NFP Inspection of ADI-JVN Section by CSE-II-WR by 22935 On 12-10-2022

You might also like

You are on page 1of 4

Points noted during Night Footplate Inspection of ADI-JVN Section carried-out by

V.K. Shrivastava, CSE-IIWR/CCG by 22935 BDTS-PIT Exp on 12.10.202.


Accompanied by: 1. Shri Vaibhav Upadhyay, ADSTE/SUNR
2. Shri Madan Singh Chouhan, SSE (Sig)/SBI
3.Shri Shashi Kumar Soni, CLVADI
(A) LOCO& TRAIN DETAILS:
Train No. & Train Name 22935 BDTS-PIT Exp
Engine No, its baseand load of the train. 39080 (WAP7) ELS/BRC [21 Coaches]
Cab Working Cab-2
4 Last Schedule done IC 01.09.2022 TI 11.10.2022
From and Departure Time. ADI (d) 01:05 Hrs. (30" late)
i) To and Arrival Time. JVN (a) 03:12 Hrs. (49" late)
6. Name of Loco Pilot (LP) with his HQ. Ask for Shri Samir Trivedi (HQ - BVC). He was in
welfare, leave, uniform, etc. proper uniform. He had no issues
7. Name of Asstt. Loco Pilot (ALP) &his HQ. Shri Rakesh Dhapa(HQ-BVC)
8 Name of Train Manager (TM) &his HQ. Shri Shiv Ram Meena (HQ -BVC)
Whether Walkie-Talkie communication Walkie-Talkie No. BVC 01 was available
between LP &TM was working properly? with LP. It was working erratically.
10 ) Brake Power Certificate No. 897133
(ii) Brake Power Certificateissued at BDTS on 11.10.2022
(iil) Air Pressure (B.P.) in Loco. 5.0 kg/cm
iv) Air Pressure (B.P.) in Brake Van. 4.8 kg/cm
(v) Total No. of cylinders. 168
(vi)No. of effective cylinders. 168
(vii) Brake Power %. 100%
11. Whether following engineequipments were in working order?
(a) Headlight It was dim & not focused.
(b) Electrical speedometer Working
C) Mechanical speedometer Not available
(d) Flasherlights Working
(e) Markerlights Working
12. Whether speed recorderis provided? Yes
13. Whetherprinted cautionorderisavailable with LP&ALP? Yes
14 Whetherany unauthorized personis traveling inthe Loco? No
(B)TRAIN DURING RUN:
15. Whether LP checks the brake power of his train Brake Feel Test (BFT) was done
at first opportunity. immediately after starting from ADI1
which was satisfactory as per LP
Thereafter, Brake Power Test (BPT)
was done at KM 499/10 in ADI-SBI 'A"
which was satisfactory as per LP
16 Whether LP & ALP whistle while approaching | Yes
W/WL boards up to LC crossing gates & running
through stations.
17. Whether the engine crew looks back frequently, Yes
particularly on curves to ensure safe and
complete running of trains.
|18. Whether LP stops &starts the train without jerk. Yes
19. Whether calling out
of signal aspects between Yes
LP/ALP is correct.
Night Footplate Insp of ADI-JVN section on 12.10.2022 by 22935 BDTS-PIT Exp by CSE-IIWR
20 Whether engine crew are watching safe passage Yes
of trains on adjacent line & checking tail
board/tail lamp & TM's signal on adjacent line.
21 No. of Cautious Driving (CD) Spots & whether There were 07 CD spots which were
LP& ALP had correctly followed all of them correctly followed by Crew
LP's PERFORMANCE BOOK:
(C) FROM
1.Date of last PME (Eye-sight examination) [ Next Due] 1107 2022 [|1072023]
Date of last Technical Course attended. [Next Due] 1801 2022 [18 01 2025]
2
Date of last Transportation Course attended. [Next Due]| 14.08 2020 [14 08 2023|
4 Compctency certificate for automatic sigg working? Not applicable
S Whether ghat competency certificateis available? Not applicable
6. Safety Performance Certificate. White Card (issued on 05 06 22)
Nominated LI ShriKarthikeyan V.,CLI/BTD
Last counseled on (Date/Train/Loco No./Section) 01.10.22/Train No. 12972/Loco
No. 40420/SOJN-BVC section
(D)FROM ALP's PERFORMANCE BOOK:
Date of last PME (Eye-sight examination) [Next Due] 08.07.2019 [07.07.2023]
Date oflast Technical Courseattended. [Next Due 12.01.2020[12.01.2023]
[17.01.2023]
17.01.2020
Date of last Transportation Course attended. [Next Due]
Competency certificate for automaticsigg working? Not applicable
Whether ghat competency certificate is available? Not applicable
6. Safety Performance Certificate. Not applicable
Nominated LI Shri D R Mankar, CL/BVC
07.10.2022 in RR/ADI
8. Last counseled on
(E) CHECKING OF SAFETY EQUIPMENTS OF LP:
1 Whether sparespectacles are available with LP (if he uses it)? Yes
2. Whether LPhad following personal equipments?
i) G&SR book with all Correction slips updated. Yes
Tri-colour torch was available
11) Handsignallamp with red & green slides intact
iii)2 red and 1 green flag in good condition. Yes

iv) Detonators -10 Nos.(Date of mfg). Yes (Mfg: 2011)


v Fusee 1 No. : Year of mfg.&its conditioon. No
Yes
V1) One tri-colour hand signal torch.
Yes
vii) Accident Manual with all Correction slipsupdated.
Yes
viii) Tool bag with standard tools. Available in Loco Cab
ix) Onespare headlight bulb.
3. Whether the following Safety Equipment are available in Loco?
Woodenwedges 2 Nos. 04Nos. available
Fire Extinguishers-2 Nos. (Refilling Due on) 04 Nos. available (3001.2023)
11)
iii) Field telephone set (PCP). Not applicable
iv)Audio-visualindicators for airflow meter working? Yes
(F) CHECKING OF SAFETY EQUIPMENTS OF ALP:
Whether spare spectacles are available with ALP (if he uses it)? Noo
2 Whether ALPhad following personal equipments?
G&SR book with all Correction slips updated Not provided
Hand signal lamp with red & green slides intact. Tri-colour torch provided
11)
2 red andl green flay in good condition. Yes
i)
Detonators 10 Nos. Date of manufacturing Not provided
iv)
Fusee I No Year of mfg. & its condition Not provided
v
torch Yes
vi) Onetri-colour hand signal
22935 BDTS-PIT Exp by CSE-I/WR
Night Footplate Insp of ADI-JVN section on
12. 10.2022 by
Vin) Accident Manual with all Correction slips updated Not provided
vii) Tool bag with standard tools. No
(G) OTHER OBSERVATIONS:
S.
Observations Action byy
No.
LP highlighted about the Neutral Section situated in ADI-SBI Sr. DEE (TrDyADI
A section whose 500-M Board has been fixed at KM 497/22,
250-M Board fixed at KM 497/30 & D/J Open Board fixed at
KM 498/4, Further, it was seen that D/J Open Board was in
approach & close vicinity of Signal No. S-3 of SBI A', which
makes it difficult for the LP to perform mandatory activities
related to Neutral section as well as observe aspect of this signal.
LP further pointed out about the Neutral Section situated in
JKA-VG block section whose D/J Open Board is in close
vicinity of Dn Starter & Dn Advanced Starter Signals of JKA
station.
It would be prudent to arrange for shifting of Neutral Section
away from any Stop Signal (as enumerated in ACTM) since
observance of signal aspect alongwith carrying-out other
activities in Lococould diverttheattention oftrain crew
2 On perusing the list of Caution-Orders issued to the train, it was Sr. DEN (Co)/ADI
noted that, in case of speed restrictions in ABD-SAU block Sr. DOM/ADI
section, SR of 20 KMPH was to be observed in between KM
512/24-512/40 followed by SR of 45 KMPH in section between
KM 512/40-513/34. Thereafter, SR of 20 KMPH was to be
observed in section between KM 517/30-518/04. LP
complained that it was not possible to pick-up speed in such a
case & as a result, there is considerable time-loss in the entire
stretch from KM 512/24 to KM 518/04. This may be reviewed
& modified, if need be.
3 Some of the SR boards were seen to be fixed on OHE Masts, Sr. DEN (Co)/ADI
which is not proper. All Engg. SR boards should be erected on Sr. DEE (TrD)/ADI
ground on a post by itself.
4 It was informed that AC was not working in Loco Cab. This is Sr. DEE (TRS/BRC
tobe got attended early.
5. Loco headlight was seen to be bulb-lit and had poor focus. It Sr. DEE (TRS)BRC
may be replaced powerful LED headlight for the convenience of
crew
Wrong time was being shown in the Driver's Display in Cab-2, Sr. DEE (TRSVBRC
which needsto be attended on priority
7 It was seen that Repeater Signal has been provided on PF No. Sr. DSTE (CoVADI
of Viramgam station. However, R-marker is to be painted over
its Signal Unit for the guidance of train crew & TM.

No. SG 115/5/10/1 e-office No. 3879 Dtd. 25.10.2022


2510.2022

(Vinay Kumar Shrivastava)


CSE-IWR/CCG

Night Footplate Insp of ADI-JVN section on 12.10.2022 by 22935 BDTS-PIT Exp by CSE-IWR
Copy to:
PCSTE/WR for kind information.
PCSO/WR for kind information. This is in reference to his
letter No.
2.
UHUETS/257/UHVTTfAfARNETUT- 14/ HTT-IV f&aiT 22.09.2022.
DRM/ADI for kind information.
Sr. DSTE/ADI, Sr. DEN (Co)/ADI, Sr. DOM/ADI, Sr. DME/ADI, Sr. DEE (TrD)/ADI
.
&Sr. DEE (TRS)/BRC for information & reporting compliance please.
Sr. DSTE/BVP for information & ensuring proper working of Walkie-talkies being
provided to LPs please.

Night Foorplate Insp of ADI-JVN section on 12.10.2022 by 22935 BDTS-PIT Exp by CcSE-IWR