JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 2
INDEX
SL.NO DESCRIPTION PAGE NO
1 REFERENCES 3
2 GENERAL ABBREVIATIONS 4
3 CONVERSION FACTORS USED 6
4 BASIC DATA 7
5 DESIGN CRITERIA & ASSUMPTIONS 10
PRELIMINARY TREATMENT 12
6 INLET DISTRIBUTION CHAMBER 13
7 FINE SCREEN 15
8 AERATED GRIT & GREASE CHAMBER 18
9 PARSHALL FLUME 22
10 FLOW DISTRIBUTION CHAMBER 24
11 BUFFER TANK 25
PRIMARY TREATMENT 26
12 PRIMARY CLARIFIER 27
BIOLOGICAL TREATMENT 32
13 BIOLOGICAL REACTOR 33
14 AERATION BLOWERS 37
SLUDGE TREATMENT 38
15 SLUDGE PRE THICKENER 39
16 SLUDGE BALANCING TANK 42
17 PRIMARY GRAVITY BELT THICKENER 44
18 SECONDARY GRAVITY BELT THICKENER 46
19 DIGESTER FEED SUMP & PUMPS 48
20 ANAEROBIC DIGESTER 50
21 BIOGAS HOLDER 59
22 CENTRIFUGE FEED SUMP & PUMPS 61
23 CENTRIFUGE 62
24 SLUDGE DRYER 64
TERTIARY TREATMENT 66
25 FERRIC CHLORIDE DOSING 67
26 DISC FILTER 69
27 PLANT WATER SUMP AND PUMPING STATION 72
28 DISINFECTION - CLO2 74
29 HYDROCHLORIC ACID DOSING SYSTEM 76
30 SODIUM CHLORITE DOSING SYSTEM 77
AUXILLARIES 78
31 SUPERNATANT SUMP 79
32 ODOUR CONTROL UNIT 80
33 STRUVITE CALCULATION 81
34 ALKALINITY BALANCE 85
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 4
1 GENERAL ABBREVIATIONS
2
54 NOTES
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 5
1
4 atm ATMOSPHERE
5 cm CENTIMETER
6 cm² SQUARE CENTI METER
7 d DAY
8 kg KILO GRAMS
9 kJ KILOJOULE
10 kN KILO NEWTON
11 kPa KILO PASCAL
12 kVA KILO VOLT AMPERE
13 kW KILOWATT
14 L LITER
15 LPH LITRE PER HOUR
16 m METRE
17 m² SQUARE METER
18 m³ CUBIC METER
19 mg MILLI GRAM
20 min MINUTES
21 MLD MILLION LITRES PER DAY
22 mm MILLIMETER
23 ML MILLION LITRES
24 MT METRIC TONNE
25 mWC METER OF WATER COLUMN
26 Nos NUMBERS
27 oC DEGREE CELCIUS
28 oK KELVIN
29 s SECONDS
30 deg ANGLE IN DEGREES
31 g GRAM
32 h HOUR
33 hp HORSE POWER
34 J JOULE
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 3
1
2 REFERENCES
3
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
57
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 6
1
4 ENERGY
5 1 Watt - hour (W-h) = 3.6 kiloJoule (kJ)
6 1 Watt - Second (W-s) = 1 Joule (J)
7
8 FLOW:
9
10 1 CUBIC FEET PER SEC (ft³/s) = 0.0283 CUBIC METER PER SECOND (m³/s)
11
12 LENGTH:
13
17 POWER:
18
21 PRESSURE:
22
29 TEMPERATURE:
30
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 7
1
2 FLOW DETAILS
3 Designed as per Contract specifications, Appendix A , Section 4 Design parameters , Page no 9.
4
5 Expansion UNITS
Phase 1
6 Phase
7 DESIGN AVERAGE DAILY FLOW = 300 200 MLD
8 = 300000 200000 m³/d
9 = 12500 8333 m³/h
10 = 3.47 2.31 m³/s
11
4 Functional Guarentee
5 Designed as per Contract specifications, Appendix A , Section 4 Design parameters Table 3 , Page no 10.
6
22
27
35
36
38 Designed as per Contract specifications , Employers Requirements , Section 3.3.10 Hydraulics Page no: 25
39 FLOW VELOCITIES WITHIN PIPES, CONDUITS AND CHANNELS = 0.75 - 2.5 m/s
40
41 SITE DETAILS
42 Designed as per Contract specifications, Employers Requirements , Section 1.3.2 Climate Conditions Page no 11
43
44 RELATIVE HUMIDITY
45 MINIMUM = 40 %
46 MAXIMUM = 90 %
47
51
52
NOTES
53
54
5 WHERE
10 zb = Site Elevation, m
13 T = Temperature, K
14
15 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy. Page no. 1738
16
17 ATMOSPHERIC PRESSURE PREVAILING AT THE SITE Pb = 101325 x exp { - 9.81 x 28.97 ( 30.6 - 0 ) / ( 8314 x ( 35 +273.15) ) }
19 = 0.99 atm
20
21 ATMOSPHERIC PRESSURE PREVAILING AT THE SITE Pb = 101325 x exp { - 9.81 x 28.97 ( 30.6 - 0 ) / ( 8314 x ( 49 +273.15) ) }
23 = 0.989 atm
24
25 ATMOSPHERIC PRESSURE PREVAILING AT THE SITE Pb = 101325 x exp { - 9.81 x 28.97 ( 101.6 - 0 ) / ( 8314 x ( 9 +273.15) ) }
27 = 0.988 atm
30 COD BOD 1
31 1
32 Influent Fractions Value (%) Influent Fractions Value (%) 1
33 Biodegradable 85 Biodegradable 100 1
34 Readily biodegradable (rbs) 20 Readily biodegradable (rbs) 100 1
35 Slowly biodegradable (sbc) 65 Slowly biodegradable (sbc) 0 1
36 Non-Biodegradable 15 Non-Biodegradable 0 1
37 Soluble non biodegradable (nbs) 10 Soluble non biodegradable (nbs) 0 1
38 Particulate non biodegradable (nbp) 5 Particulate non biodegradable (nbp) 0 1
39
40 TSS TKN
41
48 PHOSPHOROUS
49
53
NOTES
55
10
14
17
18 PRIMARY CLARIFIER
29
30 BIOLOGICAL REACTOR
34
35 SPECIFIC SLUDGE PRODUCTION = 0.28 - 0.4 g DS/g COD removed LICENSOR INPUT
36
37 DISC FILTER
38 FILTER CLOTH OPENING = 10 Microns VENDOR DATA
39
41
43
47
48
49
50 NOTES:
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 11
10 ANAEROBIC DIGESTER
11 SOLIDS RETENTION TIME = 15.00 d CONTRACT
12 DESIGN TEMPERATURE FOR DIGESTER = 35.00 deg C
13 GAS PRODUCED PER KG OF VSS DESTROYED ( 1 ATM, 20 DEG C) = 0.9 m3/ kg VSS reduction
14 VSS DESTRUCTION IN DIGESTER = 50.00 %
15
16 BIOGAS HOLDER
17 STORAGE TIME = 30.00% OF GENERATED PER DAY
18
19 BIOGAS SCRUBBER
20 INLET H2S CONCENTRATION = 2000-4000 ppm
21 OUTLET H2S CONCENTRATION < 200 ppm
22
27 SLUDGE DRYER
28 DRIED SOLIDS SIZE > 2.00 mm CONTRACT
29 TOTAL DRY SOLIDS (TS) CONTENT > 90 % CONTRACT
30 TYPE = Belt Dryer
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES:
