You are on page 1of 6

KALAU MAU MENGCOPY HARUS KE BAWAH

* ************
. 194,955,352,000.00 ************ Model (1-3): 1
. ************ ************ ************ ************
Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan se ***
************ ribu juta milyar ***
************ 194955352000 ***
************ ****************************** ************ ************ ************ ************
************ 000 1 ***
************ 0 ***
************ sepuluh ***
************ 0 ***
************ 0 ***
************ ***
************ ***
************ ***
************ ***
************ 352 2 ***
************ 3 lima puluh ***
************ tiga ratus dua belas ***
************ 5 dua ***
************ 2 lima puluh dua ***
************ lima puluh dua lima puluh dua ***
************ tiga ratus lima puluh dua ribu ***
************ ***
************ ***
************ 955 3 ***
************ 9 lima puluh ***
************ sembilan ratus lima belas ***
************ 5 lima ***
************ 5 lima puluh lima ***
************ lima puluh lima lima puluh lima ***
************ sembilan ratus lima puluh lima juta ***
************ ***
************ ***
************ 194 4 ***
************ 1 sembilan puluh ***
************ seratus empat belas ***
************ 9 empat ***
************ 4 sembilan puluh empat ***
************ sembilan puluh empat sembilan puluh empat ***
************ seratus sembilan puluh empat milyar ***
************ ***
************ 000 1 ***
************ 0 ***
************ sepuluh ***
************ 0 ****
************ 0 ***
************ ***
************ ***
************ 109 00 0 ***
************ 109 ************ ************ ************
109 00 seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
************ seratus sembilan puluh empa seratus semb * seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
************ seratus sembilan puluh empa seratus semb * seratus sembilan puluh empat milyar sembilan ratus lima puluh lima
1 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
2 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
3 Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah.
************ ****************************** ************ ************ ************ ************
a ribu rupiah.
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu
yar sembilan ratus lima puluh lima juta tiga ratus lima puluh dua ribu rupiah
ma puluh dua ribu rupiah.
ma puluh dua ribu rupiah.
ma puluh dua ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA

PROGRAM : PEMBANGUNAN IPA KAPASITAS 700 LITER/DETIK


LOKASI : BANJIR KANAL BARAT - JAKARTA

NO URAIAN PEKERJAAN JUMLAH HARGA


(Rp.)
1 2 3

A ENGINEERING DESIGN & SUPERVISI


PEKERJAAN DETAIL ENGINEERING DESIGN (DED) 3,400,000,000.00
SUPERVISI MANAJEMEN KONSTRUKSI 4,250,000,000.00
SUB.TOTAL 7,650,000,000.00

B PEKERJAAN PERSIAPAN
Papan nama proyek 1,500,000.00
Direksi keet dan gudang sementara 35,000,000.00
Pagar pengaman di lokasi pekerjaan 135,000,000.00
Mobilisasi dan Demobilisasi 40,000,000.00
Laporan, shop drawing, dokumentasi 60,000,000.00
SUB.TOTAL 271,500,000.00

C PEKERJAAN INTAKE KAPASITAS 700 L/D


PEKERJAAN TANAH 2,218,941,000.00
PEKERJAAN PASANGAN DAN BETON 5,756,933,000.00
PEKERJAAN BESI 223,316,000.00
PEKERJAAN PASANGAN 148,517,000.00
PEKERJAAN PERPIPAAN 2,584,123,000.00
PEKERJAAN LAIN-LAIN 562,843,000.00
SUB.TOTAL 11,494,673,000.00

D PEKERJAAN IPA KAPASITAS 700 L/D


PEKERJAAN TANAH 13,788,419,000.00
PEKERJAAN PASANGAN DAN BETON 32,939,544,000.00
PEKERJAAN BESI 1,752,086,000.00
PEKERJAAN PERPIPAAN 18,163,129,000.00
PEKERJAAN MEDIA FILTER 745,920,000.00
PEKERJAAN TUBE SETTLER UNIT SEDIMENTASI 4,096,000,000.00
PEKERJAAN LAIN-LAIN 1,897,009,000.00
SUB.TOTAL 73,382,107,000.00

E PEKERJAAN GROUND RESERVOAR 4.000 m3 dan RUANG POMPA


PEKERJAAN TANAH 22,435,035,000.00
PEKERJAAN TIANG PANCANG 6,500,000,000.00
PEKERJAAN BETON DAN PASANGAN 6,910,646,000.00
RUMAH POMPA 256,241,000.00
PEKERJAAN BESI 173,137,000.00
PEKERJAAN PERPIPAAN 1,502,348,000.00
PEKERJAAN LAIN-LAIN 169,087,000.00
SUB.TOTAL 37,946,494,000.00

