EMIRATES FLIGHT CATERING CO.

LLC , DUBAI, UAE

Emirates Flight Catering is the largest flight catering kitchen the world. Starting at a modest 50,000 meals a
day in 2003 in Phase 1 the new modern Kitchen known as EKFC Phase 2 is designed to handle 110,000
meals a day. Phase started operation in 2007 after the client was extremely satisfied with the Phase 1
delivery in 2003.

During Phase 1 the client had only opted for the Envac system in the ware wash area with three Trash
Waste Inlets at the end of the tray conveyor and stripping belts. The hygienic, easy and quick waste
removal and handling technology demonstrated by Envac was very clear to the client that this systems was
the most efficient ways of getting rid of waste and solved a lot of their health and safety issues and
ensured a hygienic environment and modern approach to waste handling.

With the growth of the Dubai International Airport the new facility was commissioned and designed
keeping Envac and its various bespoke solutions in mind. Today EKFC has over three systems managing
110,000 meals and close to 100 tons of waste per day. The systems cater cover 6 lines of conveyors
stripping waste from incoming flight. Bulky waste like bottles and paper are shredded separately. Kitchens
are equipped with screw feeders, Trash chutes, Baggage carousels, and cardboard balers. The system
consists of both 323mm and 219mm dia pipes and special dewatering systems at specific inlets to ensure
that waste is collected and disposed effectively. The collection station waste separators are connected to a
screw feeder conveyor which diverts incoming waste into an available container.

Truly Envac Kitchen Waste Systems at EKFC today have ensured that waste created from meals prepared
for over 45 million passengers who depart or transit thru’ Dubai are disposed effectively, hygienically and
safely.

Project Start Up 2005


Project Completion 2007
System Type Kitchen Waste System – KWS Maxi Vac
No of Systems 3
No of Inlets 11
No of Fraction 1
Length of Pipe 1100 RM
Tons per Day 100 Tons / Day

Expansion for another 100,000 meals has been awarded and is under Installation and will be ready by
2016.

Project Profile – Middle East Region Page 1 of 20


JUMERIAH BEACH RESIDENCE, DUBAI UAE

Jumeirah Beach Residence is the single largest residential development in the world, 40 towers comprising
of 36 residential towers and 4 five star hotels spanning a built up area of 22 million sqft across 7 podiums
interconnected at podium level. The towers span various heights from 28 to 55 floors and comprise 6970
apartments, 70,000 sqm of retail and leisure and 5 parking levels.

Although JBR was not designed with an automated waste system in its concept, Envac presence in UAE in
2003 around the time construction started saw the developer very keen to incorporate the systems which
can be deemed as a retrofit since we had to design the systems keeping in mind the existing spaces
available in the tower cores.

The lack of truck access to the 83 waste rooms in the building meant that traditional bins had to be
wheeled out in the wee hours every morning for collection by over 17 compactor trucks. This would have
been a marathon exercise and the Envac solution was seen as a very viable alternative for the developer.
With over 10 million sqft of liveable area this development generated over 33 tons of waste per day. The
average cost of investment for the developer was around USD 1000 / apartment and the operation cost
about 1/5th that of traditional waste collection.

The system spans the 1.7 km long development with over 6km of pipes interconnecting 83 waste rooms to
2 collection stations. 66 inlets connect 40 towers and 17 inlets are spread across the retail area. Due to the
high load of the restaurants and retail area Envac has provided over 4 screw tank feeder inlets exclusively
as a retrofit after 3 years of operation.

Today JBR has fulfilled its name as a destination of living a “lifestyle of a lifetime” in a very short period of
time making it as a desired place to live in. The destination with its plethora of beach side restaurants,
cafes and high end shopping district is bustling with activity every night. Needless to say the JBR is a
flagship project for Envac in the region of Middle East and prospective clients and visitors are spell bound
when they see the system in operation.

Project Start Up 2005


Project Completion 2007
System Type Stationary Systems – SVS 500
No of Systems 2
No of Inlets 86
No of Fraction 1
Length of Pipe 5690 RM
Tons per Day 33 Tons / Day
Project Profile – Middle East Region Page 2 of 20
TIARA RESIDENCE, PALM JUMEIRAH, DUBAI UAE

Tiara Residences, a high end luxury seaside development on the iconic Palm Jumeirah greets
visitors as they drive through the trunk of the island development built on the Persian Gulf. Its
location on the pristine landscaped grounds of the Palm Jumeirah delivers unparalleled quality of
natural living, exclusivity, seclusion and surrounded by refinement and outstanding beauty.

9 residential towers and a hotel resort, spa are set within landscaped tropical gardens, infinity
pool overlooking its own pristine beach.

This sublime gated community with over 375,000 Sqft offers residential living resort style with all
managed amenities, restaurants, bars, gym, the world renowned Anantara Spa with its well-
known Asian hospitality.

The towers are connected at basement level with 400mm pipe systems transporting the solid
waste disposed by residents to a collection centre below the hotel. The systems have a holding
capacity sufficient to store over two – three days of waste generation and thus has lowered
operational cost in waste handling. This offers residents better value for money and a nice clean
development devoid of smelly waste rooms and noisy trucks.

Project Start Up 2007


Project Completion 2009
System Type Stationary Systems – SVS 400
No of Systems 1
No of Inlets 9
No of Fraction 1
Length of Pipe 900 RM
Tons per Day 3 Tons / Day

Project Profile – Middle East Region Page 3 of 20


OCEANA MOVENPICK HOTEL & RESIDENCES, PALM JUMEIRAH, DUBAI UAE

The Movenpick Hotel and Spa and Oceana Residences are a mirror image to the Tiara Residences
opposite each other and a high end luxury seaside development on the iconic Palm Jumeirah. Its
location on the pristine landscaped grounds of the Palm Jumeirah delivers unparalleled quality of
natural living, exclusivity, seclusion and surrounded by refinement and outstanding beauty. Its
offers panoramic views of the skyline of Dubai Marina like no other residential development can.

9 residential towers and a hotel resort, spa are set within landscaped tropical gardens, a lazy river
water feature meandering across its podium ending in an infinity pool overlooking its own pristine
beach. It comprises 644 apartments, 137 serviced residences, and a 187 room five star hotel.

This sublime gated community offers residential living resort style with amenities, restaurants,
bars, gym, managed by the world renowned Movenpick Hotel Chain famous for its Swiss
hospitality. The towers are connected at basement level with 400mm pipe systems transporting
the solid waste disposed by residents to a collection centre below the hotel. The systems have a
holding capacity sufficient to store over two – three days of waste generation and thus has
lowered operational cost in waste handling. This offers residents better value for money and a
nice clean development devoid of smelly waste rooms and noisy trucks.

Project Start Up 2008


Project Completion 2010
System Type Stationary Systems – SVS 400
No of Systems 1
No of Inlets 9
No of Fraction 1
Length of Pipe 900 RM
Tons per Day 4 Tons / Day

Project Profile – Middle East Region Page 4 of 20


PALM MARINA APARTMENTS, PALM JUMEIRAH , DUBAI UAE

Located at the centre of the trunk of the iconic Palm Jumeirah the Pam Marina overlooks the Tiara
Residences and the Oceana Residences on either sides. The only residential development on the
Palm Marina with its own boat marina this development offers 6 towers 14 floors high with high
end opulent living. The sea level offers townhouses and villas for the discerning few owners in
distinctive Arabian style design yet with trappings of the glamorous French Riviera or
Mediterranean Coast.

480 high end apartments are connected to two independent systems each spanning three towers
as they face each other on opposite sides of the road.

The towers are connected at basement level and move the waste to the centralised waste room
at the ground floor for easy access to trucks which come once every three days for collection.

This design and build project was executed under the Japanese Contractor Shimzu and the Envac
team worked with sophisticated 3-D software in coordinating all services much prior to the actual
installation thus identifying all bottleneck and potential clashes well in advance.

