Professional Documents
Culture Documents
Request NDT Section 4 TGL 09-12-2022
Request NDT Section 4 TGL 09-12-2022
PTM
Sch./ NDT METHOD
NDT Ø Welder Welding
No. Drawing No. Line No. Joint No Material Thk. Remarks
% (Inch) Stamp Proses RT UT PT MT
(mm)
SECTION 4
W‐41 /
1 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 43 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
2 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 45 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
3 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 47 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
4 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 49 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
5 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 51 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
6 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 53 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
7 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 55 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
W‐41 /
8 MTA‐M‐51D‐10096 6"‐HL‐6G‐80139 50% FW 57 PIPE X PIPE 6" 80 SMAW √ ‐ ‐ ‐ SECTION 4
W‐42
Note : RT : Radiographic Test, UT : Ultrasonic Test, PT : Penetrant Test, MT : Magnetic Particle Test, VIS : Visual
Page 1 Form NDE Request.xlsx