ITEM DESCRIPTION AMOUI\flT (KES)

I A Block of S-Roomed OfEces


+,Z?1+,L?S--ls
2 One Accommodation Block of 8 Rooms
I i, )*g
D Elevated steel structure with 10m3 plastic tank ",+4k.E;q
'lo 3. re
4 Police Ablution'Two blocks of 4 stances (4 toilets &4 bathroom)
"35c .
4,o.r8, B.Lf . -?s
5 Ferimeter Fence for 1.84acye Police station plot
3, E *d ,7(Ic " Go
t) Grand Total for Offrce Block, Accommodation Ablution Blocks &

GBAND TOTAI.KES ?s, I 1J, l+Se.*Ts


Your quotation should include the following information:
(er.-- -[-[no".** J,
Grand rorar auount *;;- -""*ksr[il Y1 :)]h
q;,,$4:"1 I kh &"c-f T.ve
Lead-Time (Days) to commenee work after receiving the PO:

Ittro. of Days required to complete the wor.k:

Contact Person Name and phoue number..-,

E-Mait address of the company:

Name of the company: ".

Sigrr/Stamp of the company..."..


ITEM DESCRIPfION UNIT QTY RATE fi(ES) AIVIOUNT(KES)

The contractor is reminaled that all concrete works Bust be vibrated usiag a
poker vibrator aud all sched.uling, dioensiouirg, beailiag, End cuttfug of
et€el rainforcomeut for concrete to be as per BS 4456. All ErasoErT work
contractor ehoulil uss grade 1 Natural MaeHime cut etone

I ELEMENT T : DXCAVATIOTI AND EAATIIIIIOBI(.S


1.1 Clear site ofall bushes, grass, sgrubs and Eoots.
tQlvl
sQlr 210.00
"so I lo,.5oe,
Excavate over eite to remove top vegetation soil 200mm to designated site as 182.26
7.2
instrrrctcd hv trlnsineer ? S,r+ 12 L
1.3 Excavate starti*g ftom stripped level a 600mm wide foundation trench to art
average depth of 1500mm (1.6m) in normal soil to be approved by Engineer on
site
CUM 1?4.1 1
e*[ lo +, rtee {
1.4 Backfill end ram sBlected excsvateil uatorials 3Qfirm thick iu Iayets not
exceeiling 150ns
CUIvI 89.46
E..* tthTs<s,
1.5 Carry away surplus excavatetl materials to an approved plaee CUM 84.65 fls*+ "Tl .15 r'5o
Allow for keepilg trenches ftee from water Item
1.G 1.00
F,oeo# eq3
1,? Allow for planking and struthing to uphold sides ofexcavations and for keeping Item 1,00
the same fr'ee fiom fallen rnaterials. 4;-,LleAl c-f!a
Sub'total Ercavstioa and Earthworts
1:
36*^ los".g, +
2 ELEMENI 2: SUBSTE,UCTUBE

2.1 Supply all materials and cast 50mm consrete for blinding concrete ratio 1:4:8 SQM 5.00
Aoo t [+.Scm "
,? Supply and fill 200m4 thick hand packed hardcore (stone); well rolled and
rammed (optional, to be decided on site)
CUM 17.S5
3.s"-. I 53 Bs-
2,S Supply aod lay 50mm thick murram blinding to top of hardcore under strip
footing as directed by Engineer
SQM 8S.46
3oof p a3a
2.4 Supply anil flr steel bars in foundation conerete work including cutting, KG 398.00
ben.{ing, hoisting and tying wire and supporting all in position, 3Y12 @ 200 as
I q 5t}) +
2.5
directed bv Ensi:reer on site
Supply anil flr steel bars in foundation eoncrete work including cutting, I{G 296.00 "5.t -fno.:of I

bending, hoisting, and tying rvile and oupportirg all in position Y8 @ 200 as
dircrfnd hv llnqinaor n. oifo
aSc'f
2.8 Supply all materials and cast a l50mm lhick vibrated reinforced foundation CUM 13.?0
coocrete strip (coucrete class 20 - i:2r4)) r<.sq3+ AE 5o
,a Supply and build, 200mm thick stone foundation walling in cement and sand s8M 1.i8.92
mortar (l:3). Reinforce with and including 20swg x 25mm wide hoop ilon in
every alternative course; height 1.2m.
3. [o.l Aah,Yfi {
2.8 Supply and frx 12mm high tensile square twisted bare; eold wotkedi B5446I I(GS 146.00
including bends, hooks, tying rvire, distance blocks and spacers for foundation
eolumn reidorcemetrt, 4Y12 as dirested by Eagineer and irdicated on the rso+ gg,s"- |
skuctural drawing
ta Supply and fix 8mm bars, Y8 @ 150mm e/c cost to inelude bendr, hooks, tying I{GS 84.00
wire and fixing on the foundation column as nngs as directed by Engineer as
PLtoo{
indicated on the shructural drawing
"sa+
2.10', Supply aod fix formwork to eide offoundation column, cost to include cutting SQIVI
fixing and removal after casting the fouudation colu-mn as dir"ected by Engineer
on site
16.40
qe'+ l3,lro+
2. 11 Supply all naterials and caet column foundation 200mm by 200mm and CUM 1.70
l500mm height cost to include formwork and vibt'atirrg concrete mix 1:2:4 or
class 20/20 as directed on site by Engineer
.25,5*l 6opso*
,1' Supply and fix 12mm high tensile square twisted barei cold wotked; 8S4461 KG 277.77
including bends, hooks, tyiag wire, digtance blocks anal spacets fot g::ound
beam reinfotremett, 4Y12 as indicated on the structtu.al drawings on approval
49"+ 51,++>'-sa
hy Engineer
t,13 8mm bars, Y8 @ 200ram c/c cost to include bends, hooke, tying wire and fixing KC r54.45
on the gtountl beams as rirg,s as iudicated on tbe Structural ilrawing as.c,+ 3a, LiA'-v +
2.L4 $upply aJI materials and cast 200mm by 200mm ground beam cost to include OUM 3.13
vibrating concrete mixl:z:4 or class 20/20 as directed on site by Engineer ti.s@l 6 t,oE *
tr'loor Slab

s.15 hanil a }B0mrn thick to tLe floor ares *nd compact CUM
directed on sibe by Engineer
56,?0
3,o-e # lJo,lqc +

Company signlstarnp Page 1 of 5 Sar;f AP accomodation units


2.16 Supply and lay 50mm thick muuam blinding on top of the well cornpacted
hardcore
2.17 Supply and 1ay 1000 gauge polythene DPM (with l50mm laps) over the
SQM

SQilI
17S.14

200.00
3*+ Ea,rfa t
mru'ram blinding G.L 3 6,ooo 4
2. 18 Apply approved anti"termite and herbicide treatment chemicals (Termidor or
Gladiator) rvith a ten year guflrantee to top ofhardcore beds aud ovet
forrndatinn wells
SQNI 200.00

z*f 6o,*o{
2.r0 Supply and fix formwork ho side of slab, cost to include cutting fi-ting and
removal afler easting the slab as directed by Engineer on site
L.M 84.00

17S. r4
l{.+ 13. Hlt:l
2.20'. Suppiy aod fi.x mesh fabric reinfotcement no. AI42 size 2$0 x 200mm weighing SQM
2.22 kg per square metre in flool elab ( measured net- no allowance made for
Iapsi including bends tying wire and distant blocks.
Beo+ 1[3.s1 >f
D
'1
Supply all materials and cast a l50mm thick vibrated reinforced concrete slab. SQM
mixl:2:4 or class 20/20 as directed by Engineer on site
45.?9
?3ts+ t3313s"-t +
Sub'totel 2: Substructure
?.ott+ 1q-5-'l
3 ELEMENT S. WAI,LING
I

Supply and build, 200mm thirk stone walling, in 1:3 cement sand mortar.
3.1
Provide 25mm wide x 20swg Hoop ir.on at every altelnate course as dilected on
SQM 402.5?
3,@l l,ur,?,asr{ L
t

site hv trhsinee"
co Supply and lay, l50mm wide bituminous based Damp Proof Couree, 85743 L.M 149.r0
p"c F A1,Ato {
3,3 Supply end fix lZmm high tensile square twisbed barsi cold workedi 854461 I{GS 280.00
including bends, hooks, tying wire, distanee blocks and spacers for
suparstructure column reinforcemen! 4YI2 as directed by Engineer and
tsof 7o,Eo +
indicated on the structural drawine
Supply and &x 8mm bars, Y8 @ 150mm c./c cost to include bends, hooks, tying
oef
3.4 I{GS lrt8.00
wire and fixing on the superstructure column ss r.ings as directed by Engineer
3r L
5.J
as indicated on the sf,ruetural drawing

