Dated :October 10, 2022

Mr. SHI HONGWEI


Project Manager
M/S China Harbour Engineering Company
China -Aid Seawater Desalination Plant
Gwadar Port Authority (GPA)

Subject: Site Instructions Note

Dear Sir,

The Standard Penetration Test (SPT) being conducted by Commercial laboratory M/S Soil
Testing Services (STS) on the site of the Seawater Desalination Plant should be carried out
in accordance with the required standards and specifications, and samples should be
collected for additional testing. We will only oversee and not verify all the tests and activities
being carried out following SPT till its comprehensive results are received, verified by the
Designer, and presented to Consultant NESPAK .When its results are available and the
designer will confirm that the SPT results meets Specifications, we will validate all tests and
activities being carried out after SPT.

Regards,

Site Engineer
Seawater Desalination Plant (Gwadar Port Authority-GPA) @ Gwadar City NESPAK

CC:
Mr. Muhammad Daud Baloch -Project Director China-Aid Seawater Desalination Plant
Gwadar Port Authority
Mr. Abdul Wahid -Deputy Project Director Sea water desalination plant @ Gwadar GPA
Mr. Syed Ali Sher Shah -Project Manager Seawater Desalination plant @ Gwadar NESPAK
Mr. Ali Nawaz Bhutto – Resident Engineer Seawater Desalination plant @ Gwadar NESPAK
Mr. He Zhaown. The Consortium for institute of Shanghai Architectural Design and Research
Co.Ltd and Guangzou Suike Construct Managements Co.Ltd