. 194,955,352,000.00 ************ Model (1-3): 1
. ************ ************ ************ ************
Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan se ***
************ ribu juta milyar ***
************ 194955352000 ***
************ ****************************** ************ ************ ************ ************
************ 000 1 ***
************ 0 ***
************ sepuluh ***
************ 0 ***
************ 0 ***
************ ***
************ ***
************ ***
************ ***
************ 352 2 ***
************ 3 lima puluh ***
************ tiga ratus dua belas ***
************ 5 dua ***
************ 2 lima puluh dua ***
************ lima puluh dua lima puluh dua ***
************ tiga ratus lima puluh dua ribu ***
************ ***
************ ***
************ 955 3 ***
************ 9 lima puluh ***
************ sembilan ratus lima belas ***
************ 5 lima ***
************ 5 lima puluh lima ***
************ lima puluh lima lima puluh lima ***
************ sembilan ratus lima puluh lima juta ***
************ ***
************ ***
************ 194 4 ***
************ 1 sembilan puluh ***
************ seratus empat belas ***
************ 9 empat ***
************ 4 sembilan puluh empat ***
************ sembilan puluh empat sembilan puluh empat ***
************ seratus sembilan puluh empat milyar ***
************ ***
************ 000 1 ***
************ 0 ***
************ sepuluh ***
************ 0 ****
************ 0 ***
************ ***
************ ***
************ 109 00 0 ***
************ 109 ************ ************ ************
109 00 seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
************ seratus sembilan puluh empa seratus semb * seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
************ seratus sembilan puluh empa seratus semb * seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
1 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
2 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
3 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
************ ****************************** ************ ************ ************ ************
a ribu rupiah.
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah
ma puluh dua ribu rupiah.
ma puluh dua ribu rupiah.
ma puluh dua ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA
B PEKERJAAN PERSIAPAN
Papan nama proyek 1,500,000.00
Direksi keet dan gudang sementara 35,000,000.00
Pagar pengaman di lokasi pekerjaan 135,000,000.00
Mobilisasi dan Demobilisasi 40,000,000.00
Laporan, shop drawing, dokumentasi 60,000,000.00
SUB.TOTAL 271,500,000.00
F BANGUNAN OPERASI
PEKERJAAN TANAH 54,250,000.00
PEKERJAAN PASANGAN DAN BETON 485,480,000.00
PEKERJAAN KUSEN DAN PINTU ALUMUNIUM 50,497,000.00
PEKERJAAN ATAP 348,558,000.00
PEKERJAAN SANITER 22,606,000.00
PEKERJAAN LISTRIK PENERANGAN 3,414,000.00
PEKERJAAN FINISHING 148,655,000.00
SUB.TOTAL 1,113,460,000.00
G PEKERJAAN M&E
PEKERJAAN POMPA DOSING DAN TANKI KIMIA 3,525,292,000.00
PEKERJAAN INSTRUMENTASI 3,311,000,000.00
PEKERJAAN KOMPRESOR DAN PIPA UDARA BERTEKANAN 1,568,360,000.00
PEKERJAAN SISTEM OTOMATISASI (SCADA SYSTEM) 3,242,003,000.00
PEKERJAAN SISTEM UNIT PRODUKSI DAN DISTRIBUSI 25,604,232,000.00
PEKERJAAN PENGADAAN & PEMASANGAN GENSET 3,500,000,000.00
SUB.TOTAL 40,750,887,000.00
H POS JAGA
PEKERJAAN TANAH 5,246,000.00
PEKERJAAN PASANGAN DAN BETON 45,879,000.00
5
NO URAIAN PEKERJAAN JUMLAH HARGA
(Rp.)
1 2 3
PEKERJAAN KAYU DAN ATAP 105,073,000.00
PEKERJAAN LAIN-LAIN 27,216,000.00
SUB.TOTAL 183,414,000.00
I BANGUNAN GENSET
PEKERJAAN TANAH DAN PONDASI 43,328,000.00
PEKERJAAN BETON 67,331,000.00
PEKERJAAN PASANGAN 97,238,000.00
PEKERJAAN KUSEN DAN PINTU 21,183,000.00
PEKERJAAN KUSEN LUBANG UDARA GENSET 31,328,000.00
PEKERJAAN ATAP DAN PLAFOND 134,816,000.00
PEKERJAAN DUDUKAN GENSET 58,273,000.00
PEKERJAAN SALURAN 67,146,000.00
PEKERJAAN FINISHING 36,050,000.00
SUB.TOTAL 556,693,000.00
K KOLAM LUMPUR
PEKERJAAN TANAH 79,851,000.00
PEKERJAAN PASANGAN DAN BETON 245,000,000.00
SUB.TOTAL 324,851,000.00
L POWER SUPPLY
PENYAMBUNGAN DAYA PLN 2,166,750,000.00
SUB.TOTAL 2,166,750,000.00
TERBILANG : Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima
puluh dua ribu rupiah.