You are on page 1of 5

Category of the Industry :

ORANG
E

CONSENT ORDER NO. 2301156016475 DATED: 22/12/2023.

PROCEEDINGS NO.F.4054TPN/OS/DEE/TNPCB/TPN/W/2023 DATED: 22/12/2023

___________________________________________________________________
SUB: TNPC Board-Consent for Establishment-M/S KUMARAN SPECIALITY PRIVATE LIMITED S.F
No. 751/4, 751/5, 751/1B, , NALROAD Village, Kangeyam Taluk, Tiruppur District - for the
establishment or take steps to establish the industry under Section 25 of the Water (Prevention and
control of Pollution)Act,1974, as amended in 1988(Central Act 6 of 1974)- Issued- Reg.

REF: 1. Unit’s Application for CTE-New dated 23/11/2023 (Resubmitted on 11/12/2023)


2. IR.No : F.4054TPN/OS/AEE/TPN/2023 dated 22/12/2023
3. Minutes of the 233th DLCCC meeting held on 22/12/2023 (Item No. 233-03)

Consent to establish or take steps to establish is hereby granted under Section 25 of the Water (Prevention and control of
Pollution) Act,1974, as amended in 1988(Central Act 6 of 1974) (hereinafter referred to as 'The Act') and the Rules and Orders made
there under to
The Director,
KUMARAN SPECIALITY PRIVATE LIMITED
Authorizing occupier to establish or take steps to establish the industry in the site mentioned below:
S.F No. 751/4, 751/5, 751/1B,
NALROAD Village,
Kangeyam Taluk,
Tiruppur District.

This Consent to establish is valid upto March 31, 2028, or till the industry obtains consent to operate under Section 25 of the
Water (Prevention and control of Pollution) Act, 1974, as amended in 1988 whichever is earlier subject to special and general
conditions enclosed.
M Digitally signed by M
SARAVANAKUMAR
SARAVANAKUMAR Date: 2023.12.26 16:45:24 +05'30'
District Environmental Engineer,
Tamil Nadu Pollution Control Board,
TIRUPPUR NORTH

To
The Director,
M/s.KUMARAN SPECIALITY PRIVATE LIMITED,
18 Ayyasamy Nagar, Palayakottai Road, Kangayam, Tiruppur
District.
Pin: 638701

Copy to:
1.The Commissioner, KANGEYAM-Panchayat Union, Kangeyam Taluk, Tiruppur District .
2. Copy submitted to the Member Secretary, Tamil Nadu Pollution Control Board, Chennai for favour of kind information.
3. The District Environmental Engineer, Tamil Nadu Pollution Control Board, TIRUPPUR NORTH for favour of kind information.
4. File

1
------------

2
SPECIAL CONDITIONS

1. This consent to establish is valid for establishing the facility for the manufacture of products/
byproducts (Col. 2) at the rate (Col 3) mentioned below. Any change in the product/byproduct and its
quantity has to be brought to the notice of the Board and fresh consent has to be obtained.

Sl. Description Quantity Unit


No.
Product Details
1. Coconut Oil 1690 Tons/Month
2. Packed Refined,Hydrogenated, Interesterfied 2080 Tons/Month
Coconut Oil and its Fraction
3. Packed Refined,Hydrogenated, Interesterfied 1300 Tons/Month
Palm Kernel Oil and its Fraction
By-Product Details
1. Liquid Soap/Fatty Acid Distillate 520 Tons/Month
2. Copra Cake 910 Tons/Month
2. The unit shall provide Sewage Treatment Plant and /or Effluent Treatment Plant as indicated below.
a Sewage Treatment Plant:
Treatment status: Septic Tank and SP/DT
SL. No. Name of the Treatment No. of Units Dimensions in metres
Unit
1. Septic Tank 1 2.0 x 2.0 x 2.5
2. Soak Pit 1 1.8 Dia x 1.5 Ht
b Effluent Treatment Plant:
Treatment status: Individual ETP
SL. No. Name of the Treatment No. of Units Dimensions in metres
Unit
1. Oil Skimmer 2 1.0 x 1.5 x 1.0 Each
2. Oil & Grease Trap 3 1.0 x 0.85x 1.0 Each
3. Collection Tank 1 2.8 x 3.0 x 3.0
4. Flash Mixer 1 0.9 x 0.9 x 0.9
5. Primary Settling Tank 1 2.0 x 3.0 x 1.5
6. Aeration Tank 1 3.5 x 3.0 x 4.0
7. Secondary Settling 1 2.5 x 3.0 x 1.8
Tank
8. Sludge Drying Beds 6 1.0 x 1.0 x 1.0 Each
9. RO I Feed Tank 1 3.0 x 1.7 x 2.0
10. Pressure Sand Filter 1 0.45 Dia x 1.65 Ht
11. Activated Carbon Filter 1 0.45 Dia x 1.65 Ht
12. RO I Membranes 2 8"dia x 40"long Each
13. RO II Feed Tank 1 1000 Liter HDPE Tank
14. RO II Membranes 1 8"dia x 40"long
15. RO Product Tank 1 3.0 x 1.7 x 2.0
16. Solar Evaporation Pan 1 335 SQ.M
3. This consent to establish is valid for establishing the facility with the below mentioned outlets for the
discharge of sewage/trade effluent. Any change in the outlets and the quantity has to be brought to the
notice of the Board and fresh consent has to be obtained.

