Nima TADA
Nima TADA
BG-3-A0394
Started the journey towards the site for
monitoring and supervision of rectification work
Pelrithang 29.10.2022 Umling 29.10.2022 Umling like stringing conductors at 11kv cross-over line
at Langar Khola (ULA41 to ULA44 and ULB41
to ULB44)
Estimated
Travelling Advance Required:
Expenses:
As per our records a sum of Nu……… is outstanding against the official as on……….. against Travel Advance
Date:
I hereby certify that the travel was authorised by me for official purpose and the calims appear genuine and reasonable.
Date:
Employees must attach the following documents with their claim.
1.Travel Authorization
3.Vehicle Log book copy (in case of use of corporation vehicle)
7.In case of use of personal vehicle-copy of prior authorization from Line Manager must be attached.
Department DCD
Travel Authorization: Attached
Date: 12.10.2022
Any other
Office vehicle or
Milleage (Nu. Actual
Personal vehicle Total (Nu.) Remarks
) Expences
used Kms.
(Nu.) Started the journey towards the site for monitoring
Contractor vehicle 1250 and supervision of 33kv line constrution at
Tareythang.
Signature of Employee
2. Tour Report
4. Blue Book copy (in case of use of personal vehicle.
st be attached.
Tour Report from 01.10.2022 to 31.10.2022
Date
01.10.2022
02.10.2022 to 03.10.2022
04.10.2022
05.10.2022
06.10.2022
07.10.2022
08.10.2022
09.10.2022
10.10.2022
11.10.2022
13.10.2022
14.10.2022 to 16.10.2022
17.10.2022
19.10.2022
20.10.2022
21.10.2022
23.10.2023
24.10.2024
25.10.2022
26.10.2022
27.10.2022
29.10.2022
30.10.2022
31.10.2022
Submitted by:
o 31.10.2022
Description
Started the journey towards the site for monitoring and supervision of 33kv line constrution at
Tareythang.
The Joint measurement from pole-to-pole distances, noting materials erected, inspection of
materials and quality of work done and also insulation resistance test (IR) at site was conducted
on 06th October 2022.(From Chuzaygang starting point to Taklai Khola tower point)
The Joint measurement from pole-to-pole distances, noting materials erected, inspection of
materials and quality of work done and also insulation resistance test (IR) at site was conducted
on 07th October 2022.(From Taklai Khola to Langar khola )
Back to station
Started the journey towards the site for inspection, joint measurement, and Meggering of newly
constructed line from Langar Khola to Tareythang A.
Back to station
Started the journey towards the site to verified again Megger value which was found low megger
value on 5th and 6th 10.2022 of newly constructed line in between Chuzaygang to Taklai khola
Started the journey towards the site for inspection, joint measurement, and meggering of newly
constructed line at Tareythang.
The Joint measurement from pole-to-ole distances, noting materials erected, inspection of
materials and quality of work done and also insulation resistance test (IR) at site was conducted
on 14th - 16th October 2022.(From Tareythang A to dead end point at Gyalsung project)
Back to station
Started the journey towards the site for monitoring and supervision of rectification work like
restringing conductors which were found at low ground clearance at TTA27-TTA28 for Line-A,
and tightening of DP fittings which were found loose by the line inspection team at pole
numberTTA25 and TTA30.
Halt at Tareythang site for monitoring and supervision of rectification work like restringing
conductors which were found at low ground clearance at TTA27-TTA28 for Line-A, and
tightening of DP fittings which were found loose by the line inspection team at pole
numberTTA25 and TTA30.
Back to station
Started the journey towards the site for monitoring and supervision of rectification work like
restringing conductors which were found at low ground clearance at TTA03-TTA04 & TTB03-
TTB04 for Line-A & B respectively and back to office in the evening. .
Started the journey towards the site for monitoring and supervision of rectification work like
restringing conductors which were found at low ground clearance ULA01-ULA02 for line ( A)
and back to office in the evening. .
Started the journey towards the site for monitoring and supervision of rectification work like
restringing conductors which were found a bird nest form in between TTA06 to TTA08.
Halt at Tareythang for monitoring and supervision of rectification work like restringing
conductors which were found a bird nest form in between TTA06 to TTA08.
Back to station
Started the journey towards the site for monitoring and supervision of rectification work like
stringing conductors at 11kv cross-over line at Langar Khola (ULA41 to ULA44 and ULB41 to
ULB44)
Halt at Umling for monitoring and supervision of rectification work like stringing conductors at
11kv cross-over line at Langar Khola (ULA41 to ULA44 and ULB41 to ULB44)
Back to station
Nima Tshering
Technician II
GPO, Pelrithang
DCD, BPC.