This document contains a table with information about various work permits at BALCO, including the document number, description, status, creator, date created, attributable group, extension times if needed, location, severity, type of work, number of workers, current stage, and current stage user. There are 7 ongoing work permits listed for activities like civil works, dismantling, excavation and electrical works at different areas like the smelter, LCS area, and potline.
This document contains a table with information about various work permits at BALCO, including the document number, description, status, creator, date created, attributable group, extension times if needed, location, severity, type of work, number of workers, current stage, and current stage user. There are 7 ongoing work permits listed for activities like civil works, dismantling, excavation and electrical works at different areas like the smelter, LCS area, and potline.
This document contains a table with information about various work permits at BALCO, including the document number, description, status, creator, date created, attributable group, extension times if needed, location, severity, type of work, number of workers, current stage, and current stage user. There are 7 ongoing work permits listed for activities like civil works, dismantling, excavation and electrical works at different areas like the smelter, LCS area, and potline.
Document Number Document Description Document Status Created By
BALCO/PTW/05316 Central workshop inside anWork In Progress Parikshit Sarma
BALCO/PTW/05320 Lcs civil activities Work In Progress Amit Samanta BALCO/PTW/05300 Dismantling rodding shop Work In Progress Somnath Chandra BALCO/PTW/05292 Shuttering excavation PCC Work In Progress Kaushik Pal BALCO/PTW/05289 Central workshop inside & Work In Progress Parikshit Sarma BALCO/PTW/05260 Central workshop inside & Work In Progress Parikshit Sarma BALCO/PTW/05263 Excavation, PCC, RCC, ShutWork In Progress Kaushik Pal Created On Attributable to Extension End TIme Extension Start TIme 05/Nov/2022 08:53 Bridge and Roof 05/Nov/2022 00:00 05/Nov/2022 00:00 05/Nov/2022 09:04 Bridge and Roof 04/Nov/2022 10:00 Bridge and Roof 04/Nov/2022 09:05 Bridge and Roof 04/Nov/2022 08:47 Bridge and Roof 04/Nov/2022 00:00 04/Nov/2022 00:00 03/Nov/2022 08:47 Bridge and Roof 03/Nov/2022 00:00 03/Nov/2022 00:00 03/Nov/2022 08:54 Bridge and Roof Is Extension Required Location Severity Type of Work Yes Smelter Medium Electrical Work,General Wo No LCS Area Medium Dewatering Works,Excavati Rodding High Hot Work (Welding Grinding Potline Medium Assembly Dismantling Of F Yes Smelter Medium Electrical Work,General Wo Yes Smelter Medium Electrical Work,General Wo Potline Medium Assembly Dismantling Of F Workmen Engaged Current Stage Current Stage User 15 Work Start/ Random Site ViParikshit Sarma 22 Work Start/ Random Site ViAmit Samanta 10 Work Start/ Random Site ViSomnath Chandra 40 Work Start/ Random Site ViKaushik Pal 15 Work Start/ Random Site ViParikshit Sarma 15 Work Start/ Random Site ViParikshit Sarma 40 Work Start/ Random Site ViKaushik Pal