3
Outlet No. Description of Outlet Maximum daily discharge Point of disposal
in KLD
Effluent Type : Sewage
1. Sewage 2.4 On Industrys own land
Effluent Type : Trade Effluent
1. Trade Effluent I 8.5 RO Permeate from 2
Stages - Recycling to
Process
2. Trade Effluent II 1.5 Solar Evaporation Pans
4. Special Additional Conditions:
The unit shall obtain No Objection Certificate (NOC) from the Tamil Nadu Bio Diversity Board
/National Bio Diversity Authority if the unit is using any Biological resources or knowledge
associated thereto as per the provisions of Biological Diversity Act 2002.
The industries shall take all efforts to use and popularize “Mission LiFE” logo and mascot which is
available in TNPCB & MoEFCC website. They shall also request their employees to adopt “Mission
LiFE” action points and document the same and furnish half yearly report to Board.
5. Additional Conditions:
1.This consent order does not absolve from obtaining necessary permission / Clearance from other
Authority or under other statutes as applicable.
2.The unit shall operate only after obtaining consent to operate from the Board.
3.The unit shall provide the septic tank arrangements for treating the sewage before applying for
Consent to Operate.
4.The unit shall provide adequate capacity of Effluent Treatment Plant as proposed for the treatment
of effluent generated from its floor washings and boiler blow down so as to achieve zero liquid
discharge and to reuse the entire quantity of RO Permeate to the process.
5.The unit shall provide elevated Solar Evaporation Pan of adequate area to dispose RO Reject and to
ensure that there shall not be any overflow or seepage from into land or water sources.

6.The unit shall provide Electro-magnetic Flow meters to measure the flow in the Effluent Treatment
Plant inlet pipe line, RO Feed, RO Permeate & RO Reject pipe line.
7.The unit shall not attract any complaint from the nearby habitations during the course of
construction.
8.The unit shall make necessary arrangement to procure makeup water from M/s. Perundurai to
Kangeyam Water Project Welfare Association for its daily requirement.
9.The unit shall provide Rain Water Harvesting system within the premises so as to recharge the
ground water in that area before applying for Consent to Operate.
10.The unit shall not use "use and throwaway plastics" such as plastic sheets used for food wrapping,
spreading on dining table etc', plastic plates, plastic coated tea cups, plastic tumbler, water pouches
and packets, plastic straw, plastic carry bags and plastic flags irrespective-of thickness etc', as per the
G.O. (Ms) No.84, Environment & Forest Department of Tamil Nadu Government (EC.2) Notification
dated 25.06.2018. Instead the unit shall encourage use of Eco friendly alternative such as banana leaf,
areca nut plate, stainless steel, glass, porcelain plates/cups, cloth bag jute bag etc.
11.In case of revision of consent fees, the unit should remit the difference in amount from the date of
notification; otherwise the consent order will be withdrawn without any notice and further action will
be initiated against the unit as per law.
M Digitally signed by M
SARAVANAKUMAR
SARAVANAKUMAR Date: 2023.12.26 16:46:04 +05'30'
District Environmental Engineer,
Tamil Nadu Pollution Control Board,
TIRUPPUR NORTH

4
GENERAL CONDITIONS

1. This consent to establish cannot be construed as consent to operate and the unit shall not commence
the operation without obtaining the Consent to operate.
2. The applicant shall make a request for grant of consent to operate at least thirty days, before the
commissioning of trial production.
3. Any Change in the details furnished in the conditions has to be brought to the notice of the Board and
got approved by the Board, before obtaining consent to operate under the said Act.
4. The unit has to comply with the provisions of Public Liability Insurance Act, 1991 to provide
immediate relief in the event of any hazard to human beings, other living creatures/plants and
properties while handling and storage of hazardous substances (wherever applicable).
5. Consent to operate will not be issued unless the unit complies with the conditions of consent to
establish.
6. The unit shall provide adequate water sprinklers for the control of dust emission during the loading
and unloading of construction material so as to minimize the dust emission.
7. The unit shall provide water sprinklers along the temporary roads inside the premises to avoid fugitive
dust emission during the vehicle movements.
8. The unit shall develop green belt of adequate width around the premises.
9. In case there is any change in the management, the unit shall inform the change with relevant
documents immediately.
Digitally signed by M
M SARAVANAKUMAR
SARAVANAKUMAR Date: 2023.12.26 16:46:29
+05'30'
District Environmental Engineer,
Tamil Nadu Pollution Control Board,
TIRUPPUR NORTH