Professional Documents
Culture Documents
Phase L1-E:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 25.90 ms 25.90 ms Passed
Phase L2-E:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 29.50 ms 29.50 ms Passed
Phase L3-E:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 30.90 ms 30.90 ms Passed
Phase L1-L2:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 21.90 ms 21.90 ms Passed
Phase L2-L3:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 27.70 ms 27.70 ms Passed
Phase L3-L1:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 26.30 ms 26.30 ms Passed
Phase L1-L2-L3:
Testing Imp
Sl No. Angle Zone T Nominal T Actual % DEV Passed / Failed
(Z)
1 1.563 Ω 75.00 ° Z1 0.00 s 21.90 ms 21.90 ms Passed
Tested By Checked By
Y
51
Element
Tested By Checked By