Supply and fi",r formwork to side of superstructure column, cost to include SQIVI 29.52
"".+
cutbing fiting and lemoval after casting the foundation columr as dilected by
Engineer on site
E*"+ ?3,4 tA + I

3,6 Supply all materials and cast column ?00mm by 900mm and 3000um height CUM 3.38
cost to include vibratiag concrete mixll2:4 or class 20/20 as di:ected on site by t-t,-q* + 6s,<rc{ i
Engineer I

3.? Supply anil fix 12mm high tensile square twisted balsi cold'workedi 8S4461 1(G 531.02
including bends, hooks, tying wire, d.istance blocks, and spacers for lintel beam
reinforcement, 4Y12 as indicated on the struciural ilrawings on approval by
D50+ I3 ), I
1 -5-r {
Engineer

{ -l3,l€a+
J.O 8mm bars, Y8 @ 200mm c/e cost to include bends, hooks, tying wire, and fixing KG ?95.12
on the lintel beams as rings as indicated on the Structural drawing D-sc
8.9 Sawn formrvork ta sides and sof8t of ii.ntel beam SQM 81.06
?ra .L L
€.,U- eUiK
3.10', Supply all materials and cast 200mm by 250mm lintel beam cost to include CUM ?.{6
yibrating concrete mixl:z:4 or elass 20/20 as directed on site by Engineer
tfso' I t+S, tlT. {
3.11 Provide and [r in wai]s ventilation constituting of 100mm tliameter PVC pipesi No-
cut in lengths of250mm average, above all windows and doors. And eovered
wifh r nipra af eaffap frrv uira
24"00
tt*l q,6* I I
L
Sub-tutal g: fg'alling ?"loa. oSl"
4 ELEMENT 4, ROOF SI"AB
I
4_t Supply aud fix
12mm high tensile square twisted barsi cold-worked; BS44S1
ineludirg bendo, hooks, tying wire, distance blocks, and spacers for
superstructure columo reinforcement, Y12 spaced at 900um clc as directed by
I{GS 1,300"00
e sof 3 zs,hro +
i_

Engineer and indicated on the structural drawing


4.2 Supply and fi.r 10mm high tensile squa:e twisted barsi eold-wolkedi BS446f KGS 800.00 (_
inclurliag bends, hooka, tying wire, distance blocks, and spacers for ?eo, eo. {
4-g
guperstructure eolumn reinforcemeut, Y10 spaced at 200mm c/c as directed by
F*i*^-- --i i-l;--+^,1 ^- +L^ *]-".-r..-^r i*^"-.:--
Supp{y and fix formwork to soffits and side of roof slab and overhang of 300mm SQM
"sof
214.88
all round the roof slab, cost to include cutting fxing and removal after easting
the foundation eolumn as directed by Engineer on eite
€&t+ l-11,3ott-4 L-

Supply aad fix support formwork to formwork for elab sof6U, coet to include cutting,
\ bal
4.4 LN{ 22410
fixing, auil removal after casting the roof slab as directed by Engineer on site Z-SA ,+'t*+
4.fi Supply materials and l50mm thick cast roof slab and over.haug cost to
concrete mixl:2:4 or class 20120 as directed on site by
CUM 30.15
Lqe*l ffi7, Kss{ l
I

Company sign/slamp Page 2 ot 5 S6rif AP accomodBtion unils


a-.

4.6 Supply and build a, 200mm thich parapet stone walling to height 400mm high, SQM
in 1:3 cement sand mortar. Provide 25mm wide x 20swg lloop iron at every
31.28
3,&r* + tta,6,*gf
alternate course as direeted on site by Engineer
4.7 Supply and lay, t50mm wide bituminous based Damp Proof Course, BS?43 L,}I ?8,20 qs, I LE 64.+
Sub'total 4: EoofSlsb
I "'1 1l i:€7 ,
b ELEMENT 5. DOOBS
5_r Supply and fl1 prime grade rnahogtny pauel doors overall size 900mm
2000mq high, completa with 50mm x 150mm wrut mahogany door framing
t NO- 8.00
6",n* [ [6o, mrf
and fanlieht
fi.2 Supply and fix for all tloors, 25mm quadrant beading. LM 45.00
t+ -so# ao zsc+ L-
5.3 Supply antl &,r for all tioors, 40mm x 25mm ar.chitraves L.l,I 45.00
-r*l 3t sta:I
Prepare and apply under eoat and two coats gloss painti Pr:emium Grade SQM 23"00
55ol
I
it.+
Brand to general surfaces of himber lr,b^o+ I

L-
D.D 100mm brass butt hinges with a set of matching screws Pairs 13"00 al
5Et 6,s-.{
5.6 3"l,ever mortice as "UNION' complete with lever handles N0. 8.00
trSooL li+ o.t ., { I

D. I 30mm diameter rubher door Etops raw bolted to concrete NO. 8.00
+E-+ A q-a.,I L
I

Sub'tota1 5: Doorg
Lct.2,- JF
6 ELEMENT6. WINDOlryS
Supply and fi.x louvertype wicdow with 150mm x 50 mm prime gt'ade cedar' NO- 16.00
b- -L

timber haming shuttere. Window size: 1500mm wide x 1200mm high complete
with the appropriate approved louver biadee
lfs,b=o I Tflo,ft.r+
-1%l
I

6.2 45mm x 20mm ramovable cypress hamee Oeadind to mosquito gauze wire L.nI 170.00
L
I

panels flred with brasa wood screws at 300mm centres tr9,u.ro $


6.$ Supply and fi.x for al1 wiudows internally, 40mm x 25p.m lsstrihqves

Iluvre 4mu for window size lZ00mm wide x 1500mm


L,M

SQM
170"00

48,00
r*4 tt1.*..4 1

6,4 glass 150mm wide x


high (Meaeured Nett.) ?.5e*l l?6,on,,cl|
I

6.5 Drii-l hotre through 50mm thick tiilber fi'ames

Provide Rllmn mild steel security horizontal bars, cut and fitted in timber
PCS,

hU
4?4.00

194.00
FI ?g zoo4 I

6.6
a.5.f L
I

window fi'amee (hoiee and framee measured sepatately) [i*a,.g-.f


6.7 Coffee iray uesh fixed to faees of window frames
(measured separately)
with timber cover frames SQM 48.00
tu"1 ** f
6.8 Mosquito screens (piastie) fircd ts faces of window ftamet wiih timber cover
frames (Eeaeured sep*rately)
SQM 48.00
s*l =e,
?r+,b*+
(_

6.9 Under coat and two coats gloss oil paint to all wooil surfaces SQM 42.00
ss'of ?3 lb+
6.10'Supply and fix eurtain boxes 1.?m long complete with 150 x Zffmm wide fascia, ?cs- 2{.00
2no. 150 x 25mu eads 100mm long; 100 x 25mm blockboard topi and 50 x
25mm wrot cypress beareri piugged (104 no.)
6.s,@ | l-sb,o+
G.11 I sec*iou eurtaitr railing rrith asd including 160-- laps, runners at 100mm L,M 52.00
cEters, sfio$pefs 55tu+ ?'64, b,=+
Sub-total 6: lYindowe
LL1 - -?rm:
7 ELEMENT 7. INTEBNAL rINISEES
Floor fisighes t_
26mm thisk Cement Saatl (1:3] screed p,remixed wifi red oxiile powder or other SQM
7.1
appmvedpigment
179.14
15.+ 1"3+,3-55+
l4lall finishas L
n9 lEmm thick two eoat cement eand (1:3) plaster troweled gmooth and
comprieing lZmm backing and 3mm fi-uishing coat.
SQM 461.30 "Isof 3+s,q rs+
Prepare and apply thaee coats ofglose oil painti'Premium Orade brand'to wall SQM
surfaces
461.30
5s.l cs3.rlsl
7.4 15ram thick two coat cement sanal (1:3) plaater troweled smooth and
comprising l2mm backing and 3mm finishing coat for l00mm high and 50mm
ilaia'lr 6lri$|inr
SQfoI 8.98
-rsof €,1*+
7.5 Prepare and apply under coat anil two coat€ of gloss paint
100mm
SofEt Bl&b fpjsheg
$ey to wall skirting; SQM 8.98
5.=o I 4,4*<q+
7.6 15mm thick two coat cemetrt sand (l:3) plaater trrweled smooth and
anmn"ioino I9mm hcnlrina aail 1-* S-icl'i-c nnr.}
SQM r?9.14
lsof 13F.555+

