Tower Body

Site ID: Site Type: Date:


Site Name: Subcon: Team Leader:
Region: Province: Inspector:
Longitude: Latitude: Inspector Sign:

Standard(Pictures Including time and longitude&latitude,tools to Inspection Mandatory No.


No. Inspection Content Result Acceptance Method Remarks Severity
perform on-site measurement) Method of Picture

Picture (documents)
1 Tower Main Body Check the factory test report of the tower material. Pass□ Fail□ 1 Critical
Upload

Overall Verticality ≤H/1500 (3 Legged Tower,4legged Tower)


2 Tower Verticality Pass□ Fail□ Theodolite Picture Upload 2 Critical
Overall Verticality ≤H/759 (Monopole Tower)

Dimensions of
Steel Ruler,
4 tower and mast Length and diameter of anchor bolts Pass□ Fail□ Picture Upload 4 Critical
Instruments
components

5 Aviation Light The aviation light are installed and routed properly. Pass□ Fail□ Observation Picture Upload 1 Critical

Aviation Light
6 Material and cabling specifications Pass□ Fail□ Observation Picture Upload 3 Critical
Wiring
Antenna Bracket,
7 The antenna support and platform are installed properly. Pass□ Fail□ Observation Picture Upload 1 Critical
Platform
After the two nuts are tightened, the screw thread exposed
Exposed Bolt outside the bolt should be at least 2 threads or according to
8 Pass□ Fail□ Observation Picture Upload Critical
Screw design requirements. (One photo of the anchor bolt on every 3 or 4
leg of the tower)
Hot Galvanization or brush with antirust paint.
All the cable tray are connected together and properly
Onsite
9 Cable Tray grounded. (Overall Picture) Pass□ Fail□ Picture Upload 4 General
Checking
Both ends of the outdoor cable tray should be grounded.
(Greenfield Site can have only one end grounded)

10 Tower foot Bolt Tower foot Bolt brush with hot asphalt or antirust paint Pass□ Fail□ Observation Picture Upload 2 modify Critical

All the outdoor facilities/equipments shall be within the


11 45degree coverage area of lightning arrestor. (Close up on the Pass□ Fail□ Observation Picture Upload 2 Critical

top of tower with lightning arrestor visible)

The lightning rod or the metal pole that is electrically connected


to the lightning rod must be grounded by using a multi-strand
12 Lightning Arrestor copper conductor with a diameter not less than 95 mm or a Pass□ Fail□ Observation Picture Upload 4 Critical
galvanized flat steel with a size of 40 mm x 4 mm.(1 Pic)
When the galvanized flat steel is grounded, the welding length
must be greater than or equal to 100 mm. (1 Pic)
The downlead of the lightning rod is welded on the lightning
13 belt or connected to the grounding system. (Picture of the Pass□ Fail□ Observation Picture Upload 2 Critical

connection point)
On behalf of:
DITO Representatve: FNT Representative: Vendor: Design Institute: Supervisor:
Name: Name: Name: Name: Name:

Signature: Signature: Signature: Signature: Signature:


Date: Date: Date: Date: Date: