1 Tower Main Body Check the factory test report of the tower material. Pass□ Fail□ 1 Critical
Upload
Dimensions of
Steel Ruler,
4 tower and mast Length and diameter of anchor bolts Pass□ Fail□ Picture Upload 4 Critical
Instruments
components
5 Aviation Light The aviation light are installed and routed properly. Pass□ Fail□ Observation Picture Upload 1 Critical
Aviation Light
6 Material and cabling specifications Pass□ Fail□ Observation Picture Upload 3 Critical
Wiring
Antenna Bracket,
7 The antenna support and platform are installed properly. Pass□ Fail□ Observation Picture Upload 1 Critical
Platform
After the two nuts are tightened, the screw thread exposed
Exposed Bolt outside the bolt should be at least 2 threads or according to
8 Pass□ Fail□ Observation Picture Upload Critical
Screw design requirements. (One photo of the anchor bolt on every 3 or 4
leg of the tower)
Hot Galvanization or brush with antirust paint.
All the cable tray are connected together and properly
Onsite
9 Cable Tray grounded. (Overall Picture) Pass□ Fail□ Picture Upload 4 General
Checking
Both ends of the outdoor cable tray should be grounded.
(Greenfield Site can have only one end grounded)
10 Tower foot Bolt Tower foot Bolt brush with hot asphalt or antirust paint Pass□ Fail□ Observation Picture Upload 2 modify Critical
connection point)
On behalf of:
DITO Representatve: FNT Representative: Vendor: Design Institute: Supervisor:
Name: Name: Name: Name: Name: