FINAL INSPECTION REPORT


Inspection Report NO Date
Client PO
Project/Project Code GAD
Job Description QAP NO

Required Actual (mm)


S.No Drawing No. Mark No. Qty. Description Remarks
(mm) 1/5 2/5 3/5 4/5 5/5

CONCLUSION
1 ALL DIMENSION IN MM

2 ALL PART FITMENT HAS BEEN DONE AND FOUND AS PER DRAWING.

3 ORIENTATION OF JOB HAS CHECKED AND FOUND AS PER DRAWING.

4 DIAGONALS OF JOB HAS BEEN CHECK AND FOUND WITHIN ±1 MM.

5 MATCH MARKING AND MATCH DRILLING HAS BEEN CHECKED AND FOUND OK.

6 HARD PUNCH DONE ON JOB AS PER DRAWING

7 WATER LEVEL OF JOB HAS BEEN CHECKED AND FOUND WITHIN ±3 MM

8 WELD SIZE HAS BEEN CHECKED AND FOUND AS PER DRAWING

9 WELD VISUAL,GRINDING & FINISHING HAS BEEN DONE AND FOUND SATISFACTORY

10 JOB RLEASE FOR FURTHER PROCESS

FOR SBMPL PAGE 1 OF 1 FOR CLIENT