Company lignlsilEmp Paga 3 of 5 Sarif AP accomodation units


Prepare and apply three coats ofwhite glose oil painti'Premium Grade brand'
tn -cnfffts sleh .curfsce
SQM 1?9.14
55o I 13,g21 I
15mn tlick two coat cement sand (1:3) plaster trcrveled smooth anil SQM 62.56

f
?.8
comprising 13rnm backing and Su-o. ffrishing eoat at ttre parapet internal
-15o q 6.qa.+
walling as directed by Eagineer on site
?o Prepare and apply thvee coats of white gloss oil painti 'Premium Grade brand'
t^ nrflr*t intsmel wnllina
SQM 82"56
5:ao{ 34. 4oi {
7.10' 25mm thick Cement Sanil (1:S) screed premixed with water proof cement or
olhpr gnnroved nigment frrr ton of the roof slab
SQM 1?9-14
qs,, I lGl,>>6:
ElectEiral Firishee

?.11 Install a 6kW domestic Solar power system and provide a prime cost sum for item r.00
electrical accessories, fittings, and installations for Solar lighting and charghg.
Allow for all electrica) Iighting points complete with wiring and conduits,
too,orul €t$,,3*+
switches, and all builders to wotk in connectioD thererpith (electrieal wiring
should not he vieible and cable from power source shouid be laid 0-4m below I I
Supply and install apptoved Distribution Board as MEM OR equivalent No [.00 PSsro t ?9 cno #
(i) Supply aailflx 13,{ siagle sockets outlets PCS. 1S"00
6*F l6 t+c"i F
ft) Supply and &.r 15 A twin sockets outlet€ PCS. 16.00
tco {- lri UEE I

(iii Supply and fix 2-feet complete fluorescent per room PCS 16.00 I
5 u:rr *- to.qc"e, I
(iv) Supply and fi.x switches (1-gang 1 way switch) PC$. 16.00
G.wl 1r] usnt
(v) Supply and flt ewitches (t'gang 2 way switch) PCS. 8.00
-ls+ 6 u-..{
(vil Supply and fix energy saver bulbs on ceiling ofvelanda complete with PCS. 8.00
?-9oL ?, ous
5, oosr a as.b@ I
(vii) supply anal fix external (security) lights rvith intern*I cabling included two PCS, 4.00 I
i
infront and two at rear
t_
(viiil Supply and fix complete ceiling fans PCS. 8.00
t
(t{) OPTIONALI One consumer unit for the block. AII electrical wiring should Item r.00 "a.ucrc+
lS, oryo L tg. B'sa Jr
be from the consumer unit I
(x) Electricai earthilg comprising 6mn:' single core copper cables dlawn insiale L,M
HG conduits. 20mm copper electrode complete with clamp
50.00
?t*f l) s. oua +
kil Standard cable loop-in box made in gauge L4 SWG galvanised steel sheet

(xiil Cut'out coroplete witb Sp 80 A HBC firses


PCS,

PCS.
1.00

2.00
4,w"
l. sB3+
I +, u"*F
9t!\
Sub'total ?: Iuternal finiehet
?, +16,3ss. I

I ELEMEI.IT 8. IVATEB AND SANITATION 1


I

L-
WORKTNP
8"1 Allow for maki:rg I coucrete work top of size 1800mm-x700mm complete with
concrete supports, well plasterred 6rfl finis[gd plspsvb'
item I
t?o,rc{ r ao,eoc I
IffTCHEN SINK L-

8.2 Supply and {Lx Approved standard complete 8 single bowlr stainless ateel
kitchen siilks ylith a mini.mum of 0.2mm galvanization with cobra pillar tap,
and any other necessary Sxture to rnake operational Complete with chrome
item 1

rc,"e= I qo.*o I I
L
plated. The work jncludes the supply ofmaterials, including floor drain, labor,
and any other necessary. the cost should include the cotrnectiotr of the sink to
the main wateu supply. (
KITCHEN CABINETS L*
Supply and instsU lG kitchen cabinets PVC laminated aud good quality, highly SQM 14.4
8.3
polisheil granite countertop of 20mm thick. Work includes supply and ?0,"* | ?8.{1, tn:-+
installation aecording to the drawing.
DRAIN F'II,I^S
8.4 Excavate 4 drqin fiIls each measuing l5rn long x 0.6m wide and 1.5m deep in a
normal soil
CIJM 34
6*-l 31, titsz' ,
L_

Place 4no. PVC 4"(r00mm) dia., 6m long, perforated rvaste drainage pipe {Golden
brown) high grade (one in each Eraid including Tangit & othor materials.
No. 4
tq t*t tl3 zu.l .
L
'l<3tt
Supply and plam had frll the trench for the drain fiII CT]M s4
8-5 core to
3osrc IAt. o,:ru ,
8-6 Supply and place 1000 gauge pol;thene sheet to cover the drain 6l! hardcore SQM 4E

8"? Allow for covering the drainiil with exc.ated aoil LIJI,IPSTIM I
5u:oT
MANHOLES 0

I
l

Company siJrlstamp Page 4 ol 5 Saril AP accomodation unitg


8.8 Conatruct ,lNo, Llanholee with walling measwing E00mm wide x 800n:m long x No 4
450mm depth, using nachirre cut stoile wall o{ !00mm thick enbedded ifl cement fto.ueo+ 32c,oss I
mortar of 1:4 mix. with 600 x 450 x 6nrm healy gaug€ steel primed metal menhole
cover- AIIow 15m* ttrisk two'coat ceilent sand {1:3) plaster trorvelled smooth and
nomnrisins I2mm backinp and Smm finishins coat" I
Sul'tot*l 8: Water and Sanitation I taafal ?U.{)+
I EI,EMETM S. EXTEBNAL I'INISHES
$.1 l5mm thick cement sand plaster rendered to beams,columne, doors and all
entrances, around wiqdows, buildi:rg corners and gables
SQM 100.80
rsof -l5,oe+
Under coat and two coats gloss premium g'ade paint to general concrete areas SQM
9.2
(inciudins rendered plinths)
100.00
5s-+ Sa. aca I
Eaking and keying to all masonry walling ae direct€d by Sngineer on site sQrvr 215.00
I
I
$.3
6"* | 1,2a,oo-e t--
Sub.total 9: Exteraal finishee
?55 rrso:
10 DLEMENT 10. OTHEH, COSTS
'L
10.1 PROYISION OF WATER

Tankering ofwater for all gonstruction workg


i

10-g AII coneete works to be cuted 3 timee a day for 21 consecutive days general
euring for plasters andjoints to go for 14 consecutive ilays.
Days 21.00
s.e*o I to=S,ot.s # L--

Sub-total 8: Other costg


l.oS CIB.r+ I
I

1 8IN{MARY )
1_
2 Excavatioa and Earlhrorke .?6u.rco_ qc
I
Subetructures '13
3
?et*$1.q 1. I

4 Watiag ?.lo r agt : L


b Roof Slab
Itrr r:+-T
6 Doora
Aor .3e'o t I
I

Winilowa
I Alt -Teo -
I Iaterual finiahes (hcludsa 6kW Solar rloaestic power)
1.vai6 lz'c_S {
I
I Water aud Saaitation
I o5=i, ?qa l

I Dxternal firishee
?Sq e.-r- I
10 Other costg to.6 g*... f \
l
TOTAL COST BOR ONE BTOCK OF 8 NOOMS O$HS)
12,+4+,Hl o+'
L
{

I
{
i
t_

I
l_--

Page 5 of 5 Saif AP accomodation units

l
ANNEX c- AELOCK s
ITEM DESCEIPTION UNIT QrY R,AT$ AMOuNl0ffS)
The coatractor is reminded that all coucrete works Euet be vibrated usitg e
po&er vibratot and all gcheduliag, tlirgasi6ninE, benrling, aud cutting of
et€el reilforcemeut for concrete to be aa per BS 4466. All maaot:y work
coatractor ghould uee grade I Natural Machine cut Etoue
1 ELEMEI{T 1: EXCAVATION AND EARfHWORKS I
1_01 Clear site of all bushes. srass. shrubs and roots. 110.00 q.lh. E--C&:H r