Project Start Up 2007


Project Completion 2010
System Type Stationary Systems – SVS 400
No of Systems 2
No of Inlets 6
No of Fraction 1
Length of Pipe 880 RM
Tons per Day 8 Tons / Day

Project Profile – Middle East Region Page 5 of 20


IBN BATTUTA – SERVICED APARTMENT & HOTEL, JEBEL ALI, DUBAI UAE

The project is larger than the Arc de Triumpe in Paris. The Ibn Battuta Gate’s iconic entrance
greets visitors as the enter the Emirate of Dubai from Abu Dhabi and is a unique complex of over
400,000 Sqft of residential, services apartment, hotel and offices.

The two wings one commercial offices and one a five star hotel managed by the Movenpick Hotels
and Resorts. Envac’s solution is for the Movenpick Hotel alone and a system caters to the 150
room hotel and serviced apartment block and offers a clean and sound solution to modern day
waste management

Ibn Battuta Gate is a threshold to a lifestyle that balances city and retreat excitement and
relaxation, business and pleasure. Here, all enjoy exquisite hospitality and amenities provided by
the renowned upscale Swiss Hotel chain of Movenpick.

Project Start Up 2009


Project Completion 2010
System Type Stationary Systems – SVS 400
No of Systems 1
No of Inlets 2
No of Fraction 1
Length of Pipe 250 RM
Tons per Day 20 Tons / Day

Project Profile – Middle East Region Page 6 of 20


THE PEARL, DOHA QATAR

The Pearl, Qatar is Qatar first free hold real estate development built on reclaimed land and sits on the
shores of the Persian Gulf. The mixed use development under construction is designed to accommodate
approximately 13,150 tenements or a resident population of 42,000 personnel and additionally about
300,000 people are expected to visit annually. Commercial area spreads across 119,000 Sqm a 900 room
hotel and over 309,000 sqm of retail amenities.

The entire development is spread across various zones which are classified based on the types of use and
residential layouts. In order to satisfy the demand of dwellings and provide the associated facilities, the
project is designed to have residential apartments, hotels, villas and theme based residential zones, retail
shops, restaurants, large service areas, public amenities, and car parking space. In addition plans are afoot
to accommodate a water based theme park,

The system covers towers with chutes, groups of independent villas are provided with outdoor inlets. The
retail areas along the waterfront promenade are also located with inlets which cater to the retail and the
marinas. This contract also covers Operating and Maintenance for a period of 7 years and handles day to
day operations, waste haulage, spares and consumables.

Project Duration 2007 – 2014


O&M 7 years
System Type Stationary Systems – SVS 500 – Residential / Mixed Use / Hotel / Offices etc
No of Systems 4
No of Inlets 400++
Length of Pipe 65, 000 + RM
Tons per Day 135 Tons / Day

Project Profile – Middle East Region Page 7 of 20


THE MAZE, AL ROSTAMANI GROUP, SHK ZAYED ROAD, DUBAI UAE

The latest high rise development along the


iconic Sheikh Zayed road adjacent the DIFC
opted for the Envac system as it brought great
value and moved the waste from its ground
floor lobby to the adjacent car park building at
the rear.

The 55 storeyed commercial and residential


developments by the premier group had a
very small footprint and the client desired a
solution to move the waste from this location
to a location in the rear car park and Our
solution was fit for purpose and ideal and a
value for money proposition.

The Envac system is located in the adjacent


car parking building and solves the problem of
getting rid of the waste without affecting the
3-storey high glass entrance area starting on
the ground floor. It is a simple solution to an
otherwise complex problem in a congested
city area.

Project Start 2008


Project Completion 2011
System Type Stationary Systems – SVS 400 – Mixed Residential / Offices etc
No of Systems 1
No of Inlets 1
Length of Pipe 100 RM
Tons per Day 3 Tons / Day

Project Profile – Middle East Region Page 8 of 20


YAS ISLAND – F1 RACE TRACK, FERRARI WORLD, VILLAS, ABU DHABI, UAE

The Yas Island development was iconic and important for the Middle East region especially UAE as
they bought in the Formula 1 racing circuit calendar to the Middle East. The penultimate race of
the calendar year is held here in Abu Dhabi every November.