51
52
53
54
55
56
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 12
PRELIMINARY TREATMENT
CONFIDENTIAL – Not to disclose without authorisation
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 13
1
4 THE PURPOSE OF THIS CHAMBER IS TO RECEIVE THE RAW SEWAGE FROM THE EXISTING MAIN DISTRIBUTION CHAMBER AND
5 SPLIT FLOWS FOR INITIAL PHASE AND EXPANSION PHASE. A FUTURE PIPELINE CONNECTION WITH BLIND FLANGE
6 WILL BE PROVIDED FOR EXPANSION PHASE AFTER FLOW SPLIT.
7 INLET DISTRIBUTION CHAMBER IS COVERED AND CONNECTED TO ODOUR CONTROL UNIT
8
9 UNITS
10 DESIGN AVERAGE FLOW = 500 MLD
11 = 20833 m³/h
12
19 DESIGN BASIS
20
21 NO. OF CHAMBERS = 1 No
22 NO. OF WORKING UNITS = 1 No
23 MAXIMUM DESIGN FLOW THROUGH CHAMBER = 10.42 m³/s
24
25
26 SIZING
27 INLET DISTRIBUTION CHAMBER
28
33
37 THE PURPOSE OF THIS CHAMBER IS TO RECEIVE THE RAW SEWAGE FROM THE INLET DISTRIBUTION CHAMBER AND SEND
38 TO FINE SCREEN CHANNEL
39 FINE SCREEN DISTRIBUTION CHAMBER IS COVERED AND CONNECTED TO ODOUR CONTROL UNIT
40
41 PHASE 1 UNITS
42 DESIGN AVERAGE FLOW = 12500 m³/h
43 = 3.47 m³/s
44
52
53
54
55
56
2 DESIGN BASIS
3
4 NO. OF CHAMBERS = 1 No
5 NO. OF WORKING UNITS = 1 No
6 MAXIMUM DESIGN FLOW THROUGH CHAMBER = 6.25 m³/s
7
8 SIZING
9 FINE SCREEN DISTRIBUTION CHAMBER
10
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
4 PHASE 1 UNITS
5 DESIGN AVERAGE FLOW = 12500 m³/h
6 = 3.47 m³/s
7
14 DESIGN BASIS
15
26
27
𝒉𝒇=𝟎.𝟎𝟕𝟐𝟗 (𝑽𝟏𝟐 −𝒗𝟐𝟐 ) 1
28 WHERE
29 V1 = VELOCITY THROUGH SCREENS = 0.74 m/s 1
30 V2 = VELOCITY IN APPROACH CHANNEL = 0.29 m/s 1
31
35
50 NOTES
51
52
53
54
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 16
1 CLEAR OPENING OF SCREENS = 51.01 %
2 INSIDE WIDTH OF SCREEN CHANNEL PROVIDED = 1.7 m
3 CLEAR AREA OF THE SCREEN = 1.70 m2
4 UPSTREAM VELOCITY OF SCREEN DURING PEAK AVERAGE FLOW = 0.208 m/s
5 VELOCITY THROUGH SCREEN DURING PEAK INSTANTANEOUS FLOW = 0.74 m/s
6 VELOCITY THROUGH SCREEN DURING PEAK AVERAGE FLOW = 0.61 m/s
7 VELOCITY THROUGH SCREEN DURING DESIGN AVERAGE FLOW = 0.41 m/s
8 VELOCITY THROUGH SCREEN DURING DESIGN AVERAGE FLOW (N-1) = 0.51 m/s
9 VELOCITY THROUGH SCREEN DURING PEAK AVERAGE FLOW (N-1) = 0.77 m/s
10 VELOCITY THROUGH SCREEN DURING PEAK INSTANTANEOUS (N-1) = 0.92 m/s
11 DOWNSTREAM VELOCITY OF SCREEN DURING PEAK AVERAGE FLOW = 0.25 m/s
12
18
19
20
21
22 NOTES
23 1 DELETED
24 2 DELETED
25
26
27
28
36
37
38 NOTE 1
39
40
41
42
43 h2
h1 h1
44 h3
45
46
47 w1
b1 b2 b3
48
w2
49
54
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 17
1
27 NOTES
28 1 THE SKETCH IS NOT TO SCALE. DETAILS SHOWN ARE ONLY FOR REPRESENTATION PURPOSE.
29
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 18
1
7 THIS CHAMBER RECEIVES THE SCREENED SEWAGE FROM FINE SCREENS AND DISTRIBUTES TO THE DOWNSTREAM
8 GRIT CHAMBER
9 MOTORIZED SLUICE GATES ARE PROVIDED FOR ISOLATION OF THE AERATED GRIT & GREASE CHANNELS.
10
11 PHASE 1 UNITS
12
23
29 DESIGN BASIS
30
49 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy, Page no. 389
50 WIDTH TO DEPTH RATIO = 1:1 to 5:1
51 LENGTH TO WIDTH RATIO = 3:1 to 5:1
52
53 NOTES
54
55
56
4 Dimensions 1
5 h1 1.31 m 1
h1 A1 h1
6 h2 2.05 m 1
7 h3 1.00 m 1
h
8 h4 1.35 m 1
A2 h4 h5 0.70 m
9 A4 1
h2 A3 h 4.36 m
10 1
11 A5 b2 3.20 m 1
h5
12 b3 1.00 m 1
13 h3 b4 0.40 m 1
14 b2 b3 b4 w 4.60 m 1
15 1
w
16
24 UNIT SIZING
25
33 DESIGN VALIDATION
34
48 AIR REQUIRED FOR ONE METER LENGTH ( 1 ATM, 20 DEG C) = 0.50 Nm³/m.min
49 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy, Page no. 389, Table 5-17.
50 LENGTH OF EACH GRIT CHAMBER = 30.00 m
51 AIR REQUIRED FOR EACH CHAMBER ( 1 ATM, 20 DEG C) = 15.00 Nm³/min
52 = 900.00 Nm³/h
53
54
55
56
12
13 GRIT GENERATION
14
23 GRIT COLLECTED FROM THE GRIT CHAMBER WILL BE TRANSFERRED BY THE GRIT TRANSFER PUMPS
24 TO THE GRIT CLASSIFIER THROUGH PIPE
25 TYPE = SUBMERSIBLE TYPE PUMPS
26
41 GRIT COLLECTED FROM THE GRIT CHAMBER WILL BE TRANSFERRED BY THE GRIT TRANSFER PUMPS TO THE GRIT CLASSIFIER
42 FOG COLLECTED IN THE GREASE CHAMBER WILL BE COLLECTED BY GRAVITY IN THE FOG STORAGE TANK.
43
4 GRIT SKIPS
5
14
15
18 FOG COLLECTED FROM EACH GREASE CHAMBER WILL BE ROUTED TO THE FOG TANK
19 THIS TANK WILL BE COVERED. FOUL AIR WILL BE ROUTED TO THE ODOUR TREATMENT UNIT.
20
36
37
38
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
10
11
12
13
14
15
ED
T
16
E
17
18
E L
D
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52 NOTES
53
54
55
56
10
D
11
E
12
ET
13
L
14
DE
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
5 THE GRIT FREE SEWAGE FLOWS TO THE FLOW DISTRIBUTION CHAMBER TO DIVERT THE PARTIAL FLOWS TO BUFFER TANK
6 BASED ON THE FEEDBACK FROM THE NEREDA CONTROLLER
7 ANY FLOWS EXCESS OF PEAK DESIGN AVERAGE FLOW WILL BE BYPASSED BEFORE ENTERING PARSHALL FLUME
8 IN CASE OF POLLUTED INFLUENT EVENT, THE INFLUENT FLOW SHALL BE BYPASSED FULLY BEFORE ENTERING THE PARSHALL FLUME
9 A PASSIVE OVERFLOW ARRANGEMENT IS PROVIDED BEFORE PARSHALL FLUME, WHICH ALLOWS OVERFLOW OF FLOWS MORE THAN
10 PEAK HOURLY DESIGN FLOW (18750 M3/H) TO BYPASS.
11 PHASE 1 UNITS
12 DESIGN AVERAGE FLOW = 12500.00 m³/h
13 = 3.47 m³/s
14
24
37 SHAPE = RECTANGULAR
38
39 SIZING
40 NO.OF CHAMBERS = 1 Nos
41 RETENTION TIME CONSIDERED = 10.00 sec
42 VOLUME OF TANK REQUIRED = 59.82 m³
43 LENGTH OF THE CHAMBER CONSIDERED = 17.90 m
44 WIDTH OF THE CHAMBER CONSIDERED = 5.70 m
45 LIQUID DEPTH CONSIDERED = 3.03 m
46 FREEBOARD = 0.50 m
47 VOLUME OF CHAMBER PROVIDED = 309.15 m³
48
49
50
51 NOTES
52
53
54
55
56
2 BUFFER TANK
3 Designed as per Contract specifications, Appendix A, Section No. 5.6, Page no 15.
4
5 *PURPOSE OF THE BUFFER TANK IS TO PROVIDE SUFFICIENT BUFFER TIME DURING PEAK INCOMING FLOWS CONDITIONS IN THE
6 INCOMING INFLUENT
8 *BUFFER TANK IS PROVIDED TO FEED FLOWS TO NEREDA REACTOR BASED ON THE FEED BACK FROM THE NEREDA CONTROLLER
9
10 SIZING
11 NO.OF UNITS = 2 Nos
12 VOLUME OF TANK REQUIRED = 9000 m3
13 VOLUME OF EACH TANK PROVIDED BASED ON GLS VENDOR DATA = 5000 m3
14 LIQUID DEPTH = 4.95 m
15 TOTAL HEIGHT OF THE TANK = 5.45 m
16 AREA REQUIRED = 1010 m²
17 DIAMETER OF THE TANK REQUIRED = 35.86 m
18 DIAMETER OF THE TANK PROVIDED = 36.00 m
19 FREEBOARD = 0.50 m
20 VOLUME OF EACH TANK PROVIDED = 5036 m³
21
37 FLOATING SKIMMER
38
50 NOTES
51 1 SHALL BE FINALIZED BASED ON FEED FLOW EXPECTED DURING START UP CONDITION
52 2 DELETED
53
54
55
56
PRIMARY TREATMENT
CONFIDENTIAL – Not to disclose without authorisation
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 27
1
2 PRIMARY TREATMENT
3
6 Designed as per Contract specifications, Appendix A, Section No. 6.1, Page no 16.
7
12 SHAPE = RECTANGULAR
13
Incoming
Sewage to Return flow Return flow Total Load
Parameters Unit
Primary 1 2 at PST inlet
Clarifier
16
38
39
40
41
42
43
44
45
46
47
48
49 NOTES
50
51
52
53
54
2 PRIMARY CLARIFIER
3 Designed as per Contract specifications, Appendix A, Section No. 6.2, Page no 16,17.
4
5 *CLARIFICATION IS A PHYSICAL TREATMENT PROCESS IN WHICH GRAVITY SETTLING OF PARTICLES LEADS TO REMOVAL
6 OF SUSPENDED PARTICLES
7 *EACH OF THE CLARIFIER IS PROVIDED WITH ADEQUATE NUMBER OF PLATES ARRANGED IN ROWS WITH PERIPHERAL LAUNDERS
8 *THE INCLINED PLATE SETTLER HAS SQUARE CONFIGURATION WITH BOTTOM OF CIRCULAR CONFIGURATION SUITABLE
9 FOR SLUDGE SCRAPER MECHANISM
10 *THE COLLECTING LAUNDERS ARE PROVIDED FOR THE CLARIFIER WATER TO OVERFLOW AND RUN TO THE NEXT PROCESS UNIT.
11
29 PLATE DIMENSIONS
30
54 NOTES
55
56
3 DEPTH OF CLARIFIER
4
25 DESIGN VALIDATION
26
33 REMOVAL EFFICIENCY
34
35 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy, Page no.396
36
44
45
46
47
48
49
50
51 NOTES
52 1 DELETED
53
54
55
56
2 SOLID BALANCE
3 =
4 INLET TO PRIMARY CLARIFIER = 366850.32 m³/d
5
6 TSS
7 TSS IN TO PRIMARY CLARIFIER = 196016.90 kg/d
8 = 534.32 mg/L
9 TSS REMOVAL EFFICIENCY = 60.00 %
10 TSS IN TO PRIMARY SLUDGE = 117610.14 kg/d
11
14 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy, Table 5-22, Page no.411.
15
23 BOD5
24
36 VSS
37
46
47
48
49
50 NOTES
51 1 THE BOD5 REMOVAL OF 17% IS CONSIDERED ONLY UNDER MAXIMUM CONCENTRATION CONDITION.
52 REDUCTION IS NOT CONSIDERED FOR MAXIMUM MONTHLY AND AVERAGE INFLUENT CONCENTRATION
53
54
55
56
4 Designed as per Contract specifications, Appendix A, Section No. 6.3, Page no 18.
5
6 *THE SETTLED SLUDGE FROM THE PRIMARY CLARIFIER IS TRANSFERRED TO THE PRIMARY CLARIFIER SLUDGE SUMP
7 *THE WITHDRAWAL OF SLUDGE FROM EACH CLARIFIER IS THROUGH A TIMER CONTROLLED ELECTRICALLY ACTUATED VALVES
8 *THE SLUDGE LINES FROM PRIMARY CLARIFIER ARE PROVIDED WITH MANUAL FLUSHING CONNECTION TO FACILITATE
9 FLUSHING OF PIPELINES.
10 SIZING
11
28 Designed as per Contract specifications, Appendix A, Section No. 6.3, Table 13, Page no 18.
29
30 PRIMARY CLARIFIER SLUDGE PUMPS ARE PROVIDED FOR TRANSFERRING THE SLUDGE FROM THE PRIMARY CLARIFIER SUMP
31 TO PRIMARY SLUDGE BALANCING TANK
32
48
49
50 NOTES
51 1 DELETED
52
53
54
55
56
BIOLOGICAL TREATMENT
CONFIDENTIAL – Not to disclose without authorisation
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 33
1
2 BIOLOGICAL TREATMENT
3
8 *THE CLARIFIED SEWAGE FROM PRIMARY CLARIFIER IS CONVEYED TO THE BIOLOGICAL DISTRIBUTION CHAMBER THROUGH
A CHANNEL CONNECTING THE PRIMARY CLARIFIER OUTLET CHAMBER TO THE BIOLOGICAL TANK DISTRIBUTION CHAMBER.
9 *THE BIOLOGICAL DISTRIBUTION CHAMBER, VIA FIXED WEIR OVERFLOWS, UNIFORMLY DISTRIBUTES THE PRIMARY TREATED
10 SEWAGE TO THE NEREDA REACTORS
11
24 DESIGN BASIS
25 SHAPE = Rectangular
26 DESIGN FLOW = 362999 m³/d
27 = 4.201 m³/s
28 LENGTH OF DISTRIBUTION CHAMBER CONSIDERED = 72.00 m
29 LIQUID DEPTH OF THE CHAMBER PROVIDED = 3.62 m
30 WIDTH OF DISTRIBUTION CHAMBER CONSIDERED = 3.00 m
31
36 PHASE 1 UNITS
37 TYPE = RECTANGULAR
38
44 FEED QUALITY AT THE INLET OF BIOLOGICAL REACTOR MAX CONC AVG CONC
45 BOD5 = 81885 42304 kg/d
46 = 225.58 126 mg/L
47 COD = 164931 86961 kg/d
48 = 454.36 259 mg/L
49 TSS = 78407 25619 kg/d
50 = 216.00 76.45 mg/L
51 TKN = 18783 11724 kg/d
52 = 51.74 34.98 mg/L
53 TP = 2769.96 1614 kg/d
54 = 7.63 4.82 mg/L
55
56
9 SIZING
10
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
2 PHENOL REMOVAL
3 INFLUENT PHENOL = 5.00 mg/l
4 1 KG PHENOL REPRESENTS 2.38 KG COD
5 Reference: Chapter 2, Table 2.1, Handbook biological wastewater treatment by Adrianus Van Haandel
6 EQUIVALENT COD = 11.90 mg/l NOTE 1
7 PHENOL
Refernce:REMOVAL
[1] JournalEFFICIENCY IN BIOLOGICAL
of Environmental REACTOR
Engineering, December 2004, 1415-1421, = 99.96 %
8
[1] Critical Reviews in Biotechnology, 2011; 31(2): 137–152,
9 [1] Bioresource Technology 247 (2018) 1128–1143
10 PHENOL REMOVED IN THE BIOLOGICAL REACTOR = 4.998 mg/l
11
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 COD CONTRIBUTED BY PHENOL IS CONSIDERED AS PART OF TOTAL PLANT INFLUENT COD AND GETS REMOVED IN
52 THE BIOLOGICAL REACTOR
53
54
55
56
4 Designed as per Contract specifications, Appendix A, Section No. 7.3, Page no 20.
5
6 AERATION BLOWERS SUPPLY AIR TO THE AERATION DIFFUSERS INSTALLED IN THE BIOLOGICAL REACTORS
7 ALL AERATION BLOWERS DISCHARGE INTO A COMMON HEADER SYSTEM
8 THE AIR/OXYGEN SUPPLY TO EACH BIOLOGICAL TANK IS ADJUSTED TO THE REQUIRED DEMAND BY CONTROL VALVES
9 AND FLOW METERS.
10
11 PHASE 1 UNITS
12 OXYGEN REQUIREMENT
13
26 MINIMUM SOR PER REACTOR REQUIRED DURING CYCLE = 800 800 kg O2/h
27 TOTAL NOS.OF AIR DIFFUSERS REQUIRED PER BIOLOGICAL REACTOR = 624 624 Nos
30 NOS OF T3.5 TYPE DIFFUSERS IN EACH BIOLOGICAL REACTOR = 312 312 Nos
32
33
34 BLOWER SIZING
37
38 AERATION CAPACITY
47 MAXIMUM NOS OF BLOWERS IN DUTY (ALL REACTOR IN OPERATION) = 8.30 6.10 Nos
49 MAXIMUM NOS OF BLOWERS IN DUTY (N-1) NOS OF REACTORS OPERATION = 10.00 6.31 Nos
51
52 NOTES
54
55
SLUDGE TREATMENT
CONFIDENTIAL – Not to disclose without authorisation
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 39
1
10 PRE THICKENER
11
12 SLUDGE GENERATED FROM THE BIOLOGICAL REACTOR IS DIRECTED TO SECONDARY SLUDGE HOLDING TANK. FROM THIS TANK,
13 AN EQUALIZED FLOW IS PUMPED TO PRE-SLUDGE THICKENER. BACKWASH FROM DISC FILTER IS ALSO FED TO SLUDGE PRE-THICKENER
14 AFTER THICKENING, SUPERNATANT IS RETURNED TO FLOW DISTRIBUTION CHAMBER.
15
16 PHASE 1
17 DESIGN BASIS
18 TYPE = PLATE SETTLERS WITH SCRAPPER MECHANISM
19
23 SIZING
24
29 PLATE DIMENSIONS
30
53 NOTES
54
55
3 DEPTH OF CLARIFIER
4
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 DELETED
52
53
54
55
56
2 SOLIDS BALANCE
3 INLET FLOW TO PRE THICKENER = 62407 m³/d
4 SOLIDS REMOVAL EFFICIENCY = 99.00 %
5 TSS IN SLUDGE = 64560 kg/d
6 CONSISTENCY OF PRE THICKENED SLUDGE = 0.80 %
7 DENSITY OF SLUDGE = 1005 kg/m³
8 PRE-THICKENED SLUDGE GENERATED = 7950 m³/d
9 SUPERNATANT FROM PRE THICKENER = 54458 m³/d
10 PRE THICKENED SLUDGE SOLIDS = 63914 kg/d
11 PRE THICKENED SLUDGE FLOW TO SEC. SLUDGE BALANCING TANK = 7950 m³/d
12
15 SIZING
16 NO OF UNITS = 1 Nos
17 NO OF COMPARTMENTS = 1 No
18 HYDRAULIC RETENTION TIME (HRT) = 1.00 h
19 DESIGN FLOW PER UNIT = 331 m³/h
20 VOLUME OF THE UNIT REQUIRED = 331 m³
21 LIQUID DEPTH IN THE SUMP = 5.15 m
22 AREA OF SUMP REQUIRED = 64.32 m²
23 LENGTH OF SUMP = 9.00 m
24 WIDTH OF SUMP REQUIRED = 7.15 m
25 WIDTH OF SUMP PROVIDED = 7.30 m
26 VOLUME OF THE UNIT PROVIDED = 338 m³
27
28
32 NO OF UNITS = 3 Nos
33 NO OF WORKING UNITS = 2 Nos
34 NO OF STANDBY UNITS = 1 Nos
35 CAPACITY OF EACH PUMP REQUIRED = 166 m³/h
36 CAPACITY OF EACH PUMP PROVIDED = 170 m³/h
37
41 NO OF UNITS = 1 Nos
42 NO OF WORKING UNITS = 1 Nos
43
44
45
46
47
48
49
50 NOTES
51 1 DELETED
52
53
54
55
56
6 THE PRIMARY SLUDGE FROM THE PRIMARY CLARIFIER SLUDGE SUMP AND BIOLOGICAL SLUDGE FROM THE PRE-THICKENED SLUDGE PIT
7 TO PRIMARY AND BIOLOGICAL SLUDGE IS COLLECTED IN SEPARATE SLUDGE BALANCING TANKS WHICH ARE PUMPED AND
8 SECONDARY GRAVITY BELT THICKENERS RESPECTIVELY.
9
14 PHASE 1
15 HOURLY PRIMARY SLUDGE FLOW RATE = 3851 m³/d
16
17 TYPE = RECTANGULAR
18 SIZING
19 NO OF UNITS = 1 No.
20 DESIGN FLOW TO PRIMARY SLUDGE BALANCING TANK = 3851.02 m³/d
21 RETENTION TIME = 1.00 h
22 VOLUME OF TANK REQUIRED = 160.46 m³
23 LIQUID DEPTH IN THE UNIT = 4.50 m
24 AREA OF THE UNIT REQUIRED = 35.66 m²
25
31
35 NO OF UNITS = 2 Nos
36 NO OF WORKING UNITS = 2 Nos NOTE 2
37 CAPACITY OF EACH UNIT REQUIRED = 96.28 m³/h
38 CAPACITY OF EACH UNIT PROVIDED = 97.00 m³/h 1
39
43 NO OF UNITS = 1 No.
44 NO OF UNITS IN WORKING = 1 No.
45
46
47
48
49
50 NOTES
51 1 DELETED
52 2 COMMON STANDBY CONSIDERED FOR PRIMARY THICKENER FEED PUMP AND SECONDARY THICKENER FEED PUMP.