1.0, Excavate over site to remove toD vasetaf,ion soil 200mm I l0-00 O.=e b Q-,1 r\st I
1.03 Excavate starting ftom strippeil level a 600mm wid* foundafion trench to an EUM 32"76
average depth of 1500mm (t.Su) in normal soil io be approved by Engineer on
6*.I \a L^e +
1.04 Baclfrll and ram seiected e-xcavated materials 300mm thick
exceeding 50mm using a plate compactor
il layers not CUM ,'7 '1'
5mf 13 66" +
1.05 Carry away surplus excavated materials to an approved place CUM 6.00 4SaL C-loe +
:.| r'!Fn4:
1.G Allow for keepfurg trenches free from water Item 1"00 5,ctu..L t.-^
Allow for planking and strutting to uphold aiiles ofexcavations and for Item 1.00
.Lrc.tr*L g".'wo L
1.? I

kecnins the -same frao fi.am fallcn matorisls


Sub-total 1: Excavatioq aad Earthworke t_
ELEMENT 2 : SUBSTRUCTUEE

t*t
2
Supply all materials and cast 50mm concrete for blirding concrete ratio 1:4:8 CTIM
1 fo+
2.1 1. L0

nn Supply and fiJl 200mm thick hand packed hardcore (stone); well rulled and
rnmmsd /nntionol fa he dpridei nn *itc)
CUM 6.49
3..* t tq. *-Ils+
2.3 Supply and lay 50mm tbick murram btiuding to top of hardcore under strip
fontine as ditcntcd hw Ensinppr
Supply and frx steel bars in foundabion concrete work including cutting,
SQM

KG
21.85
.33" I e-l-g.Es *
I
c-4 14S.25
bendiug, hoisting, and iying wire and supporting all in position, 3Y12 @ 200 as
rliraararl krr flrcira-*
31,.3f r"5o+ t_
^- -i+^
".e.
2.5 Supply and fix steel bars in foundation concrete rvork iaeluding cutting,
bendhg, hoisting, and tying wile and supporting all in position Y8 @ 200 as
li---+^,I L., F-;-^^- ^- -;1^
I(G ?4.00
a*+ rc"s*f I

2.G

2"r
Supply all materials snd caet a 150mm thick vibrated reinforced foundation
conerete strin {cnncrcte claes 9-O - t:'l:A))
Supply and build, 200mm thick stone founilation walling in cement and sand
CUM

SQM
4.20

54.60
lls*.,{ Af,eq f
al
mortar (1:3). Beinforce with and include 20SWG x 2$mm wide hoop iron in
a'ra*, allarda+i }'^id!,+ 1 !)*
2q& t tAs,6{+ |
flt
=r. I
2.8 Supply and 12nm high tensile square twisted barsi cold workedi BS44GI I(GS 64.88
including bends, hocks, tying wire, distance blocks ard spacers for foundstion Lr",

,o
column rcinforcem€nt. 4Y12 as directed by Engineer and indicated on the
I t-^--.:,-
Suppiy aad fix 8mm bars, Y8 @ l50mm clc cost to inclutle bends, hooks, tying I(GS 39.33
"s.+
wire and fixing on the foundafion column as rings as di'eeted by Engineet as 3ra3z -9*+
2.10'
ih.lia!+-rl nr l}lq cfirrarrrrol n*a*'iac
Supply and fix fotpwor* to side of foundation column, cost to inelude cutting
flxing and removal after casting the foundation column as direeted by
SQIVI 7.30 "s-f
e-+ 5,.a,r<o+
II-*i--.* -- .,it-
s.u Supply ali materials and cast column foundation 200mm by l00mm and CUM 0.97
150Smm height cost to include formwork and yibratilg eoncrete mix 1:2:4 or 35 s.rr+ 3+, rse+
^l--- 9ftlon --,li- ^$^i ^i ^:r^ L,, D-#-AA*
2.L2 Supply auil fix 12mra hich tensile square bwisted barsi cold worked; 8S4461 KG 66.96
including bends, hooks, tying rvire, distance bloeks and spacers for ground es"+ tA,r.lo+
beam reinforcemert, 4Yl2 as indicat€d on the structural dmwings on
^--*-.^l L-, F*;-^^-
200mu c/c eost to include bends, hooks, tying wire and fixing I{G
2"13 8um bars, YB @
on the ground beams a$ dngr *s indicated on ttre Structural dlawing
37.30
atof 1,32s+
2^14 $upply all materials and cast 200mm by 200mm ground beam cost to include CUM 1"89
vibrating coucrete mixl:2:4 or elass 20/20 as directed on site by Engineer Lg 5*+ 3&8ss+
Floot Sleb
Lrl Supply 300mm thiek hardcore and hand pack to the floor area and compact CUM 9.83
3,,r*rf aq, ffigd
1.12 Supply and lay 50mm thick mulram blinding s8M 26.d0
tu+ "lgza +
1.13 Supply1000 gauge polythene DPM (with 150mm laps) and lay over the
firrrrh hlindina
SQM 53.00
lto I 1.s.rc{
1.14 Apply approved anti'termite and herbicide treatment chemieals (Termitlor or SQM 63.00
Glatliator) with a ten year gua]antee to top ofhardcore beds and over
fa"-rlo*inn '.'olIo
su*'f 15,7". +
1.16 Supply and fix fotmwork to side ofslab L.M 44.00
t6,.+ -T o +s,t
1.16 Supply and fi.t mesh fabric reinforcenent no- A.142 size 200 x 200mm
weighing 2.22 hg per square metre in floor sliab (meaeured net. rro allowance
made for lapsi iueluding bends tying wire and distant blocks.
SQM 53.00
a*f +a, +e-t
.!
Cornpany sigrlstarnp 10f 3 SaritAP 3 offlces
1.18 Supply all materials and ca$t a 100dm thick vibrated reinforced concrete slab,
mixl:214 or class 20120
CUM ?.9S
a:rc{ ?.3,A53:ts
$ub'totrl 1: Subetructu!€
6 tS I S3 "1-S
2 ELEMENT NO. 3 WALLING
s,01 Supply and build, 200mm thick stone wailiag, in l:3 cement sand rnortar. sQhr 99
Ptovide 25mm wide x 20ewg Hoop iron at every alternate cour€e including
^^1.'*- ^ilI;* 66 -L^"'- ;- +L^ 1,.^-,:--
?6*+ .J-:) 4r
6 q"eta {
aQa I 4,6e. d
2.02 Supply and lay, 150mm wide bituminous based Damp Proof Course, 85743 L,M 43

,. nR lSmm thick render to olinth on stone oI concrete ivorki heisht 0.5m soM 2I_5 -1(o# l6, t LS+ I

2.44 Supply all oaterials and cast R.C. ring beam and columns, vibrated rei:rforced CUM 5.256 L
concrete class 20 aud aay other necesaary work as may be ilirected by the site
engineer.
It',s". { 'loq r+aad
Supply aud fix High yie1d. deformed steel bar reixforcemetrt to B.S. 4461 to KG
?s-. I tq1 totr t
2.05 788,4
finohasn o-.t n-l-*-"
flx Sawn formrvork to sides
2.06 Supply and and soffit of beam SQM 3?.68
t{.'o+ 3$ r+++'
'1.A7 Provide 200mm cem.ent sand vents and fix in walls ventilatioai cut in leilgths No. I
of 250mrn ayerage, above all windows and doors. And covered with a piece of
rn$faa +-c', -'l*a
Ue" + 3, 6^.* +
Sub-total 8: Waliug -Tr it h't L
3 ELEMENT NO. 4 ts,OOFING
Suapeadeil Boof Slab

3.01 Supply and 6x 19mm high tensile square twisted barsi cold'worked;8S4461 KGS 744
including berde, hooks, tying ffife, distance blocks, and apacers for
superstructute column reinfolcement, Yl2 spaced at 200mm clc as directed by
a.sof tl6,w- Jp
Engineer and iadicated on the etructural drawing
s.02 Supply ard fui 10mm high tensile square twisted barsi cold-workedi 8S4461 I(GS 49G
fucluding berds, hooks, tying wire, distance blocks, and spacers for
l?q us"f
superstructure column reinforrement, Y10 spaced at 200mm clc as di'ected by
Engineel'and indicated on the strrrct-rn'nl dr'awinp """+ I
I
I
3_03 Supply all materiais atrd cast R.C. siab, 150mm thick, vibrated reinforeed
concrcte clasq 2ol2tl
CUM 9.3
Lq.soq; t%l.3so I
3.04 Supply anil flt Sawu formwork to sofEts of slab s8M
L}I
92
am+ 1\1'r,o# I

I
3.05 Supply and fi.r support formwork to formwork for slab sof6t, cost to include r,000.00 I
L
cutting, Exing and removal alter casting the roof slab as iiiected by Engineer
on site
16" I f a",,s="
i
3.06 Provide a 400mm high pa1'apet lr'all 100mm thick etone walling, in 1:3 eemeot SQM 30
sand mortar complete with plaster antl painting 3,60-+ lo.s,eoo+ I
t

Sub'total g: Iloofitrg
*4z.1Ss*
4 ALEMEItr NO. 4DOOES
I

4.01 Supply aud fix, prime grade mahogany panel doors overall size 900mm x NO. 3.00
g","*{ l?c,o.o I
\-*
2000mm high, complete with 50mm x 150mm wrot mahcgany door &arnilg
and fanlight I I
4.82 Supply and flx fot all doors, 25mu quadranf !6xrl;tg. L.M 40.00
Bso$ t6. eeo *
4.03
4.04
Supply and fix for all doots, 40mu x 25um architraves
Prepare and apply under coat and two coats gloss painti Premium Grade
L.M 40.00 -f-s'o t 4wot
SQI}I 20.00
Brand to general eurfaces oftimber 5.5o+ ll
4.05 100mm brass butt hinges with a set of matching screws Pairs 11.00 "=-4I
"qs, + S.gw
4.06 S'Lever mortice locks as "UNIOM complete rvith lever handles NO. 3.00
5S"* t L6..so. *
4.0? B0mm diameter rubber door stops ras, bolted to corcrete NO. ts.00
%w+
b ELEMENT NO. 6 WINDOWS
Sub'total 4: Doot€
".+a=F"
AA t.U.e'o +
5_01 Supply and fix windorv with l50mq x 50 mm prime grade cedar timber NO_ 6
framing shutters. Window size: 1500mm wide x 1500mm 56t2sr,l+ 231,&r.+
5.02

5-03
45DnE x 20mm removable cypress frames (beailin$ to heavy gauge weld mesh
fixed with brass wood screws at 300E0o centres
Supply and fix for all windows internally, 40mm x 25mm architraves
L.M

L.M
57

57
r*l 31,a@+
7r:oI 3n I za=-
5-04 Under coat and two coet€ gloss oil paint to all wood eurfaces SQM 7 ScnL fl.so+
5.05 Supply and fix heavy gauge weld uesh SQM 19.5
tove.L =,
r-4.-sen*
Sub'total 6: lYindowa
43q- aso*

Compsny signlsl5mp 2of3 Saril AP 3 offices


6 ELNI/MNT NO. 6 INTEBNAI, T'INISHES
Floor fiaishea
6.01 Supply anit fi-x85mn thick Cenent $and (1:$) screed preuixeil with red oxide
powder or other approved pigment
SQM 110
*rof ta,o== +
WalIfinishee
6.02 Supply and fixl5mg thick two coat cement sand (1:3) plaster troweled snooth SQNI 120
and comprising 12mm backing and 8mm finishing coat including provision of
Ll--I. L^-.,"1 L--L-i-- *1-^+^*
1uo+ 1o iBc)
+
Prepare anil apply three coats of gloss oil paint; 'Premium Grade btand' to i20
6"03
wall srrrfaces
SQM
4sa+ 64" e"r='
I
L

6.04 Supply and fix 15mm thick two coat cement sard (1:3) piaster trowelled SQM 14
-1-5c
smooih and comprising J.2nm lacking ard 8mm finishing coat for l00mm
hieh and 50mm thick skirtine
+ to-g"s,) *
6.05 Plepare and apply unde:: coat aud two coats ofgloss paint grey bo wall SQM I
skirtirgi 100mm
1,1
55o+ [, "Isra # . i_
Sub-total 6: 1o1rta6l finirhee f13 lsr.='t
I ELEMENT NO. 7 EXTERNAT FINISFIES
7.0r Allow for concreting works and masonry to create ramp size lm wide and 2m
lanq rpinfnrcpd aon.rptp lnmn ai qll pnfr.rn.Eq
SUM 6
t+s*I ? 7.trss
7,02 Supply and fix 15mm thick cement sand plaster rendered to beams, doors and
al'l pntrannpc qrnrrnr{ rwindawc hrrilrlino nnrnare lnrl sahlpl
SQM 23
lq^lt I T 2-So=
7.08 Under coat and two coats Bloss Fremium grade paint to general concrete areas SQM 23
linplrrdinc ra;rlaml* nlin i}o) -5s.+ 12 65o.
7.04 Raking and keying to all masonry walling SQM t08
e-L {-v.6w'-
Sub'total ?: Extornel ftddhes t2l '7uE :
I ELEMEI\I1I No. I ' SOLAR POWEE & ETECTBICAL INSTALLATION

8,01 Install a 6k\U domestic Solar power system aud provide a prime cost sunr for Item 1
electrical accessories, fftti-ngs, and installations for Solar lighting and
charging. Allorv for all electrical lighling points complete with rviring and
conduits, switches, and all builders to work in connection therewith (elech'ical stc &:o,esof
winng should not be visible and cable &'om power source should be laid 0.4m
Sub-total 8: Electrical iaetaliation
I
I ELEMEI{I No.9 OTIIER COSTS t_
9,01 Tankering of water for all eonstruction workg, all conctete works to be cured 3 Days 2r
times a d*y for 21 consecutive days general curing for plasters and joints to go
Soao I [os,oo!
+
for 14 cousecutive days.
I

Sub'tot&l 9: Other eosts

SUMMAEY
1 Excavatioa and Earthworks
lcL l ec j

2 Subatructurss
6 rS i C8 "'7-\: l
I
L-
3 lValliag -11q, l}alL
4 Roofing
*22 ci<o{ i
l
5 Doors
e^dl ttaa + I
I

6 Winilows ItBu, 6sc\l


Interua.l fi.aishes
I
?
I Extarnal fiaishee ,)
o Soler & Electrical Installation
?r.e s"x-,-t
Other coetg
lo5 esry,ct *
I officoe 'KES
Total coet for
h .3 atr-" 6 3r

(-

i
L

Compaoy sigrustamp 3 of 3 Sarif AP 3 ofilces

t
ANN IO,OOOL PI,ASMC WATER TANK INSTAIJ"AiTION AT SAAIF POTTCE
WAJIR SOUTH
ITEM ITEM DESCBIPTION QTY UNITS UNIT COST AMOTTNT IN KES
(r{Es)
A ET,EMENTA
I Clear site of all bushes,grass,sclubs and roots 7 M9
s.f 3r. I
t Excavate over site to remove top vegetation soil 200mm 7 M,
a*l- t,**d
3 tr'illing and cartins awav
Excavate starting tr'om stripped level a 1200mm X I Mt
4
1200mn wide pad foundation pit to an average depth of 6** s.rto"{
1500mm i"n normal soil-
.)
5 Backfill selected excavated materials to an approved
n'lana
M3
s=. L u,"sf
t,
6 Carry away surplus excavated materials to an approved
nl qnc
7 M3
z s.+ 5.'iso+
7 BackfiII selected hardcore ram (max 200mm) 2 M3 i1 I
: EISA ? 6** I
I Allow for keeping trenches free from water 1 ITEM
3.q:- I 3,*o I
I Hfow for plankiag and struttrng to upholcl sldes oI
excavations and. for keeping the same free from fallen
materials
I ITEM
3,"* | 3.*t
10
hardcore under pad footine
ing to toP of 6 M?
.3* [ G;+
11 Supply and fix pad foundation formvrork 10 M, ?rg-r + 6. crs. t I

I
I

1' Supply and fix steel bars in 4no. Pad Foundations 66 KGS
concrete work including cutting.bending, hoisting, and
tying wire and supporting all in position TVIL@ 2AA
aso+ 16, s* +
r.^rL..,-,,^
13 Supply and fix steel bars in column concrete work 45 KGS
including cutting, bending, hoisting and tying wile and ll,ns*f
suppoding aII in position 6Y12 for each column(4No)
"-soI L
14 Supply and fix steel bars in column conctete wor.'ks
including cuttiug, bendinE;, hoisting, and tying wire and
28 KGS
p5a + -fr-*l i

supporting all ir position R8 links at 200c/c for each


I

t_
-^r,,** {r\I^\
Supply all materials and cast 4No- 2 M3
15
1200mmX1200X300mm thick vibrated reinforced 3o,'.3o + €o,'wo{
concrete pad foundations (concrete class 25/90)Concrete
1\{ix ratio 1 : 1. 5 ;3 for cement :sand:Ballast.Steel
reinforceraent as described including cutting t'o leugth,
bending and fixing including all necessary tying wires
and spaeing blocks (all provisional)
l6 Supply all materials and cast
4Nos.400mmx400x 1900mm hi gh vibrated reinforced
1 M3
3o,eu,o t 3o,u=of
concrete columns (conerete class 25/20) mix ratio as

17 Allow for curing of all concrete works 1 ITEM lo, gr:e-! lo, es.r-f
Suh'total : Element A

B ELEMENT B
For the steel superstructure,The contractor is rerninded
t--
to include in his pricing, the cost of supply, cutting,
erecting, welding, waste and any other necessary
welding and fabrication such as gusset plates, cleats,
boring holes, bolts and fixing tight. Steel to be treated as
dp-qnriherl in f.hc cnceifinafions

Company Sign/Stamp 1oB Sarif AP elevated plastic tank


.T

tz tM
1 Supply and f:x, 100mm x 100mm x 3mm(9.l+kg/rx)
Square Hollowed section (SgS) for the Columns each
3m and welded to mild steel plates at both ends.Cost to
5a.u I 6q,4*=+
include priming metal surface with one coat of red oxide
Dllmer

2 S"pety and fix, 100mm x L00mm x 4mm (p.fe tetrn)


square ltrollowed Section (SHS) for the MAIN Bean.
Cost to iuclude priming meta-l surface with one coat or
c LM
5tt*,f pl, *.f
L
Supply and fix, 75mnc x 75mm x 4mm (+.sskelm) 27 LM

tl
3
Square EIolIow Section (SHS) for secondary beams,
spaced @ 300mm c/e.Cost to include prirning metal
,.,.i+L ^*^ -^^t
aoe ss.aY-1 |
^,.*f^^^ ^f -^,1 ^-,iJ^ --.i*a-
+ Supply and fix, 50mmx50mmx4mm equal angle seclions 28 LM
for the bracings. Cost to include priming metal surfaee ?,.,o 1C-{ 5 6,g96+
,,,:|]^ ^n^ ^^-| ^+ -^.{ n-i.t^ --iaar
5 Supply and fix a 300mmx300mmx4-5mm plate, 1 ld I

t_
including, fabrication and welding to the
100mmx LOOmmx3mm column sections includin g drillin g
lS,'fu. I I S, 1,5- +
bolt holes. Cost to include priming meLal surface with I

Supply and fix 300mm long HSL M32 high [ensile steel 24 PCS
6
Anchor rag bolts with hexagonal nuts and washers a-50 + ao,tluof I

,I
Supply and fix 2500mmx2500mmx3mm steel plain sheet I M2 g=o { L
lt,5oo + Be,
LM
8 Supply and fix ?5mmx?5mmx4mm(4.o8kg/m) Square
Hollow Section(SHS) for the vefiical lailder main &ame,
600mm apalt, fixed to a concrete hauch at the bottom
10
qo6l I ?o,.6tt: +
i
t
i
L

and welded to the top beam,Cost to include priming


metal surface with one coat of red oxide primer l
t_
o Supply and fix 16mm bals, R16 @ 300mm c/c ladder -1s(}+
rungs, including and welding to the vertical ladder main
35 KGS
Ps* | I
frames. Cost to include priming metal surface with one
I

I
I

coat of red oxide primet and two of aluminuim paint L-

10 Supply and fix 125mm long HSL M39 high tensile steel
hora son al holf s nrr ts q nrl wq eherr
36 PCS s*f 18, e='= {'f I
I

Supp1y and install2Smm Dia. Mild steel Round bats or LM I

11
flr, o o"l.l il
24
4sof lo,+-,.rt,
Supply and install Z6mmx25mmx$mm augle lines(l.2m LM
L2
lons) fa" guardrail
15
Sorr L -1, s6o I I
l

13 Supply and instal.l U bolts for handrails and braciags 28 PCS


.-g.re I It o-of
t4 Prepare aud apply two coats of oil gloss alumi-aum
nqinf(Premirrm fl*o.lo) fn all efael errrfaao
1 ITEM
15, ooo* tge,-={ l

Suh-total : Element B
c EI,EMENT C
The contraetor is renrinded to include in his pricing, the l
cost ofsupply, cutting, waste tlreading.
bendiug,esectiug,trenching and any other necessary
works including hoisbing 0f 5mB plastic water storag€
tank to position and carrying out all necceary pLumbing
I Supplv and l*stall 10,000L ROTOHeavy Duty plastic
watet tanlr
1 PCS
t6o,gg= | t6^, g*. I
2 AJlow for keeping iniet and outlet GJ pipes straight 1 ITEM
t.9 eEo I 19, b6B +
3 3/4' GI Pipe CLASS B for Elevated water tank i-ulet antl 3 PCS
outlet, Contractor to factor cost ofcutting anel threading 5, r,*JF 15.@+
GI pipes to reguired dimensions.

I
I

L
Company Sign/Stamp 2of3 Sarif AP elevated plastictank
4 1 x 3/4" GI Beducer socket
3/4'PVC Valve socket
1 PCS
6-,* I c"ol
5 i, PCS
5SE
-I t-sce#
1x 3/4" PVC Reducer socket ,
6 PCS
Seo# l"wa4
7 Suppiy and install l" PVC Class E pipeline L20 LM
Pso#
Equal PVC reducer tee 2" x I
E.so L
=O.e,ro.L
8 1" PCS
I oao$
I 1. PVC equal tee 2 PCS 5Go + t s.rot
E:o ts
l
10 1" PVC Valve socket D PCS
te'ao#" l_
11 3/4' GI Elbow 4 PCS
6.sc I ?€*= L
12 3/4" Ball valve Peggler I PCS
[*.*l- [.oo'= L
13 3/4" Backnuts 4 PCS
[r,r., -tr- t t-',eo #
14 314" Socket 1 PCS
t+-<.- t hso l-
15 3/4" Union 2 PCS g"*'* t,sw* L-
16 3/4" Peggler IIK gate valve 2 PCS
r+.soo # {.or:*
Sub-total : Elemeut S

TOTAL T'OE ELEVATED S?EEL 1OMB PI.ASTIC TANKS- KES SJo,"-Io 3+


t_

i
i
I
t_

I
I
L-

l_

L-

Company Sigr/Stamp 3cffi Sarif AP elevated plastic tank

L-
ANNEX C" BOQ I'OB SA.BIT ADMINISTEATION POIJCE ABLUTION BLOCES

ITEM DE$CRTPTION IINIT Qrr RATE AMOUNT (EES)

?he contractor is reainded thet all mnrete worka ruuet be vibrateil usiag
a poler vibrator and all ecteduliag, dim6agiening, f,saJing anal cutting of
steel teirforcenent for concrete to be as per BS 4466
1

Site Clerane
1.1 Clear site ofall bushes, grass, scrubs and roots. SQIvI 24 Eh+ ,'2Sr:
1.2
E:.cavatn over site to reoove lop vegetation soi.l 900mm to designated site as
instructed bv Eneineer
CIJM 4.8
Esa + 96rr '
1.3
Excavate starting &om strippeil level a pit ]attine 1200mm wide by 9600mm
long and depth of 5000mm (s.om) be approved by Enginaer on site
CUIVI 23.48
6-- | ly,aza I
t.4
Excavate starting Som stripped level a 600mm wille foundation trench to an
average depth of 1200mm (1.9m) in normal soil to be approveil hy Dngineer on
sitp
Backfill antl ram selected excavated materials 300rom thick in layers not
CT'M r9.99
c-f I
ll sa+ L
I.D
exeeeding I SOmm
CIJM 15
!,cYC *- 5,:vs
1.S Carry away surplus excavated ro.aterials to an approved pl,ace CUNI 2,t,66 a Src', +
1. I
Supply and filI 200mm thick hand packed hardeore (stone); well rolled and
rnmmed ( ootianol. tn hc ipaiipd nn ,cita\
ClJM 5.656
3ml tGq64+
1.8 Allow for keeping trenches free ftom urater ltem T Eb ar.- L
1.9
A.llow for planking and strutting to uphold sides ofexcavations and for
keeoinE the same free &om fallen matarials.
Item I F-,eoL l'r
_4
( ) I.{-
Sub'tota} L: Excs.vation and Eavthworke
2 ELEMENT 2: SUBSTRUCTLIRE
2.X
,o
Supply and lay 50mm thick muram bLinding to top of hardcore under strip
ftatino re directed hv Flnoirpcr
?1ace StriD footine formwork
SQM
s6tvl
16,9?
I 1.32
5bo t
'2.a< 1-
I
(l^\
.-)
b
Supply and 6x steel bars in foundation co*crete work including cutting,
?.3 beoding, hoistiry, and tying wire and supporting all in position. 3Y12 @ 200
as directed bv Engineer on site :
KG 100
aso f '7 9,*-A +
Supply and fix steel bars in foundation concrete worh including cuttirg,
2.4 bending, hoisting, and tyirg rvire and supporling all in. position Y8 @ 200 as
directed bv Encineer on site
I(G 45
at-+ I l, zso{
tl Suppiy aJl materials and cast a 150om ttrick vibrated reiaforeed foundation
concrete stri,p (concrete class !0)
UUTVI 1.55
t'j,:q* + Vl, lzs {
Supply and build, 200mm thick stone foundation walling ia ceruent and eand
,.8 mortar (1:3). Reinforce with and including 20SWG x 25mm wide hoop iron in
every alternative esursei heieht 1.9m.
SQM 33.S5
3.t1.@)+ ll5,rfs+
Supply and Et l9mm high tensile square twisted barsi colil worked; 8S4461
;rsluding bends, hooks, tying wire, distance blocks and spacers for foundation
column reinforcement, rlYl2 as directed by Eng:ineer and indicated on the
structuial drawing
KCS 45
as. tz5,oL
+ t)

