1 Purpose
1.1 To prevent the unexpected energization, start-up or release of hazardous energy of
equipment and machines
1.2 To ensure employee safety and prevent serious injury or fatality in the workplace.

2 Training Requirements
The following employees shall be trained on this guideline:

2.1 Production and Plant Manager, Supervisors, Foreman, Operators, Helpers, and Staff
2.2 Maintenance Manager, Supervisors, Technicians, Helpers, and Staff
2.3 Workshop Manager, Supervisors, Foreman, Mechanics, Electricians, and Staff
2.4 Materials and Logistic Manager, Supervisors, Coordinators, Foreman, and Drivers
2.5 Technical Manager, QA/QC Engineers, Laboratory Supervisors, Foreman, and
Technicians
2.6 QHSE Manager, HSE Officers, and Security Officers

3 Guidelines
3.1 Identify the types of energy sources used, potential hazards and all control devices.
i. Electrical
ii. Mechanical
iii. Thermal
iv. Chemical
v. Gravity
vi. Hydraulic/Pneumatic
vii. Rotational Energy

3.2 Prepare all the materials required for the lock-out tag-out (LOTO) procedure as follows:
3.2.1 Materials: Lock Out / Tag Out devices complete set (locks and tags)
3.2.2 Equipment and Tools
i. Approved Tool box kit
ii. Digital Multi meter
3.2.3 Safety Equipment
i. Work gloves if necessary (voltage rated gloves if working near exposed voltage
must be greater than the rated working voltage)
ii. Safety helmet, high visibility vest, Safety boots or shoes

This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means without the
prior permission of GCSI QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. GCSI-HSE-OPC-004
Department Reference
Revision No. 01

Effective Date 31 Jul 2021


Lock-Out Tag-Out (LOTO)
Page No. Page 2 of 3

3.3 Inform the HSE Officer of the task involving LOTO and request for the permit. Refer to
GCSI-F-HSE-53 Lock-out Tag-out (LOTO) Permit.
3.4 Request from HSE Officer or Security for the LOTO equipment with the LOTO tag
bearing the requestor’s name, employee number, designation, and contact number. The
HSE Officer shall log the request.

LOTO Equipment LOTO Tag Front LOTO Tag Back

3.5 Write the following information on the LOTO tag: the planned activity, date, and time.
3.6 Notify all affected employees of the specific activity.
3.7 Turn-off all operating controls.
3.8 Locate all energy sources.
3.9 Isolate all energy sources by blocking, bleeding and venting stored energy as found in
springs, hydraulic systems and pneumatic systems.
3.10 Lock-out all switches and energy controls in the “off” or “safe” position.

3.11 Test the operating controls by putting all controls in the “on” position. Ensure that the
work area is clear and nobody may get hurt before testing.
3.12 Return all operating controls to the “off” position.
3.13 The Permit must be posted at site until completion / cancellation of work.
3.14 Perform the planned activity.
3.15 Upon completion of the activity, check the work area again to ensure no one is exposed
to the hazards.

This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means without the
prior permission of GCSI QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. GCSI-HSE-OPC-004
Department Reference
Revision No. 01

Effective Date 31 Jul 2021


Lock-Out Tag-Out (LOTO)
Page No. Page 3 of 3

3.16 Once clear, remove lock-out devices only after the equipment is fully assembled and all
affected employees have been notified. Each lock-out device must be removed by the
person who puts it on.

3.17 Return the LOTO equipment and tag to HSE Officer or Security.
3.18 In case lock-out was not removed by the person-in-charge before leaving work, his
immediate superior can remove the lock-out only after ensuring that it is safe to remove
it. It is necessary to contact the person who puts the lock-out.
3.19 Do not force the removal of the lock-out. A corresponding sanction shall be enforced
according to the circular on HSE Violations Penalty System.
3.20 Ensure to close out the permit and return back to HSE Officer for archiving.

4 Associated Documented Information


Document
Document No. Document Title
Type
System GCSI-IMS-005 Operational Planning and Control
Procedure GCSI-IMS-013 Recruitment, Training and Competency
Department
GCSI-HSE-OPC-001 Health, Safety and Environment (HSE) Plan
Reference
Forms GCSI-F-HSE-53 Lock-out Tag-out (LOTO) Permit
Circular GCSI/HSE/C/01/19 HSE Violations Penalty System

5 Review and Approval

Prepared by: Reviewed by: Approved by:

HSE Officer QHSE Manager General Manager


1.

This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means without the
prior permission of GCSI QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.

You might also like