53
54
55
56
8 TYPE = RECTANGULAR
9 SIZING
10 NO OF UNITS = 1 No.
11
25 NO OF UNITS = 4 Nos
26 NO OF WORKING UNITS = 3 Nos
27 NO OF UNITS IN STANDBY = 1 Nos
28 CAPACITY OF EACH UNIT REQUIRED = 132.49 m³/h
29 CAPACITY OF EACH UNIT PROVIDED = 133.00 m³/h
30
45
46
47
48
49
50
51 NOTES
52
53
54
55
56
7 PHASE 1
8 DESIGN BASIS
9 TYPE = GRAVITY BELT THICKENERS
10 =
11 PRIMARY SLUDGE FROM PRIMARY TREATMENT = 3851 m³/d
12 SOLIDS IN PRIMARY SLUDGE FROM PRIMARY TREATMENT@3% = 117610 kg/d
13
14
17 NO OF UNITS = 2 Nos
18 NO OF UNITS IN WORKING = 2 Nos NOTE 3
19
20
23
39 NO OF UNITS = 4 Nos
40 NO OF WORKING UNITS PROVIDED = 3 No.
41 NO OF STANDBY UNITS = 1 No.
42 CAPACITY OF THICKENER WASH WATER PUMP PROVIDED = 17.00 m³/h NOTE - 2
43
48
49
50 NOTES
51
52 1 DELETED
53 2 COMMON BELT WASH WATER PUMPS PROVIDED FOR ALL GRAVITY BELT THICKENERS
54 3 COMMON STANDBY UNIT IS PROVIDED FOR BOTH PRIMARY GBT AND SECONDARY GBT. THE COMMON STANDBY
55 IS ARRIVED BASED ON MAXIMUM HYDRAULIC LOAD AND MAXIMUM SOLID LOAD OF BOTH THE GBT'S.
56
39
40
41
42
43
44
45
46
47
48
49
50
51 NOTES
52
53
54
55
56
6 PHASE 1 UNITS
7 DESIGN BASIS
8 TYPE = GRAVITY BELT THICKENERS
9 =
10 PRETHICKENED SLUDGE = 7950 m³/d
11 SOLIDS IN WASTE ACTIVATED SLUDGE @ 0.8% = 63914 kg/d
12 TOTAL SOLIDS TO THE THICKENER = 63914 kg/d
13 NO OF UNITS = 4 Nos
14 NO OF UNITS IN WORKING = 3 Nos
15 NO OF UNITS IN STANDBY = 1 Nos
16
50 NOTES
51 1 COMMON BELT WASH WATER PUMPS PROVIDED FOR ALL GRAVITY BELT THICKENERS
52 2 COMMON STANDBY UNIT IS PROVIDED FOR BOTH PRIMARY GBT AND SECONDARY GBT. THE COMMON STANDBY
53 IS ARRIVED BASED ON MAXIMUM HYDRAULIC LOAD AND MAXIMUM SOLID LOAD OF BOTH THE GBT'S.
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 47
1
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 48
1
6 THIS SUMP RECEIVES THE PRIMARY THICKENED SLUDGE & THE BIOLOGICAL THICKENED SLUDGE ,
7 BEFORE FEEDING THE HOMOGENOUS SLUDGE TO THE ANAEROBIC DIGESTER
8
9 PHASE 1 UNITS
10 INLET SLUDGE LOADS AT MAX MONTH CONCENTRATION TO DIGESTER.
11
16
24
34 TYPE = RECTANGULAR
35
36 SIZING
37 NO OF UNITS = 1 No.
38 RETENTION TIME REQUIRED = 2.00 h
39 VOLUME OF EACH UNIT REQUIRED = 123.42 m³
40 VOLUME OF EACH UNIT PROVIDED = 158.00 m³
41 LIQUID DEPTH IN THE UNIT = 3.60 m
42 AREA OF THE UNIT REQUIRED = 43.89 m²
43 LENGTH OF THE UNIT = 11.00 m
44 WIDTH OF THE UNIT = 4.00 m
45
46
47
48
49
50
51 NOTES
52
53
54
55
56
5 NO OF UNITS = 6 Nos
6 NO OF WORKING UNITS = 4 Nos
7 NO OF STANDBY UNITS = 2 Nos
8 CAPACITY OF EACH PUMP REQUIRED = 15.43 m³/h
9 CAPACITY OF EACH PUMP PROVIDED = 20.00 m³/h
10
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
6 PHASE 1
7 DESIGN BASIS
8
9 TYPE : ANAEROBIC, MESOPHILIC SINGLE STAGE HIGH RATE DIGESTER, WITH VERTICAL MIXER
10
15
16 SIZING
17
24
25 CYLINDRICAL PART
26
33 SRT
34
42 WHERE
43 Vd = VOLATILE SOLIDS DESTRUCTION, %
44 SRT des = TIME OF DIGESTION, d
45
51
52 NOTES:
53 1 DELETED 1
54 2 DELETED 1
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 51
1
6 GAS PRODUCED PER KG VSS DESTROYED (1 ATM & 20 DEG C) = 0.90 m³/kg
7 BIO GAS PRODUCED (1 ATM & 20 DEG C) = 24677.91 Nm³/d
8 = 1028.25 Nm³/h
9
18 Quantity of VSS in the digested sludge is arrived based on VSS destruction ratio.
19
24 DIGESTER HEATING
25
26 DESIGN BASIS
27
38 HEAT REQUIRED, Q = m Cp dT
39
53 NOTES:
54 1 DELETED
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 52
1
2 TOP CONE
3
25
54 NOTES:
55 1 DELETED
56 2 GRIT AND SCUM CONSIDERED AS PART OF CYLINDRICAL PORTION AND TOP CONE IS FULLY AVIALABLE FOR GAS COLLECTION.
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 53
1
14
42
52 NOTES:
53 1 DELETED
54
55
56
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 54
1
2 HEAT LOSS FROM CYLINDER PART ABOVE GROUND (ACTIVE SLUDGE LIQUID DEPTH')
3
20
49
50 NOTES:
51 1 DELETED
52
53
54
55
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 55
1
4 WHERE
5 HEAT TRANSFER COEFFICIENT = 0.00 0.00 W/(m².K)
6 SURFACE AREA OF CYLINED ABOVE GROUND = 837.77 837.77 m2
7 DIGESTER TEMPERATURE = 35.00 35.00 deg C
8 GROUND TEMPERATURE = 20.00 30.00 deg C
9
56
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 56
1
10 DESIGN BASIS
11 HEAT REQUIRED FOR SLUDGE HEATING = 1392.00 0.00 kW
12 HEAT LOSS FROM ALL DIGESTERS CONSIDERED = 90.78 -48.88 kW
13 TOTAL HEAT REQUIREMENT = 1482.78 -48.88 kW
14
37 NUMBER OF PUMPS = 8
38 NUMBER OF PUMPS IN OPERATION = 4 Nos
39 NUMBER OF STAND-BY PUMPS = 4 Nos
40
48
49
50 NOTES:
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 57
1
11 HENCE,
12 MIXED SLUDGE TEMPERATURE
13 = 31.25 deg C
14
29 HENCE,
30 OUTLET SLUDGE TEMPERATURE = 31.25 + 5.4
31 = 36.65 deg C
32
40 = 1.16 kWh/(m³.K)
41 HENCE, WATER FLOW TO EACH HEAT EXCHANGER REQUIRED = 500 / [ 1.16 x ( 80 - 60 ) ]
42 = 21.55 m³/h
43
44
45
46
47
48
49
50 NOTES:
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 58
1
26 DESIGN BASIS
27 HEAT REQUIRED FOR SLUDGE HEATING = 1392.00 0.00 kW
28 HEAT LOSS FROM ALL DIGESTERS CONSIDERED = 90.78 -48.88 kW
29 TOTAL HEAT REQUIREMENT = 1482.78 -48.88 kW
30
54 NOTES
55 1 DELETED
56 2 THE HOT WATER GENERATOR WILL BE USED FOR NORMAL OPRATION i.e DIGESTER HEATING 1
57 AND HOT WATER VAPORISER WILL BE TAKEN TO OPERATION IF ONE SLUDGE DRYER IS OUT OF
58 OPERATION OR MAINTENANCE
59 3 BURNERS IN THE HOT WATER GENERATOR HAS BEEN DESIGNED FOR DUAL FUEL SOURCE (BIOGAS AND DIESEL)