2 sol
Suppiy and Et 8mm bars, Y8 @ 200mm c/c cost to ineluile bende, hooks, tying
2.8 wire and fixing on the foundation column as rings as directed by Eng:ineer as
indicated on the structurai drawing
KGs t0 E 5 ".,f I
Supply all materials and east column {ouadation 200mm by !00mm anil
2.9 1300mm height cost to include formwork and vibrating concetre mixl:Z:4 or
class ?0/!0 as tlirected on site by Encineer
CI.IM 0"29
['1,5cbl 5,6'sg +
Eloor SIab
t1 Supply and hand pack a 300mm thick hardcore to the Soor area and compact
as di:ected on site by Eneineer
Supply and lay 50um thick murram blinding on top of th.e well compacted
CTIM 7
3o-l QI sl>e
2.11
hardcore
Supply and lal 1000 gauge polythene DPM (with 150mm laps) over the
SQM 13.43
S.].+ clB9
o 't.)
murram blinding
Apply approved anti'tef,mite and herbicidle tre-atment chemicals (Termidor or
SQM 19.14
l,&a+ 3,+ 4s." =o'
s.13 Gladiator) with a ten year grarantee to top of hardcore beds and over
forrndai:ion walle
SQM 1S.14
r*Jr 8,1+a I
2.14
Supply arrd fix formwork to soffit ofthe floor EIab, aost to include cutting fixing
and removal after casting the slab as directed by Engineer on site
SQM 3,64 'aoot
t 1E Supply and fix formwork to side of siab, cost to include cutting flxing and
teroval after castine the slab as directed bv Ensineer on site L.M 18.9
t6. L ",1te+
?
Supply and fix mesh &bric reinforleement no. A142 size 200 x g00mm
2.16 weighing 2.22 kg pex square metre in floor slab (measured net- no alloryance
made for lapsi including beods tying wire and dist*nt blocks.
SQM 19.1{
eao { | 5t .3 !a +
,1n Supply all materiale and cast a l50mm
slab. $i*l:2:4 offlass ?0120
thiik vibrated reinforced concrete
SQM 2.871 xsl; + a
9.18 Allow for curing of all concrete and masonry works
Sub-totsl 2: Substructue
Item I t S.rsro I S
rf,-{,.'l' .v -4
3 EI,EMENT NQ.IIIVAUJNG
Supply and build, 200mm thick stone dEB.,E-IB cenlent Canrt mortar.
3.1 Frovide 25mm wide x 2Ostvg Hoop imn at every alternate course a6 direeted
an si*e hv trlngineer
SQM 58.49
3 c"-+ ators6(t

Coflpeny sign/stamp 1of3 SadlAP Ailuton bloc*s


ts.2 Supply and lay, 150mm wide bitumhous based Damp Proof Course. BS7{3 L.M 22.r
eoo I 4,ro.l
Supply and fix 12mm high tensile square twisted barsi colil worked; ES4U6I
s.3 including bends, hooks, tying rvire. distance blocks and spacers for eolumn
reinforsement. ,1YI2 as diraeted hv Ensineer
I(GS D
'.b es€| I 4, +."*+
3.d
Supply and Et 8mm bars, YB @ !00mm c/c cost to inelude bends, hooks, tytug
wire and filing on the eolumn as rings as di:ected by Engineer
KGS 16
asof 4,ooO I
Supply all matorials and caet cotrumn 200mm by t00mm and 2700mm height
3.5 coet to include formwork and vibrating corcetre mixl:z:4 or class 20/!0 as
diracicd on site hv Eneineer
C{JM 0.648
Zs"s.,7
'--I (cr.I
| ?-3, *- ?
€ o.:=s- +
|
3.6 l6mnr thick render to plinth on stone or concrete rvorki height 0.6m SQIVI 6-7

3.7
Supply all materials and cast R.C. ring beam, ?00mm x 300mm, vibrated
reinforced concrete elass 20
ctru 1,88
[-7.sso .. 36.46.L
5upp11, anil flx 19mm hisi tensile'sqriiib hvisted barsi cold worked; 854461
3.8 including bends, hooks, tyilg wire, drstance blocks and spacers for riag beam
rain{a+aamont ilYI9
ITG 110.54
as<l e 1, b3,5 +
8mm bars, Y8 @ 200mm dc cost to include bends, hooks, tying wire and fixing
3.9
on the rine beams as ringa
I{G 50.1? ?9c : I 2,9 r1-.2 '.So :

o.1 Sarvn formwork to aides and sofEt of beam SQM co.38 q:D L I.g..gav L
8,11 Allow for curing of all concrete and maeonry rvork three tines a day Item I lS- e:o ,> ti tx;I
Q tt
Pmvide and 6:r in walis ventilation constituting of 100mm diametEr PVC
pipesi cut io lengtht of 250mm average, above all windows and doors. And
rnvprarl wif}r n nipre nlen$fpa irrv wirp
Sub'total t: 1)$slling
No. 4 ti ,:.o I -(1t
I a.ra I
t_s-u, -b
r

4 EIJMENT NO. 4 ROO[.SI,AB


4.1
Suppty and flt formwork to side ofroof slab, cost to include cutLing futfurg and
removal after eastine the slab as directed bv Ensineer on site
Supply and f-t formwork to eoEts of roof slab, eost to include cutting fixing
L,NI 20"6
l6n L 7 ,,:,LL
4.?
and rcmoval efter cmtinp the slsb ns direeted hv Enaineeron site
SMQ 24.96 ?tur: L 1i,.1 q a u.l
Supply ard fix support formworh to formlorlt fot slab soffit, cost to include
4.3 cutting, fixhg and removal after casting the roof slab as direeted by Engineer
on site
LM 600.00
t4" + I6,**$
Supply and flr 12mm high tensile square twisted bars; aold worked; 85446l
4.4 includiag benda, hooks, tying wire, dietanc€ blocks and spacers for mof slab KGS It0.84 P-t. L
reinforcement as direeted" on site by Engineer spaced at 200mm clc
"rr-ilb+
4.5
Supply and fix 10mm high tensile square twisted harsi cold worked; 8S4461
iucluding bends, hooks, tying rvire, distance biocks and spacers for mof slab
reinforcement ae directed on site by Eagineer spaced at 200mm cic
KGS 67.22 eso L lb,ac,> |
4.6
Supply all materials and cast a 100mm thick vibrated reinforeed concreto
6lab, mixl:2:4 or class 20190
Sub'total 4: RoofSLA.B
CIJM 2.45
[?, seo ] kr,rls
air
+
-5.-5(L+-
6 EIJMEN? NO. 6 DOORS
Supply and fix, prime grade uahogany panetr doors overall size 900mm x
5.1

<o
2000mm high, eomplet€ with 50mm x l50mm wrot mahogany door Aaming
enrl farlisht-
Supply and fix for all doors, 25mm quadrant beading.
NO.