F BANGUNAN OPERASI
PEKERJAAN TANAH 54,250,000.00
PEKERJAAN PASANGAN DAN BETON 485,480,000.00
PEKERJAAN KUSEN DAN PINTU ALUMUNIUM 50,497,000.00
PEKERJAAN ATAP 348,558,000.00
PEKERJAAN SANITER 22,606,000.00
PEKERJAAN LISTRIK PENERANGAN 3,414,000.00
PEKERJAAN FINISHING 148,655,000.00
SUB.TOTAL 1,113,460,000.00

G PEKERJAAN M&E
PEKERJAAN POMPA DOSING DAN TANKI KIMIA 3,525,292,000.00
PEKERJAAN INSTRUMENTASI 3,311,000,000.00
PEKERJAAN KOMPRESOR DAN PIPA UDARA BERTEKANAN 1,568,360,000.00
PEKERJAAN SISTEM OTOMATISASI (SCADA SYSTEM) 3,242,003,000.00
PEKERJAAN SISTEM UNIT PRODUKSI DAN DISTRIBUSI 25,604,232,000.00
PEKERJAAN PENGADAAN & PEMASANGAN GENSET 3,500,000,000.00
SUB.TOTAL 40,750,887,000.00

H POS JAGA
PEKERJAAN TANAH 5,246,000.00
PEKERJAAN PASANGAN DAN BETON 45,879,000.00
5
NO URAIAN PEKERJAAN JUMLAH HARGA
(Rp.)
1 2 3
PEKERJAAN KAYU DAN ATAP 105,073,000.00
PEKERJAAN LAIN-LAIN 27,216,000.00
SUB.TOTAL 183,414,000.00

I BANGUNAN GENSET
PEKERJAAN TANAH DAN PONDASI 43,328,000.00
PEKERJAAN BETON 67,331,000.00
PEKERJAAN PASANGAN 97,238,000.00
PEKERJAAN KUSEN DAN PINTU 21,183,000.00
PEKERJAAN KUSEN LUBANG UDARA GENSET 31,328,000.00
PEKERJAAN ATAP DAN PLAFOND 134,816,000.00
PEKERJAAN DUDUKAN GENSET 58,273,000.00
PEKERJAAN SALURAN 67,146,000.00
PEKERJAAN FINISHING 36,050,000.00
SUB.TOTAL 556,693,000.00

J TANGKI SOLAR KAP. 30.000 LITER


PEKERJAAN TANAH 2,115,000.00
PEKERJAAN BETON 4,366,000.00
PEKERJAAN PASANGAN BATU KALI 21,149,000.00
PEKERJAAN BESI 361,799,000.00
PEKERJAAN LAIN-LAIN 9,606,000.00
SUB.TOTAL 399,035,000.00

K KOLAM LUMPUR
PEKERJAAN TANAH 79,851,000.00
PEKERJAAN PASANGAN DAN BETON 245,000,000.00
SUB.TOTAL 324,851,000.00

L POWER SUPPLY
PENYAMBUNGAN DAYA PLN 2,166,750,000.00
SUB.TOTAL 2,166,750,000.00

M PEKERJAAN LAND SCAPE


Pagar BRC tinggi 175 cm 119,619,000.00
Pintu BRC tinggi 175 cm , Lebar 4.0 meter 2,740,000.00
Pintu BRC tinggi 175 cm , Lebar 1.0 meter 1,554,000.00
Jalan lingkungan paving block t=8 cm 182,976,000.00
Kanstin paving block 980,000.00
Saluran drainase bentuk dan ukuran sesuai gambar 8,553,000.00
Penanaman rumput gajah 9,790,000.00
Taman dan Penanaman pohon keras 7,500,000.00
Lampu PJU 15,000,000.00
SUB.TOTAL 348,712,000.00

N PEKERJAAN JALAN MASUK SEMENTARA


Pembuatan Jalan Masuk 386,718,000.00
Pembuatan Box Curvert 111,731,000.00
Pembuatan Saluran Pembuang dari Kolam Lumpur 145,114,000.00
SUB.TOTAL 643,563,000.00
TOTAL 177,232,139,000.00
PPN 10% 17,723,213,900.00
GRAND TOTAL 194,955,352,900.00
DIBULATKAN 194,955,352,000.00

TERBILANG : Seratus sembilan puluh empat milyar sembilan ratus lima puluh lima juta tiga ratus lima
puluh dua ribu rupiah.