTED D A T E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Access not slippery
2 Engine Oil Sufficient
3 Gear Oil Sufficient
4 Hydraulic Oil Sufficient
5 Grease Sufficient
6 Radiator Water Sufficient
7 Battery Water Sufficient
8 Free from any oil / Fuel Leaks
9 Lift adjusting gear are in working condition
10 Fan Belt Tension & free from wear and tear

11 Overhead Protection in place and good condition


12 Front screen free from cracks

13 Warning alarm Light and alarm in good condition

14 Cabin Visual free from obstruction

15 Valid Fire Extinguisher Available


16 Functional Checked
17 Spark arrestor Installed
18 Cabin Access & Cleanliness
19 Wheel/Track Pads
SIGNATURE
Operator Signature:
Verified by Supervisor/ Equipment In-charged:
Verified by Safety Officer:

Remarks: ( 🗸) Yes/Good (X) No/Repair/Replace (N.A) Not Applicable

Page 1 of 1 SWP-SF010A_5 Rev. A

You might also like