L.M
4
6", ue t ? Llo,bw +
|J.qc!+- 18 orq".qe" +
5.3 Supply and fix fot all doors, 40mm x 25mm arctritraves L.M
"t0.03
40.03
*1sn 2A' t:>?-l+.
Io, o8 [.Jo.
Prepare and apply under coat and two coats gloss peint; Premium Grade
5.4
Brand to genera,l rurfaces of timber
SQIVI r8.33 55t
5.5 100mnr brass butt hinges with e set of metching screws Pairs l2 Fioo 4e 6. e."o S-
5.6 B-Lever mortice locks as "UNIOM cornplete with lever hatrdles NO. 4
E..5cvo.: aZ*=o.L
30mm diameter rubber door stops ra\y bolted to concrete
Srb'total 5: Doolg
NO. 4 2Co t 3. ewL
b EIJMENT NO. 6 WINDOWS
Supply and fi.:( Iourver type wirdow with 150mm x 50 mm pnme grade cedar
6,1 timber frami.ng shutters. Window size: 500mm wide x 500mm high complete
with the arrtfooriate snnmved lorrroer hlarles
NO. 4
6, z*cl Eq an,, I
6.2
45mo x 20mm removable cypress frames (beading) to dosquito gauze wire
oanels fixed with brass rvood eerews at 30omm cent-res
L.M I
-t.'J- 5 6.>*S
o.J Supply and fix for all windows internally" 40mm x 25mm architraves
Louwe glaas 160mm witle x 4mm for window size 500mm wide x 500mm high
L.M 6
*7ew
L i 6o.o .l
6.4 (Measured Net) sqNr I E,-s'&., I
?,.Stre
b"il Drill hole through 60mm thick timber ftames PCS" 1'
5.-L C--rL
6"6
Provide Bl2mm mild steel security horizontal baxs, cut and fitted in timber
window frames (holes and tames measured aeparat€Iy)
KG D R-9o: \,2<o{
b.',
Coffee tray meeh fixed to faces of window ftames with timber eover frames
{measured seraratelv)
SQM 1
Arfft L {o.4
6.8
Mosquito screens (plastic) fixed to faces of window framea with
frames (measured seuuatelv)
tiuber cover
SQM 1
5eo,r{ 5co+
6.9 Under eoat and tlvo eoats gloss oil paint to all rvood sur{aces SQM I c Ez--, .* -9-5cr:L

Company eigilsiamp Uofil Sarif AP Ablutiofi blocks


Supply and fix curtain boxes l.?m long complete vrith 150 x 95mm wide fastia,
6,1 2no, 1i0 x 25mm ends 100mm long 100 x 95mm blsckboard top; and 50 x
!6mm wrot cypress beareri plugged (104 no.)
PCS. 4
6.g10 |- P6,e*o I
I section cut'caia railing with and including 150mm laps, runners at l00mm
6. I1
cateN, stoppers
L.M 2
Q-,*wf €,e-.o J

,IIMnI\II' Nn 7 TNTIIBNAT. ItTNTSfm:S

?.I
2dmm thick Cement Sand (I:3) screed premixed with red oxide powder or
other *nnrovad nisment
sqM r9.14 -Isol- Ir[.3s.5 -!-
WolI finiohac
nq 15mm thick two coat cement sand {li3) plaster tro*elled emooth aud
comnrisins 12nm backine and 3mm finishine eoat.
SQM 79.1
l-s.s t 2-S
Prepare and apply three coats ofgloss oil painu 'Premium Grade btand' to
7.3
rrall surfsces
SQM 79.1 bbo P hq ,q-.q A
fiiELiwo-coat@rd
IE rorl

I
smooth and
comprising lzmm backirg ard 3mu finishing coat for 100mm high and 50mm
rhinlr eLi*ina
SQM ,o1
-l5(3L l,asr,s.o
Prepare and apply under eoat antl-i*o ioats of Fioss painl; grey to wall
cLiit-ihs: lOnmm
sqM ! 9l
E5,.cl- I 2 -9-.S'o
rffitr finialreq
?,6
lSmm thick two coat cenoent sand (1:3) plaeter trowelled smooth and
rnmorisinE l2mm h&.ldntr and lmm finie}inp nnnt.
SQM 24,96
T,S= L W,1LQ;
7,7
Prepare and apply three coats of white brilliant white painti 'Premium Grade
hrand' tn well srrrfecec
SQM 24.96
65ol t3 -124:
zl
Srrh-tatal 7i Internal finiehog I< I .Llie/ nt-
I ELEMENT NO. EXTEENAL I'INISHES
8.r
tSmm thich cement Band plaster rendered to beams, doors and all entrances,
srnrrnd windnws hrlildinsrnrnpr" qnd rqhlae
SEM 6.?? -7-<o I 5. s+o ,
8.2
Under coat and two coats gloss premium grade paint to general concrete areas
(innlnrlinc rcndererl nlinf hc) SQM 8.72 ,5so t 7aqz.
8.3 Eaking and keying to ,1-ss6ruy rryalling SQM 3S.66 6@E La
-€- 'a,?
s1L)- r 4
:
)TIIER COSTS
PPOVTSION OE'If,IA?I]:T

Provide lumpsum eost for piping works, cost to include installation works to
9.1 the abolution block showers, 2No wash hanal basin and connectiofl to the main
Iino i0m qwqv fram fha olrlrrfinn hlnalt
item 1.00 2&p-oJ-
?5o, SsU,l
o, Supply and install 5,000 [tres plastic tank ' Kentank or Roto on top ofthe
qbhrtinn hloek No 1
9o.e"*L 4o e*r. L
I
1 xcavation and arthworke l1f4 . /s't :
2 Subghucturea
{ rllinp 2'"f ' rcu-. (
'-lt- f€(1 ,

)ort 'z ) I - <.t A.


6 adowe LjJI.f\
t c,l- \AT,\
a ttarn*l fininlran ') -t --Z < )-:
I I rer ffittg <.LI 6 r\.,v\.*.

for one ilock


for 2 Ablutionblocks (reS)
?. rnlL iicr"?t
Zo t

Compsny sign/slmp 3sE s8.iF AP Abldhn blocks


ANNEX C.BOQS FOR FENCING SABIF POLTCE POST -WAJIR SOUTH
Fence Area: I.82 Acres (eZOm
Itom ltem Descriotion Unit Ouantitv Uait Rate Total Cost ffiES)
I Preliminaries
1.1 Excavate pits commencing reduced level and n. e
500mm deep to receiye concreted black pipe poles
No 19'
e=-f att",g.- |
clearing all shrubs and removing from site.
Excavate pits 400mm diameter by 500mrn deep to
receive 3" black pipes. The total nurnber ofthe pits for
I Feace Works
s.1 Supply and fix 3" medium-duty blaek pipe (Class B) No 320
complete with lugs for embedding in concrete, posts A , +.:ol ?, Laa,.=-+
plaeed at 3m intervals with strainer posts afber every
5post. The main posts should be 3m long and support
posts to be 1.7m long. The posts should be 2500mm
,9 Plain concrete 1:3:6 for concreting the black pipe and
hauching around the chain link wire.
Cm 8.44
&,"=.,f lea,+rc{
oe Supply and fix High tensile wire (>91Kg/mm'; 4no
strands of l2llrgauge barbed wire to black pipe posts for
Lm 1280
tSol tl r, u.r., I
straining the chain link ( KBS standard KS-261-2013)

2-4 Supply aad fix 14 gauge (r.gS to 2.05mm) chainlink


wile 8 bf high to black pi.pe posts stuained with barbed
*'ioa lIlQ ,41: 9n1e\
Lm 320
a,)" I >ee, bJ-+
qA Allow for binding wire. Kgs 10
?..so+
2.6 Allow for painting all black pipe posts with two coat Item I
stnrrlard rod nvida nrint t5, eoc{ 1S, ruso {
qn A1low for general bush clearanee, landscapixg and Item I
leveliing within the compounds. S.rt-ao{ 5o, n-.t- |
3 Supply and insLall gate - 2.4m x 5m (pair.ed at 2.5) Lumpsum 1
made of hollow steel square tube (HSST) 75mm x
1a-.,,r.s"{ I La,r*rc {
50mm framing with 50mm x 50mm ESSTplaced
vertically at 300mm c/c at 300mm c/c horizontal
crossing. The gate is hoisted on 3mm dia, black pipe
used in fence posts on either end connected with
38mm bush on either end, the gate is then covered by

Total-INo. Fence'KES 3, S+a, 7-o]

Company Sign/stamp lofl Sarif AP Fence