Name of Work: Construction of yard plinths, cable ducts and light poles for enhancement of 110/11 KV power transformer capacity from 1x10 MVA to 1x16 MV
Name of
the
Bidder/
Bidding
Firm /
Compan
y: PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liabl
allowed to enter the Bidder Name and Values only )
R.C.C. 1:1.5:3 using 12- 20mm metal for HV breaker with form
0.00
work using steel centering for soffits of reinforced cement concrete
slabs or plain surfaces including stutting up to 3m high, using M.S.
Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded
M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country
4 wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and
1.46 M3
supported by casurina props of 10cm to 13cm. dia (spaced at 75cm
c/c) complying with standard specification including cost of all
materials,transport, curing, labour, lead, lift etc. complete.as per
standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal for cover slab with form
0.00
work using steel centering for soffits of reinforced cement concrete
slabs or plain surfaces including stutting up to 3m high, using M.S.
Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded
M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country
5 wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and
0.41 M3
supported by casurina props of 10cm to 13cm. dia (spaced at 75cm
c/c) complying with standard specification including cost of all
materials,transport, curing, labour, lead, lift etc. complete.as per
standard specification as directed by the dept. Engineer at site.
0.00
Providing steel reinforcement for all RCC works including
cost of all materilas steel, binding wire, labour, lead, lift,
6 cutting, bending, typing and binding and placing in position
1.03 MT
etc., complete as directed by the department engineer at site.
0.00
Providing and laying P:C:C 1:2:4 using 20mm HBG metal
without form work including cost of all materials,curing,
7 labour, lead, lift etc. complete.as per standard specification as
38.25 M3
directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone for 0.00
Plinth with form work using steel centering for soffits of reinforced
cement concrete slabs or plain surfaces including stutting up to 3m
high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage,
stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid
8 over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at 3.48 M3
about 90 cm c/c) and supported by casurina props of 10cm to 13cm.
dia (spaced at 75cm c/c) complying with standard specification
including cost of all materials,transport, curing, labour, lead, lift etc.
complete.as per standard specification as directed by the dept.
Engineer at site.
Brick work in C M 1:5 using good quality secound class 0.00
chamber burnt bricks for basement including cost of all
9 materials labour, lead & lift etc., complete as directed by the
3.11 M3
department at site.
fabrication, galvanising and supply of foundation bolt and nuts 0.00
with 2 nos of washer in high tensile steel including 10 cm L at
bottom and 15 cm threading with 2 nuts and washers at top
10 including all materials, labour,lead,lift etc., complete as directed
60.00 Nos
by the department engineer at site. 20mm dia,1.80 mtrs
length
Providing grout holes at required position including cost of all 0.00
11 materials, curing,labour, lead and lift etc., complete as directed 4.00 Nos
by the department engineer at site.
Labour charges for assembling of template in correct 0.00
position and aligenment for various equipment plinth and
grouting the foundation bolts including cost of all materials
12 transport, labour, lead, lift etc., complete as per standard 16.00 Nos
specification and as directed by the dept. Engineer at site. (The
template will be make own arrangement by the
contractor)
Supplying and fixing MS angles for cable duct including the 0.00
cost of cutting to required length, fixing in position and all
13 materials, labour, lead, lift, etc.,complete and as directed by the
20.25 Kgs
department engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all 0.00
materials, transport, curing, labour, lead, lift etc. complete.as
14 per standard specification and as directed by the dept. Engineer
35.00 M2
at site .
0.00
Colour washing two coats using exterior emulsion paint over
one coat of white washing including cost of all materials, labour,
15 lead lift etc., complete as per standard specification and as
185.90 M2
directed by the department engineer at site.
Filling with stone dust including cost of all labour, transport, 0.00
16 materials, leads, lift,etc., complete and as directed by the 7.00 M3
department engineer at site.
Filling with 20 mm BG metal including cost of all labour, 0.00
17 materials, transport, leads, lift,etc., complete and as directed by 7.00 M3
the department engineer at site.
0.00
Supplying, laying of PVC pipe with required PVC bend T&L bend,
union including cutting, jointing, wherever necessary earth work
18 excavation refilling dismantling masonry if necessary including 10.00 RM
cost of all materials, lead & lift etc.., complete as directed by the
department engineer at site. 20 mm dia
TEXT #
TOTAL AMOUNT
In Words
55
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Please Enable Macros to View BoQ information
Q information