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 59
1
2 BIOGAS HOLDER
3
6 THE PRODUCED BIOGAS WILL BE STORED AND WILL BE UTILIZED AS A PRIMARY SOURCE OF ENERGY FOR THE DRYER
7 EXCESS GAS WILL BE USED IN GENERATION OF HOT WATER.
8 HOT WATER GENERATOR IS DESIGNED TO HANDLE FULL BIOGAS PRODUCED DURING NON-OPERATIONAL
9 PERIOD OF ONE OF THE DRYERS.
10 PHASE 1
11 DESIGN BASIS
12
13
19 NO OF UNITS = 2 Nos
20 NO OF WORKING UNITS = 2 Nos
21
22
29 NO OF UNITS = 4 Nos
30 NO OF WORKING UNITS = 2 Nos
31 NO OF STANDBY UNITS = 2 Nos
32
33 BIOGAS BLOWER
34 TYPE = LOBE BLOWER
35
36 NO OF UNITS = 3 Nos
37 NO OF WORKING UNITS = 2 Nos
38 NO OF STANDBY UNITS = 1 No
39 CAPACITY OF EACH BLOWER REQUIRED, @ 1 ATM & 20 DEG C = 514.12 Nm³/h
40 CAPACITY OF EACH BLOWER PROVIDED, @ 1 ATM & 20 DEG C = 520.00 Nm³/h
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 DELETED
52
53
54
55
56
2 BIOGAS SCRUBBER
3
6 TO REMOVE H2S FROM THE BIOGAS WHICH MIGHT CAUSE CORROSION TO PIPELINES & EQUIPMENT.
7
10 DESIGN BASIS
11
15 GAS SCRUBBER
16
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1. DELETED
52
53
54
55
56
6 DIGESTED SLUDGE FROM SLUDGE DIGESTERS WILL BE TRANSFERRED TO THE CENTRIFUGE FEED SUMP BY GRAVITY
7
8 PHASE 1
9 TYPE = RECTANGULAR
10
14 SIZING
15 NO OF SUMPS = 1 No.
16 DESIGN FLOWRATE TO THE SUMP = 61.71 m³/h
17 HYDRAULIC RETENTION TIME = 4.00 h
18 VOLUME OF SUMP REQUIRED = 246.85 m³
19 VOLUME OF SUMP PROVIDED = 260.00 m³
20 LIQUID DEPTH IN THE SUMP = 8.65 m 1
21 AREA OF THE SUMP REQUIRED = 30.06 m²
22 LENGTH OF THE SUMP = 6.70 m
23 WIDTH OF THE SUMP REQUIRED = 4.49 m
24 WIDTH OF THE SUMP PROVIDED = 4.50 m
25
30 NO OF PUMPS = 4 Nos
31 NO OF WORKING PUMPS = 3 Nos
32 NO OF STANDBY PUMPS = 1 No
33 OPERATING HOURS = 20.00 h
34 CAPACITY OF EACH PUMP REQUIRED = 24.68 m³/h
35 CAPACITY OF EACH PUMP PROVIDED = 30.00 m³/h
36
41 NO OF UNITS = 2 Nos
42 NO OF WORKING UNITS = 2 Nos
43
44
45
46
47
48 NOTES
49 1 DELETED
50
51
52
53
54
55
56
6 THE DIGESTED SLUDGE FROM ANAEROBIC DIGESTER IS DEWATERED USING CENTRIFUGE AND POLYMER IS ALSO ADDED TO AID
7 DEWATERING.
8
9 PHASE 1 UNITS
10 DESIGN BASIS
11
24 DEWATERED CAKE
25 SOLIDS CAPTURE IN DEWATERING UNIT = 95.00 %
26 DEWATERED SLUDGE CONSISTENCY = 25.00 %
27 DEWATERED SLUDGE DENSITY = 1176 kg/m³
28
45 DRY POLYMER POWDER IS USED AS COAGULANT FOR DEWATERING PURPOSE. AUTO POLY DOSING UNIT (PDU) IS PROVIDED
46 WHICH WILL HAVE A TANK WITH THREE COMPARTMENTS IN SERIES AND PREPARES SOLUTION OF STRENGTH 0.5 %.
47 ONLINE DILUTION IS DONE TO MAKE IT 0.1%
48
49
50 NOTES
51
52
53
54
55
56
15
31 WET SILO IS PROVIDED WITH SLIDING FRAME AT THE BOTTOM OF THE SILO TO PREVENT SETTLING OF SLUDGE
32 CONVEYORS ARE PROVIDED AT BOTTOM OF SILO TO TRANSFER THE SLUDGE FROM SILO TO DRYER FEED PUMP SUCTION
33
48
49
50
51 NOTES
52 1 DELETED
53
54
55
56
2 SLUDGE DRYER
3
6 DEWATERED SLUDGE FROM WET SLUDGE SILO IS TRANSFERRED BY DRYER FEED PUMPS TO SLUDGE DRYER
7
9 PHASE 1 UNITS
10 DESIGN BASIS
11
30 EVAPORATION RATE
31
48
49
50 NOTES
51
52
53
54
55
56
2 BUCKET ELEVATORS ARE PROVIDED TO TRANSFER THE SLUDGE DRYER OUTLET OF DRY SILO
3
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 TYPE OF CONVEYING SYSTEM WILL BE DECIDED DURING DETAILED ENGINEERING
52
53
54
55
56
TERTIARY TREATMENT
CONFIDENTIAL – Not to disclose without authorisation
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 67
1
6 DESIGN BASIS
7 CHEMICAL PHOSPHORUS REMOVAL CONSIDERED FOR DESIGN = 2.00 mg/l
8 = 616.60 kg/d
9
54 NOTES
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 68
1
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 69
2 TERTIARY TREATMENT
3
8 PHASE 1 UNITS
9 DESIGN AVERAGE FLOW = 308299 m³/d
10 = 85.64 m³/s
11 PEAK AVERAGE FLOW = 458299 m³/d
12 = 127.31 m³/s
13
14 DESIGN BASIS
15
23 DISC FILTER
24
25 NO OF UNITS = 10 Nos
26 NO OF WORKING UNITS = 9 Nos
27 NO OF STANDY BY UNITS = 1 No.
28 CAPACITY OF EACH DISC FILTER REQUIRED = 34255 m³/d
29 CAPACITY OF DISC FILTER PROVIDED = 34300 m³/d
30 HYDRAULIC CAPACITY PROVIDED DURING PEAK FLOW = 45830 m³/d
31
34
40
41 DESIGN PARAMETERS
42 DESIGN INLET TSS CONCENTRATION = 41.00 mg/L
43 OUTLET TSS COCENTRATION = 10.00 mg/L
44 OUTLET TURBIDITY = 5.00 NTU
45
46
47
48
49
50 NOTES
51 1 DELETED
52
53
54
55
56
17 NO OF UNITS = 1 No.
18 LENGTH OF SUMP = 12.79 m
19 WIDTH OF SUMP = 8.50 m
20 LIQUID DEPTH OF SUMP = 3.00 m
21 VOLUME OF SUMP PROVIDED = 326 m³
22
23
26 TYPE = SUBMERSIBLE
27
28 NO OF UNITS = 3 Nos
29 NO OF WORKING UNITS = 2 Nos
30 NO OF STANDY BY UNITS = 1 No
31 CAPACITY OF EACH PUMP REQUIRED = 160.57 m³/h
32 CAPACITY OF EACH PUMP PROVIDED = 200.00 m³/h
33
36 THIS CHAMBER RECEIVES FLOW FROM ALL DISK FILTERS. AND FROM THERE THE FLOW IS TRANSFERRED TO PLANT WATER SUMP AND
37 TSE FINAL COLLECTION CHANNEL
38 DESIGN FLOW = 12524.66 m³/h
39
50
51 NOTES
52 1 DELETED
53
54
55
56
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51
52
53
54
55
56
6 TREATED SEWAGE FROM THE DISC FILTER IS UTILIZED FOR MULTIPLE PURPOSES IN SEWAGE TREATMENT PLANT
7 WHICH ARE LISTED BELOW
8 #SERVICE WATER PUMPS – UTILIZED FOR FLUSHING SLUDGE LINES AND CHEMICAL PREPARATION
9 SERVICE WATER PUMPS ARE THE SOURCE FOR FINE SCREEN CLEANING, SERVICE WATER REQUIREMENTS FOR
10 SCREENING COMPACTOR, GRIT CLASSIFIER AND CHEMICAL ONLINE DILUTION OF AUTOPOLY SYSTEMS IN PLANT.
11 #BELT WASH WATER TRANSFER PUMPS – FOR CLEANING THE BELT IN GRAVITY BELT THICKENER
12 #DILUTION WATER PUMPS FOR CLO2 – FOR CHEMICAL PREPARATION OF CLO2
13 #DRYER SERVICE WATER TRANSFER PUMPS – FOR COOLING THE OFF GAS FROM DRYER.
14
15 PHASE 1 UNITS
16 PLANT WATER SUMP
17
18 TYPE = RECTANGULAR
19
20 SIZING
21
54 NOTES
55 1 DELETED
56
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 DATA PROVIDED ARE TENTATIVE. WILL BE UPDATED BASED ON VENDOR DURING DETAILED ENGINEERING
