You are on page 1of 1

ENGINEERING REQUEST

ENG Job No: Requested By: Chaz Cross


SPM Job No: WE1917.006 Request Date: 08-10-22
Business Unit: ROO SW Priority: P4
Client / Site: CPS2
Priority
Client Ref:– 1: 1-2 Days / Priority – 4: 3
TBC
Weeks
TypePriority – 2: 6 DaysOEM
/ Priority – 5: 6 weeks Size Class
Priority – 3:
Globe 2 Weeks
FLV 6” 1500#

Engineering Drawings ☒ RCFA ☐ Method Statement ☐ Condition Report ☐ Other ☐

Engineering Requirement: Component PMI


Material: Attached:
(Y/N)
1. Drawings required for weld repairing RTJ end connection. WCB N

2. Drawings required for weld repairing bonnet. This is for the angle where the WCB N
back-seat screws into.

3. Drawings required for weld repairing the plug bore. F316 N

4. Drawings required for weld repairing secondary inner plug. F316 N

5.

6.

7.

8.

Field Work Pack / Method Statement Required: (SOW) Scope Date:


N/A

Share Point Location (Photos / Job Card):

The below must be checked prior to sending ENG. request (Workshop repairs / RCFA / Condition report)

☒ Job Card Attached / Uploaded ☐ Inspection Photos Uploaded ☐ Not Applicable

DOC-1018-ROO-11-18 Rev 3 21st October 2021


Caterpillar: Confidential Green

You might also like