You are on page 1of 4

RAS AL HADD DEVELOPMENT PROJECT – OMAN

Al Jaber Engineering Company, LLC


QDRH22302: Construction of 200 Keys 5* Luxury Hotel,
50 Keys Chedi Villas, Luxury Spa, Beach Club & Associated Infrastructure Work

RATE ANALYSIS
RUN DATE
Description

Rate Analysis for Extra Excavation

BOQ Rate
Item No. Description Unit
- Rate Analysis for Per Cum -

Rate Adjustment
Rate

Category Percentag Adjustme Remarks


Amount Amount
e Input nt Factor
Day work rates from Bill no.# 2, page
Painting for 6 sqm area
no.3 & 4

A. Labour

1. Painter 100.00% 1.800 3.000 5.400 1nos. X 3 hr

2. Helper 100.00% 1.500 3.000 4.500 1nos. X 3 hr

Sub Total (A) 9.900

B. Material

Painting for 6 sqm area Ref :LPO:TCC-PO-MQ-00011

Black Paint: (RO 30/18Ltr=1.670 RO/Ltr) 1.670 2.000 3.340 Black paint coverage for 6 m
Ltr = 2 Ltr x 1.670 RO = 3.34 RO
Thinner (RO 25/20Ltr=1.250 RO/Ltr) 1.250 1.000 1.250 Thinner is half ltr for 2 Ltr paint

Sub Total (B) 4.590

C. Plant
Brush, cleaning tools etc 1.000 0.297 3% of Labour cost
Movable Scafolding 3.000 (Consider for 1m2 OMR 0.5)

Sub Total (C) 3.297


Base Cost (A+B+C) 17.787
Add - Profit & OH 15.00% 0.689 For Materials
Unit Rate (R.O) For 6 sqm area per coat 18.476
Unit rate per 1sqm. Per coat 3.079

Revised Rate
Item No. Description Unit
Unit rate for 1M2 sqm area Black Painting for Soffit
3/SR/560 of Slab M2
(Rate Per 2 Coats)
Notes (If any)

Contractor: Consultant:
31 December 2022

Rate (R.O)
-

Remarks

ork rates from Bill no.# 2, page


&4

PO:TCC-PO-MQ-00011

paint coverage for 6 m 2 area is 2


2 Ltr x 1.670 RO = 3.34 RO
er is half ltr for 2 Ltr paint

Labour cost
der for 1m2 OMR 0.5)
aterials

Rate (R.O)

6.159