You are on page 1of 1

Sl. No.

Module Program Clarification point


In Estimation Approval - hereafter the approver closing the record without any changes and If no
changes are detected, then the check message should not be raised, Same in Repair Estimation is
1 M&R Repair Estimation
it required ?
Yes, the same should be applied for Repair Estimation UI.

In the repair grid details FULL DESCRIPTION – COMPONENT AND REPAIR TYPE should display
2 M&R Repair Estimation Approval maximum 60 character limit (including spaces). For Expand all option is it required ?
Yes It is required.

For DV and RE conatiners, we are maintaining the per hour rate for Labour Hours, For Genset and
3 M&R Tariff Calculation Chassis containers how we need to calculate ?
Same like dry van & Reefers
Height is removed in the Approval screen, same Repair Estimation & Direct Estimation screens
Repair Estimation & Direct
4 M&R also is it need to remove ?
Estimation
Yes, applicable to Repair Estimation and Direct Estimation UI.
If we try to upload the details in excel, user tries to enter the labour hours manually whether it
5 M&R Genset Handling should calculate the amount after uploading the file.
file - first preference & Tariff - 2nd preference

After adding the Repair Details system must validate the new combination in setup while
6 M&R Direct Estimation finalizing/saving the record, System must raise what validation Message in the popup.
elaborate more

Sensitivity: Internal

You might also like