COMPARATIVE STATEMENT FOR EXPANSION ACTIVITY

SYRMA SGS TECHNOLOGY LTD – SF 232/1A1 MADEPALLI


VILLAGE BARGUR KRISHNAGIRI -635104

Sl No Particulars Existing After Expansion


1 Whether change in the name of
theunit Yes

If yes New Name of the unit Syrma SGS Technology Ltd

2 Date of commissioning 30.06.2015 Nov 2022


3 Extent of land
a. Total area 0.46 hectares 1.0 hectares
b. Built up area 0.158 hectares 0.250hectares
c. Solid waste storage / disposal area 0.01 hectares ______
d. Green Belt / Irrigation area 0.01 hectares 0.57hectares
e. Vacant area 0.0320 hectares 0.1700 hectares
4 Raw Materials Quantity Quantity
Copper wire 2800 Kgs/month 3500kgs/month
Bobbin core 315000No’s/month 5000000No’s/month
PPS for base ___ 1500Kg
IC ___ 6000000 No’s/Month

5 Products Quantity Quantity


Magnetics coils 300000 No’s/Month 400000 No’s/Month
RFID coils ___ 7500000 No’s/ Month

By products
NIL NIL NIL

Intermediate Products

NIL NIL NIL


6
Details of fuel used

Name of fuel Point of use Quantity ( kg/day or Litres/day)


Existing Expansion
Diesel DG set 0.02 L/Day 13.3 L/Day

7 Whether change in manufacturing


process (If yes enclose separately) Yes
8 No of employees working per
day(including contract workers) 60 250
9 Total Gross Fixed Asset
(Rupees in Lakhs) Rs. 631.98 lakhs Rs.657.16 lakhs
10 Details of Emission control measures
(All existing and proposed control measures shall be furnished as annexure in the
following format)
Point Source of Control measure Material of Top diameter Height
emission construction in mm above
GL in m
Existing
Refer the attached Sheet Annexure - I

Proposed
No change

Note: Fugitive emission sources and Noise control measures shall also be
furnished in the annexure.
11 Water consumption details ( in Kilo Litres per day – KLD)
Particulars Existing Expansion
Source of Water - Outsourcing 3.00 KLD 10.00KLD
WC I (Cooling and boiler feed) ___ ___
WC II (Domestic) 3.00 KLD 10.00KLD
WC III (Process – Easily biodegradable) ___ ___

WC IV (Process – Non easily biodegradable) ___ ___

12 Details of wastewater generated (in KLD)

Particulars Existing Expansion


Sewage 2.4 KLD 8.5 KLD
Trade Effluent Nil Nil

13 Sources of trade effluent

Sources of Trade effluent Quantity in KLD


Existing Nil Nil

Expansion Nil Nil

14 Details of wastewater treatment Components of wastewater treatment


measures measures along with size, design
(Both details of STP and ETP) details, adequacy report, process flow
diagram and hydraulic flow diagram
shall be annexed for existing and
expansion activity separately.
15 Details of non-hazardous solid waste

Quantity Mode of
S.No Nature of solid ( Tonnes / month) disposal
waste Existing Expansion
1 Copper wire 140Kgs/month 500Kgs/month Sent back to
Chennai office
2 Carton boxes ___ 1000Kgs/month Through vendor
3 Wooden pallets ___ 100Kgs/month Through vendor
4 Moulding plastics ___ 200Kgs/month Through vendor
5 Bobbin core 15000No’s/Month 25000No’s/Month Sent back to
Chennai office
16 Details of Hazardous solid waste
S. Category Name of the Quantity Mode of
No No waste ( Tonnes / year ) disposal
Existing Expansion
1 33.1 Empty
barrels/containers/liners 2.00T 3.00T
contaminated with Authorized vendor
hazardous chemicals
/wastes
3 5.2 Wastes or residues Authorized vendor
containing oil 1.00T 2.00T

17 Any other relevant details may be annexed

Signature
Name and Designation
Annexure –I
10. Details of Emission Control Measures

S.No Source of Pollution Material of Stack top Stack height


Emission control construction dimension (in Above ground
measures metres)
Exsiting

1 Hand Stack MS 0.3 6.5


soldering

2 DG set -125 Stack MS 0.152 7


Kva

Expansion

1 Hand Stack MS 0.3 6.5


soldering

2 Hand Stack MS 0.3 6.5


soldering

3 DG set -125 Stack MS 0.152 7


Kva

Fugitive Emission sources and Noise Control measures:

Source of
Fugitive or Noise Type of Emission Pollution control measures
emission

DG Set Fugitive Acoustic measures


provided