The document contains details of 11 work permit documents for various construction and maintenance projects at BALCO. The projects include dismantling a rodding shop, excavation works, precast bed preparation, and fencing work. Most of the projects are listed as "Work in Progress" and were created between September 2022 and November 2022 by engineers including Somnath Chandra, Kaushik Pal, and Amit Samanta.
The document contains details of 11 work permit documents for various construction and maintenance projects at BALCO. The projects include dismantling a rodding shop, excavation works, precast bed preparation, and fencing work. Most of the projects are listed as "Work in Progress" and were created between September 2022 and November 2022 by engineers including Somnath Chandra, Kaushik Pal, and Amit Samanta.
The document contains details of 11 work permit documents for various construction and maintenance projects at BALCO. The projects include dismantling a rodding shop, excavation works, precast bed preparation, and fencing work. Most of the projects are listed as "Work in Progress" and were created between September 2022 and November 2022 by engineers including Somnath Chandra, Kaushik Pal, and Amit Samanta.
Document Number Document Description Document Status Created By
BALCO/PTW/05300 Dismantling rodding shop Work In Progress Somnath Chandra
BALCO/PTW/05292 Shuttering excavation PCC Work In Progress Kaushik Pal BALCO/PTW/05287 Bake oven area excavation,Work In Progress Anil Das BALCO/PTW/05289 Central workshop inside & Work In Progress Parikshit Sarma BALCO/PTW/05270 Precast bed preparation Work In Progress Laxmi Narayana Hota BALCO/PTW/05260 Central workshop inside & Work In Progress Parikshit Sarma BALCO/PTW/05263 Excavation, PCC, RCC, ShutWork In Progress Kaushik Pal BALCO/PTW/05262 Excavation, Backfilling, F Work In Progress Debobrata Chakraborty BALCO/PTW/04999 Lcs civil activities Work In Progress Amit Samanta BALCO/PTW/04791 Lcs civil activities Work In Progress Amit Samanta BALCO/PTW/04107 fancing work new project gWork In Progress Nanda Gopal Giri Created On Attributable to Extension End TIme Extension Start TIme 04/Nov/2022 10:00 Bridge and Roof 04/Nov/2022 09:05 Bridge and Roof 04/Nov/2022 08:42 Bridge and Roof 04/Nov/2022 00:00 04/Nov/2022 00:00 04/Nov/2022 08:47 Bridge and Roof 04/Nov/2022 00:00 04/Nov/2022 00:00 03/Nov/2022 09:10 Bridge and Roof 03/Nov/2022 08:47 Bridge and Roof 03/Nov/2022 00:00 03/Nov/2022 00:00 03/Nov/2022 08:54 Bridge and Roof 03/Nov/2022 08:53 Bridge and Roof 20/Oct/2022 08:54 Bridge and Roof 11/Oct/2022 08:17 Bridge and Roof 03/Sep/2022 12:08 Bridge and Roof Is Extension Required Location Severity Type of Work Rodding High Hot Work (Welding Grinding Potline Medium Assembly Dismantling Of F Yes Bake oven Medium Dewatering Works,Excavat Yes Smelter Medium Electrical Work,General Wo LCS Area Medium General Work,Hot Work (We Yes Smelter Medium Electrical Work,General Wo Potline Medium Assembly Dismantling Of F LCS Area Medium Excavation Work,General No LCS Area Medium Dewatering Works,Excavati LCS Area Medium Dewatering Works,Excavati Project Gate Medium General Work Workmen Engaged Current Stage Current Stage User 10 Work Start/ Random Site ViSomnath Chandra 40 Work Start/ Random Site ViKaushik Pal 30 Work Start/ Random Site ViAnil Das 15 Work Start/ Random Site ViParikshit Sarma 5 Work Start/ Random Site ViLaxmi Narayana Hota 15 Work Start/ Random Site ViParikshit Sarma 40 Work Start/ Random Site ViKaushik Pal 20 Work Start/ Random Site ViDebobrata Chakraborty 18 Work Start/ Random Site ViAmit Samanta 22 Work Start/ Random Site ViAmit Samanta 5 Work Start/ Random Site ViNanda Gopal Giri