You are on page 1of 1

APPROVAL ISSUE

KITCHEN TOP CABINET SIGNATURE:


KBF FOR ECCC
LINE BELOW CEILING CUT-OUT FOR ACCESS PANEL
CHIMNEY 600X600mm
CONSTRUCTION ISSUE

SIGNATURE:
2106 350 2683

275
KBF FOR ECCC

510
600
KITCHEN
COPYRIGHT EAST COAST CONSTRUCTION COMPANY
CH-2250 PTY. LTD.

1400

1402
REPRODUCTION OF THE WHOLE OR PART OF THE

600
DOCUMENT CONSTITUTES AND INFRINGES
KITCHEN LINE COPYRIGHT. THE INFORMATION, IDEAS AND
BELOW

800
AP CONCEPTS CONTAINED IN THIS DOCUMENT ARE
CURTAIN TRACK CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT

290
ARE PROHIBITED FROM DISCLOSING SUCH
INFORMATION IDEAS AND CONCEPTS TO ANY PERSON
LAUNDRY WITHOUT PRIOR WRITTEN CONSENT OF THE
COPYRIGHT HOLDER. ECCC HOLDS A LICENSE FROM
CH-2250 682 3134 600 722 3477 ARBT IN RESPECT OF PROPRITARY ITEMS

3226
2389 20 5525 250 NOTE THIS DRAW ING IS PREPARED BY EAST COAST

614
CONSTRUCTION COMPANY UNDER ITS QBCC LICENCE
FOR THE USE OF EAST COAST CONSTRUCTION
351

SEC-2 COMPANY PTY LTD AS THE CONTRACTOR ON THIS


PROJECT
20mm CONTROL JOINT A-250
LOUNGE SUB- CONTRACTORS TO CHECK AND VERIFY ALL
AP/ CEILING CUT-OUT LEVELS, DATUMS & DIMENSIONS ON SITE AND SHALL

1826
CH-2538 REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS

1979
600

AIR EGGCRATE GRILL FIX AT SITE


1067

OFFICE PRIOR TO START OF WORK & DURING THE


459 600 1833 5834 2100 0 CONSTRUCTION PHASE.
TEMPLATE ACCESS THE DRAWING ARE TO BE READ IN CONJUNCTION
SHAFT WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND
OR ANY OTHER CONSULTANTS DOCUMENTATION AS
CH-2250

SEC 3
A 250
600
559

AG
450

459 257 1000 1176

120
AG AG

10
153

10

10
120
AG AG

120

239
363

387

600

600

600
CH-2200 CH-2200 K 10.08.2020 MG DAN REVISED AS PER FLOOR PLAN
150
AP 2114 J 21.01.2020 JN BB RREVISED AS PER COMMENTS
H 06.01.2020 JN BB RREVISED AS PER COMMENTS
600

600 1284 AG 1110 AG


G 01.11.2019 ASM BB
CEILING CUT-OUT
BATH CURTAIN TRACK REVISED
900

F 23.10.2019 ASM BB ACCESS PANEL REVISED


FIX AT SITE CH-2250
E 10.02.2019 ASM BB BATH & ENSUITE CEILING
218 600 198 600 1158 HEIGHT REVISED
324

CH-2200 BED-2 700 1313 672 172 224 D 09.09.2019 ASM BB PRELIMINARY ISSUE
C 10.08.2019 ASM BB PRELIMINARY ISSUE
BED-1
250

CH-2538 BALCONY B 14.06.2019 ASM BB PRELIMINARY ISSUE


CH-2538 SEC-1 CH-2538 A 01.05.2019 ASM BB PRELIMINARY ISSUE
A-250

2982
REV DATE DRN CHK DESCRIPTION
243

CH-2200
318

CLIENT:
2627

2626
ENSUITE
AP CH-2250
ASIA PACIFIC
BULK HEAD
600
600

172
710 1985 262
600 730 600 967
AG
DESIGN & CONSTRUCTION:
188 290 2460
CH-2435
670
595

EAST COAST CONSTRUCTION COMPANY PTY LTD


E-mail: admin@ecccgroup.com.au
CEILING CUT-OUT Telephone: +61 (448)904475
FIX AT SITE
DETAIL AND DRAFTING:

General Notes:
LEGENDS:
1. All penetrations for services through metal stud joists and supports shall be fitted
with snap bushes to protect services from sharp edges.

2. All services shall be securely clamped to avoid displacement and damage through - 9.5mm UNISPAN BORAL BOARD - CH-2538 FROM STRAKEN PANEL (DROP 162mm)
transport, movement , water hammer etc and as detailed in the services layout RCP Bradman Technologies Private Limited
31/22,Victoria Cresent Rd.Egmore,Chennai - 8,India
drawing. TEL: +91 44 42043347 Email: info@bradmanit.com

3. False ceilings linings, framing etc shall be fabricated with non combustable PROJECT:
materials. - 6mm FC HUME BOARD - CH-2250 FROM STRAKEN PANEL (DROP 450mm)
PROPOSED RESIDENTIAL AT PLOT-50&
4. Fixings for services and fixings for wall studs below fire ceiling layer shall not be REFERENCE DRAWINGS: 54,CARL STREET,
WOOLOONGABBA,QLD,AUSTRALIA
located at fire sheet joints.
- 9.5mm UNISPAN BORAL BOARD - CH-2250 FROM STRAKEN PANEL (DROP 450mm) A 250 - SECTIONAL & BLOWN UP DETAILS
5. All fire ceiling joints shall be taped and set prior to installation of false ceilings and
full height walls and sheets laid in a staggered pattern. DRAWING TITLE:
Notes:
6. penetrations through fire ceiling layer for vertical plumbing pipes shall be made - 9.5mm UNISPAN BORAL BOARD - BULK HEAD DROP
with clean square edges with casing bead left ready for site fixed linings and fire FOR CURTAIN TRACK - CH - 2435 FROM STRAKEN PANEL (DROP 265mm) - ALL THE CEILING HEIGHTS ARE MEASURED FROM STRAKEN PANEL UNIT 105 - RCP
collars as detailed . - ALL DROPS ARE MEASURED FROM FIRE CEILING LEVEL

8/10/2020 4:46:45 PM
- ALL TOILET CELINGS & LAUNDRY CEILINGS ARE FIXED AT SITE ONLY
- DIMENSIONS ARE ALL MEASURED FROM FINISH TO FINISH DRAWN: CHECKED:
7. Fire linings shall be completed to full perimeter edge of modules. - 10mm PLYWOOD BOARD - CH-2250 FROM STRAKEN PANEL (DROP 450mm) - ACCESS PANEL LOCATION IN TOILET TO BE VERIFED BY FACTORY ASM BB
8. Check and confirm items 1 to 7 above prior to sheeting false ceilings FIRST ISSUE: SCALE:
AG - AIR GRILL 01.05.2019 1 IN 40 @ A3
9. For Lighting layout refer electrical drawing.
PROJECT NO DRAWING NO REVISION
AP - ACCESS PANEL
1802 A 216 K