The Yas Island circuit is a destination by itself revolving around the F1 concept and has a yachting
marina, many five star hotels, a golf course and club house and the famed Ferrari World Theme
park which boasts the fastest roller coaster in the world.

Envac has provided two systems one catering to the F1 circuit and race track, hotels and marina
and another for the Ferrari World experience and Golf club.

Over 17km of piping links 40 sets of outdoor inlets and collects two fractions of waste namely the
organic and mixed recyclables.

Envac also was involved in the construction of the collection station terminal building. Phase 1
involved the race Track and was installed and commissioned in 1 year and was ready for the
opening on Nov 2009.

Project Start 2008


Project Completion 2010
System Type Stationary Systems – SVS 500
No of Systems 2 - Mixed Recyclables / Organic Waste
No of Fractions 2
No of Inlets 40
Length of Pipe 17,000 + RM
Tons per Day 30 Tons / Day

Project Profile – Middle East Region Page 9 of 20


LATIFA TOWER, SHEIKH ZAYED ROAD, DUBAI UAE

Iconic high rise tower along Sheik


Zayed Road in the centre of Dubai
for His Highness Sheikh Rashid Bin
Khalifa Bin Saeed Al Maktoum

This landmark twin tower on


Sheikh Zayed Road opposite the
Emirates Towers house premium
residential accommodation in one
tower and commercial offices in
the other as well as residences in
the upper floors. The ground floor
will house retail and building
owners offices.

The value of Envac was quickly


realised by the Architect and
Owner as we could move the
waste away from the ground floor
of the building to the rear car park
building. The pipe runs
underground in a trench and
moves the waste thus releasing
valuable real estate place below
the tower for revenue generating
use.

The container is a combined


compactor and storage unit the
first of its kind installed in the
Middle East.

Project Start 2009


Project Completion 2011
System Type Stationary Systems – SVS 500 – G System
No of Systems 1
No of Inlets 5
Length of Pipe 500 RM
Tons per Day 4 Tons / Day

Project Profile – Middle East Region Page 10 of 20


MARINA 101, DUBAI MARINA, DUBAI UAE

Marina 101 is an iconic structure that will stand tall on Dubai’s skyline. Destined to become the
world’s tallest hotel and furnished apartments. The Marina 101 is the Sheffield Group’s flagship
brand and is designed to meet sky- high expectations of an elite group of clientele. This 101 storey
high building located in “new Dubai” also called the tallest block on the planet. It houses 40
stories as a hotel managed by the Crowne Plaza Group and has residential accommodation spread
across the other floors.

To be developed at an investment of over AED 1.2 billion, in association with EMAAR, and rises
412 metres and covers an area of approximately 1.65 million square feet. Strategically located in
the prestigious Dubai Marina, Marina 101 offers elegantly styled 252 One Bedroom, 204 Two
Bedroom and 42 Three Bedroom apartments crowned with 8 luxury duplex penthouses.

Resting on 7 level podium car park level the building generates 3- 4 tons of waste per day.

The value seen by the architect and client was immediate as only Envac was capable of moving
the waste without manual interference by 50m which was required to move the waste from the
middle of the plot to the car park adjacent to the road for trucks to access. Moving the waste
room released the space in the ground floor which allowed for the space previously allocated to
the waste room to be a spacious lobby restaurant and part of public spaces for the hotel.

Project Start 2009


Project Completion 2013
System Type Stationary Systems – SVS 500 – C System
No of Systems 1
No of Inlets 1
Length of Pipe 45 RM
Tons per Day 4 Tons / Day

Project Profile – Middle East Region Page 11 of 20


JUBAIL MARKET, SHARJAH PWD, SHARJAH CORNICHE, UAE

A new market facility in Sharjah comprising of 403 stalls for Fish, Meat & Vegetable Market under
one roof. The fish and meat market will cater as the main retail market for the Emirate. The
project is expected to generate approximately 30-40 tons of waste per day from residual and left
over of the waste.