52
53
54
55
56
6 TREATED SEWAGE FROM THE DISC FILTER FLOWS TO CHLORINE CONTACT TANK (CCT)
7 TREATED SEWAGE WILL BE DOSED WITH CHLORINE SOLUTION AS CLO2 AT REQUISITE DOSING RATE FOR DISINFECTION IN CCT
8
10 PHASE 1
11 DESIGN AVERAGE FLOW = 12525 m³/h
12 = 3.48 m³/s
13 PEAK AVERAGE FLOW = 19096 m³/h
14 = 5.30 m³/s
15
16 DESIGN BASIS
17
28 NO OF UNITS = 1 No.
29 HYDRAULIC RETENTION TIME HRT CONSIDERED = 30.00 sec
30 VOLUME OF THE UNIT REQUIRED = 104.37 m³
31 VOLUME OF THE UNIT PROVIDED = 105.00 m³
32 LIQUID DEPTH IN THE UNIT = 4.60 m
33 WIDTH IN THE UNIT = 5.00 m
34 LENGTH OF THE UNIT REQUIRED = 4.55 m
35 LENGTH OF THE UNIT PROVIDED = 5.00 m
36
44 PASS LENGTH IS ARRIVED DEDUCTING THE LENGTH OCCUPIED BY INLET AND OUTLET CHAMBERS. VOLUME OF CCT IS ARRIVED
45 DEDUCTING THE VOLUME OCCUPIED BY INLET AND OUTLET CHAMBERS.
46
47
48
49
50
51 NOTES
52
53
54
55
56
2 BAFFLE SIZING
3
14 LC/WC = 40.00
15
16 Reference : Waste Water Engineering – Treatment and Reuse, 4th Edition, Metcalf & Eddy, Page No. 1272.
17 The Recommended length to width ratio for Chlorine contact tank shall be of at least 20 to 1, and Preferably 40 to 1.
18
25 CHLORINE DIOXIDE REACTOR IS PROVIDED FOR DISINFECTION OF THE TREATED SEWAGE FROM DISC FILTER
26
36 CHLORINE DIOXIDE IS GENERATED USING ACID-CHLORINE TECHNOLOGY ACCORDING TO THE FOLLOWING REACTION
37
38
39
40
41
45
49
50 NOTES
51 1 BAFFLE THICKNESS WILL BE BASED ON CIVIL DESIGN CRITERIA
52
53
54
55
56
29
37
47
48
49
50 NOTES
51
52
53
54
55
56
29
37
47
48
49
50 NOTES
51
52
53
54
55
56
AUXILLARIES
2 SUPERNATANT SUMP
3
6 SUMP IS PROVIDED TO COLLECT THE ENTIRE PROCESS UNIT RECYCLES I.E. SUPERNATANT FROM GRAVITY BELT THICKENERS ,
7 CENTRATE FROM CENTRIFUGE UNITS AND RECYCLED BACK TO FLOW DISTRIBUTION CHAMBER
8
9 PHASE 1 UNITS
10 DESIGN BASIS
11
12 TYPE = SQUARE
13
14 DESIGN FLOW RATE TO THE UNIT (AVERAGE FLOW MAX MONTH) = 10861 m³/d
15 FLOW RATE UNDER AVERAGE FLOW MAX CONDITION = 12392 m³/d
16 (NOT FOR DESIGN CASE ONLY FOR INFORMATION)
17
18 SIZING
19 NO OF UNITS = 1 No.
20 DESIGN FLOW PER UNIT = 452.54 m³/h
21 HYDRAULLIC RETENTION TIME = 0.50 h
22 VOLUME OF UNIT REQUIRED = 226.27 m³
23 LIQUID DEPTH IN THE UNIT = 2.50 m
24 LENGTH OF THE TANK PROVIDED = 13.80 m
25 WIDTH OF THE TANK PROVIDED = 13.80 m
26 VOLUME OF UNIT PROVIDED = 476 m³
27
28
29 SUPERNATANT PUMPS
30
31 TYPE = SUBMERSIBLE
32
33 NO OF UNITS = 4 Nos
34 NO OF WORKING UNITS = 3 Nos
35 NO OF STANDBY UNITS = 1 No.
36 OPERATING HOURS = 20.00 h
37 CAPACITY OF EACH PUMP REQUIRED = 181.01 m³/h
38 CAPACITY OF EACH PUMP PROVIDED = 410.00 m³/h
39
40
41
42
43
44
45
46
47
48
49
50 NOTES
51 1 PLANT DRAINS WILL BE COLLECTED IN THE SUPERNATANT SUMP AND TO BE PUMPED BACK ALONG WITH RETURNS TO
52 UPSTREAM OF PRIMARY SETTLER.
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 80
1
30
31
32
48
49
50 NOTES:
51 1 DELETED
52
53
54
55
56
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 81
1 STRUVITE CALCULATION 1
2
3 DESIGN BASIS 1
4
5 DESIGN SLUDGE FLOW TO DIGESTER = 1481 m³/d 1
6 1
7 PHOSPHORUS LEVELS IN THE PRIMARY THICKENED SLUDGE = 180 kg/d 1
8 PHOSPHORUS LEVELS IN THE SECONDARY THICKENED SLUDGE = 1116 kg/d 1
9 PHOSPHORUS LEVELS IN THE TERTIARY THICKENED SLUDGE = 212 kg/d 1
10 TOTAL PHOSPHORUS LEVELS TO THE INLET OF ANAEROBIC DIGESTER = 1508 kg/d 1
11
12 SECONDARY PHOSPHORUS RELEASE 1
13 EXPECTED PHOSPHORUS RELEASE IN THE DIGESTER OF TOTAL PHOSPHORUS = 43 - 63 % NOTE-1 1
14 CONSIDERED FOR DESIGN = 53% 1
15
16 SECONDARY SLUDGE TO DIGESTER 1
17 % OF LUXURY PHOSPHORUS UPTAKE IN SEC. THICKENED SLUDGE = 4.40 % NOTE-2 1
18 % OF P IN THE VSS PORTION OF SLUDGE (UNDER NORMAL OPERATION) = 2.57 % NOTE-2 1
19 % OF P IN THE TSS PORTION OF SLUDGE (UNDER NORMAL OPERATION) = 1.80 % NOTE-2 1
20 1
21 TSS IN THE SECONDARY THICKENED SLUDGE FROM NEREDA REACTORS = 25205.40 kg/d 1
22 VSS IN THE SECONDARY THICKENED SLUDGE FROM NEREDA REACTORS = 20226.22 kg/d 1
23 RELEASE OF LUXURY PHOSPHORUS IN THE DIGESTER = 85.00 % 1
24 = 557.04 kg/d 1
25
26 VSS DESTRUCTION OF SEC. THICKENED SLUDGE IN DIGESTER = 25.00 % 1
27 RELEASE OF PHOSPHOURS IN DIGESTER DUE TO VSS DESTRUCTION = 129.95 kg/d 1
28
29 TERTIARY SLUDGE TO DIGESTER 1
30 FERRIC CHLORIDE SLUDGE GENERATED FOR PHOSHPORUS REMOVAL = 1379.81 kg/d 1
31 SOLIDS IN DISC FILTER DIRTY BACKWASH = 4348.86 kg/d 1
32 TP AS METAL SLUDGE IN THE DISC FILTER DIRTY BACKWASH = 211.66 kg/d 1
33
34 PRIMARY SLUDGE TO DIGESTER 1
35 PHOSPHORUS AVAILABLE IN THE VSS OF PRIMARY THICKENED SLUDGE = 179.92 kg/d 1
36 VSS DESTRUCTION OF PRIMARY THICKENED SLUDGE IN DIGESTER = 65.00 % 1
37 RELEASE OF PHOSPHORUS IN DIGESTER DUE TO VSS DESTRUCTION = 116.95 kg/d 1
38
39 TOTAL PHOSPHORUS RELEASE 1
40 TOTAL RELEASE OF PHOSPHORUS FROM DIGESTER = 804 kg/d 1
41 = 542.80 mg/L 1
42 TOTAL RELEASE OF PHOSPHORUS IN RATIO WITH TOTAL PHOSPHORUS = 53% 1
43 Hence OK 1
44
45 STRUVITE FORMATION 1
46
47 PHOSPHORUS AS PO4 AVAILABLE FOR STRUVITE FORMATION = 2460.07 kg/d 1
48 PERCENTAGE OF CONVERSION OF PO4 TO STRUVITE, CONSIDERED = 60.00 % NOTE-3 1
49 PHOSPHORUS AS PO4 CONSUMED FOR STRUVITE FORMATION = 1476.04 kg/d 1
50
51 NOTES 1
DATA AS IN TABLE 18.7 OF PHOSPHORUS IN ENVIRONMENTAL
