RATE ANALYSIS
RUN DATE
Description
BOQ Rate
Item No. Description Unit
- Rate Analysis for Per Cum -
Rate Adjustment
Rate
A. Labour
B. Material
Black Paint: (RO 30/18Ltr=1.670 RO/Ltr) 1.670 2.000 3.340 Black paint coverage for 6 m
Ltr = 2 Ltr x 1.670 RO = 3.34 RO
Thinner (RO 25/20Ltr=1.250 RO/Ltr) 1.250 1.000 1.250 Thinner is half ltr for 2 Ltr paint
C. Plant
Brush, cleaning tools etc 1.000 0.297 3% of Labour cost
Movable Scafolding 3.000 (Consider for 1m2 OMR 0.5)
Revised Rate
Item No. Description Unit
Unit rate for 1M2 sqm area Black Painting for Soffit
3/SR/560 of Slab M2
(Rate Per 2 Coats)
Notes (If any)
Contractor: Consultant:
31 December 2022
Rate (R.O)
-
Remarks
PO:TCC-PO-MQ-00011
Labour cost
der for 1m2 OMR 0.5)
aterials
Rate (R.O)
6.159