You are on page 1of 2

METRO MANILA SUBWAY PROJECT

Health, Safety & Environment


…for a Better Future

PUMPCRETE INSPECTION CHECKLIST - DAILY


Name of Contractor: Name of Person In charge / Operator: Month / Year:

Equipment Identification No. Color Code: Safety Remarks:

D A T E
NO ITEM INSPECTED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 TRUCK CONDITION
Water level in radiator and reserve tank
Lubricant level and condition
Oil, water and fuel leakage
Fan belt tension
Front Drive Axle / Chassis
Tires Condition
2 HYDRAULIC SYSTEM
Hydraulic oil level and condition
Control lever and valve working condition
Pump working condition
Hydraulic hoses condition
Motor working condition
3 ELECTRIC SYSTEM
Battery water level
Lighting (Signal, Warning, Brake, Front and rear)
4 BOOM ASSEMBLY
Turn Table
Arms (1st,2nd, 3rd , nth)
Deck, Boom Pipes
Pipe line Connections
Flexible Rubber Hose with 2 Tagline
5 SAFETY
Fire Extinguisher available with Color code
Reverse Swing alarm
Blinkers functioning during movement

Page 1 of 2 SWP-SF010A_7 Rev. A


Horn
Emergency Button
12 OTHERS
Concrete Hopper
Front Outriggers
Rear Outriggers
Two (2) pcs Long Rope for Tagline connected to
flexible hose
SIGNATURE
Operator Signature:
Verified by Supervisor/ Equipment In-charged:
Verified by Safety Officer:

Remarks: (√) Yes/Good (X) No/Repair/ Replace (N.A) Not Applicable

Page 2 of 2 SWP-SF010A_7 Rev A

You might also like