52 1 1
TECHNOLOGY HANDBOOK EDITED BY EUGENIA VALSAMI-JONES
53 2 DATA AS PER NEREDA DESIGN 1
54 3 SLIGHTLY HIGHER STRUVITE FORMATION POSSIBLE HOWEVER CONSIDERED 60% AS CONSERVATIVE VALUE. 1
55
56
57
58
59
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 82
1 STRUVITE FORMATION HAPPENS WHEN MAGNESIUM, AMMONIA AND PHOSHPHORUS ARE AVAILABLE IN EQUAL MOLAR RATIO OF 1:1:1 1
2 1
3 MOLES OF PO4 IN THE STRUVITE FORMED = 15.5 kg-mol 1
4 MAGNESIUM REQUIRED FOR STRUVITE FORMATION = 378.00 kg 1
5 MAGNESIUM IN THE INFLUENT = 167 mg/L NOTE-1 1
6 = 247.34 kg 1
7
8 MAGNESIUM RELEASED BY PAO ALONG WITH LUXURY PHOSPHORUS RELEASE = 0.29 mol Mg/mol P 1
9 = 7.52 mol Mg 1
10 = 182.75 kg Mg/d 1
11
12 MAGNESIUM RELEASED DUE TO VSS DESTRUCTION OF PRIMARY SLUDGE & SECONDARY SLUDGE NOT CONSIDERED' 1
13 TOTAL MAGNESIUM AVAILABLE FOR STRUVITE FORMATION = 430.10 >378 kg/d 1
14 = 290.39 mg/L 1
15 EXCESS MAGNESIUM AVAILABLE = 14% 1
16
17 AMMONIUM REQUIRED FOR STRUVITE FORMATION = 280.00 kg/d 1
18 NH4-N AVAILABLE IN THE DIGESTER = 282.55 kg/d 1
19 AS NH4 (AMMONIUM) AVAILABLE IN THE DIGESTER = 366.95 >280 kg/d 1
20 = 247.75 mg/l 1
21 EXCESS AMMONIUM AVAILABLE = 31% 1
22
23 STRUVITE FORMATION = 3808.18 kg/d 1
24 = 2571.20 mg/l 1
25
26 CHECKING BASED ON SOLUBILITY PRODUCT CONSTANT 1
27 1
28 1
29 WHERE, C IS IN MOL/L 1
30 1
31 KSP OF THE STRUVITE FORMED = 6.03 1
32 1
33 1
34 1
35 AT THIS SOLUBILITY PRODUCT CONSTANT 1
36 MOST OF THE STRUVITE WILL BE IN THE 1
37 PRECIPITATED FORM. 1
38 1
39 1
40 1
41 1
42 1
43 1
44 1
45 1
46 1
47 1
48 1
49 1
50
51
52 TOTAL SOLUBLE PHOSPHORUS AVAILABLE AFTER STRUVITE FORMATION = 321.58 kg/d 1
53
54 NOTES 1
55 1 VALUE BASED ON WATER ANALYSIS DONE ON THE EXISTING INFLUENT TO JA1 SITE WWTP. 1
56
57
58
59
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 83
1 CALCIUM PHOSHPHATE PRECIPITATION 1
2 1
3 PART OF PHOSPHATE IN THE EXCESS SLUDGE WILL BE AS CALCIUM PHOSPHATE AND WILL NOT GET AFFECTED BY ANAEROBIC PROCESS & 1
4 WILL BE PART OF THE DEWATERED SLUDGE. HOWEVER SAME IS NOT CONSIDERED HERE. 1
5
6 TYPE OF CALCIUM PHOSPHATE FORMATION EXPECTED IN DIGESTER WILL BE HYDROXYAPATITE (HAP) FORMATION Ca5. (PO4)3. OH 1
7 1
8 CALCIUM PRESENT IN THE INFLUENT = 385.00 mg/L as CaCO3 1
9 = 154.00 mg/L NOTE-1 1
10 = 228.09 kg/d 1
11
12 CALCIUM RELEASED BY PAO ALONG WITH LUXURY PHOSPHORUS RELEASE = 0.08 mol Mg/mol P 1
13 = 2.07 mol Ca 1
14 = 83.20 kg Ca/d 1
15
16 TOTAL CALCIUM AVAILABLE = 311.28 kg/d 1
17
18 CALCIUM REQUIRED TO FORM HAP OVER THE STOICHIOMETRIC REQUIREMENT = 1.67 1
19 CALCIUM CONSIDERED AVAILABLE FOR HAP FORMATION = 186.40 kg/d 1
20 PHOSPHORUS CONSUMED FOR HAP FORMATION = 86.46 kg/d 1
21
22
23 PERCENTAGE OF PHOSPHORUS CONSIDERED FOR HAP FORMATION DUE TO = 75% 1
24 OTHER INTERFERENCES - ASSUMPTION = 64.84 kg/d 1
25
26 PHOSHPHATE ADSORPTION 1
27
28 CALCIUM WILL BE PRESENT ALSO IN THE FORM OF CALCIUM CARBONATE. 1
29
30 FERRIC CHLORIDE DOSED UPSTREAM OF DISK FILTER AS 1.5 TIMES OF STOICHEMETRIC IRON REQUIREMENT CONSIDERING POSSIBLE 1
31 FORMATION OF FERRIC HYDROXIDE, WHICH IS PART OF TERTIARY SLUDGE 1
32
33 THE FERRIC HYDROXIDE METAL SLUDGE AND CALCIUM CARBONATE AVAILABLE IN THE DIGESTER ACTS AS SITES FOR SOLUBLE 1
34 PHOSPHATES TO ADSORB TO ITS SURFACES. 1
35 1
36 EXPECTED ADSORPTION OF SOLUBLE PHOSPHORUS TO CALCIUM CARBONATE, = 25 - 50% kg/d NOTE-2 1
37 FERRIC HYDROXIDE SLUDGE SURFACES. 1
38 ADSORPTION CONSIDERED ON THE TOTAL RELEASED PHOSPHORUS = 30% 1
39 = 241.18 kg/d 1
40 1
41 REMAINING PHOSPHORUS IN SOLUBLE FORM = 15.55 kg/d 1
42
43
44
45
46
47
48
49
50
51 NOTES 1
52 1 VALUE BASED ON WATER ANALYSIS DONE ON THE EXISTING INFLUENT TO JA1 SITE WWTP. 1
53 2 DATA FROM INTERNATIONAL CONFERENCE ON NUTRIENT RECOVERY FROM WASTEWATER - KEN ASHLEY, DON MAVINIC 1
54 - IWA PUBLISHING 1
55 3 STRUVITE PRECIPITATION ASSESSMENT IN ANAEROBIC PROCESSES - N.MARTI, A.BOUZAS, J.FERRER 1
56
57
58
59
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 84
1
2 DEWATERING CENTRIFUGE 1
3 FEED FLOWRATE TO CENTRIFUGE = 1483.94 m3/d 1
4 TOTAL SOLIDS FLOWRATE TO CENTRIFUGE = 53272 kg/d 1
5 TSS REMOVAL EFFICIENCY = 95.00 % 1
6 SOLIDS IN THE CENTRATE = 2663.59 kg/d 1
7 CENTRIFUGE CAKE DISCHARGED = 172.14 m3/d 1
8 CENTRATE FLOW RATE = 1311.8 1
9
10 TOTAL PHOSPHORUS FED TO CENTRIFUGE = 1508.26 kg/d 1
11 SOLUBLE PHOSPHORUS IN THE FEED TO CENTRIFUGE = 15.55 kg/d 1
12 = 10.48 mg/L 1
13 TP AS SOLIDS AND PART, ADSORBED TO SOLIDS IN CENTRIFUGE FEED = 1492.71 kg/d 1
14
15 PHOSPHORUS IN THE DEWATERED SLUDGE = 1419.88 kg/d 1
16 PHOSPHORUS IN THE CENTRATE = 88.38 kg/d 1
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51 NOTES 1
52
53
54
55
56
57
58
59
REVISION
JEDDAH AIRPORT 2 INDEPENDENT SEWAGE TREATMENT PLANT (ISTP)
CLIENT DOCUMENT NUMBER DOCUMENT TITLE Rev Page
STP-Ph1-JWWF-P05-00-0002 PROCESS DESIGN CALCULATIONS 2 85
1
2 ALKALINITY BALANCE
3 PHASE 1 UNITS
4 DESIGN BASIS
5
54 HENCE IT CAN BE CONCLUDED THAT ENOUGH ALKALINITY IS AVAILABLE IN WASTEWATER FOR PLANT PERFORMANCE. MOREOVER 1
55 THE ALKALINITY GAIN FROM THE ANAEROBIC DIGESTER IS NOT CONSIDERED WHICH WILL BE A SIGNIFICANT CONTRIBUTOR. 1
56
57 NOTES 1
58
59