The system is divided into two one catering to the vegetable market and one to the Fish and Meat
Market. The Fish and Meat market have specialised baggage carousel inlets which can cater to
peak load disposal. The fish cleaning areas have screw feeders located inside their rooms to
dispose the waste generated in these areas. The waste from Fish and Meat will be disposed in
their own system to an incineration plant. The waste rooms in the vegetable areas are installed
with baggage carousel.

The project will handle close to 55 tons of waste per day when finally complete. Many local
municipalities are watching closely on this project and we feel this will open up new avenues for
Envac in the local market.

Project Start 2010


Project Completion 2013
System Type Kitchen Waste Systems – 200 & 300
No of Systems 2 Incinerable / Organic
No of Inlets 14
Length of Pipe 1415 RM
Tons per Day 55 Tons / Day

Project Profile – Middle East Region Page 12 of 20


OBEROI FLIGHT KITCHEN, NEW DELHI INTERNATIONAL AIRPORT, NEW DELHI INDIA

The Oberoi Flight Kitchen India premier flight catering and hotel operator was also managing the
New Doha International Airport – Qatar Airways Flight Kitchen under a management contract. A
chance introduction to the Envac facilities there excited the owner to the benefits and there was
no looking back. An initial order to their 15,000 meals a day facility in Mauritius was followed with
this order for Phase 1 in New Delhi for a system to cater to a meal production of 15,000 meals a
day.

With the opening of the New Delhi Indira Gandhi International Airport Terminal 3 the facilities of
the flight catering units were being revamped. The state of the art facility is the most modern
flight catering facility in India installed with an Envac Automated waste system which will collect
waste from ware wash, dish wash and food preparation areas as well.

The system is fully equipped with Trash chute in Benches, Trash Chutes located in the food prep
areas, customs bonded warehouse and the conveyor systems receiving the food trays from the
aircraft. The system is designed for 20 tons a day and will be expanded from 15,000 meals to
30,000 trays in the next two years.

Project Start 2011


Project Completion 2012
System Type Kitchen Waste Systems – 200 & 300
No of Systems 1
No of Inlets 5
Length of Pipe 250 RM
Tons per Day 20 Tons / Day
Project Profile – Middle East Region Page 13 of 20
NEW DOHA INTERNATIONAL AIRPORT, DOHA, QATAR

Qatar Flight Catering Company – Contract 1

The New Doha International Airport when complete in 2015 will be designed to handle 50 million
passengers per annum. To cater to this growing demand Qatar Airways Flight Catering Co engaged
Envac to provide its bespoke solution.

New Doha International Airport, Terminal Buildings – Contract 2 & 3

The New Doha International Airport is a green field airport under construction in Doha and when
ready in 2012 (phase 1) and 2015 (phase 2) will cater to 50 Million passengers becoming a major
hub for the Middle East and Europe.

During the finalisation of the airport design the designers were impressed with the solutions
which Envac could offer to manage the waste from the terminal complex and food courts along
the concourse.

Envac has three projects in the airport complex one exclusive for the Qatar Flight Catering
Company processing meals for the aircrafts and handling the waste from the return of trays. Two
more systems cater to the terminal building complex known as CP18 Phase 1 and CP51 (Phase 2)
which are handled and managed by Parsons – Besix-Midmac JV (CP51) and Bechtel-Sky Oryx JV
(CP18).

The Phase 1 handles 50 tons of waste and has baggage carousels, trash chutes and screw feeders
located at BOH areas catering to the waste generated on the concourse from restaurant, food
courts and litter.

Phase 2 handles 75 tons of waste from the new terminal under construction and installed with
baggage carousels, trash chutes and trash chutes in bench and handles waste from the concourse
as well.

Project Start 2009


Project Completion 2014
Project Profile – Middle East Region Page 14 of 20
MSHEIREB PROPERTIES – HEART OF DOHA, Doha, QATAR

The Msheireb - Heart of Doha project is designed to accommodate an estimated population mix
comprising 2,226 residents, 2,930 retail employees, 12,286 offices employees within an area of
303,243 sqm of residential floor space, 253,906 sqm of commercial area and 151,611 sqm of hotel
and amenities areas.

As each occupier and transient equivalent will generate various types of waste, it is designed to
segregate and collect waste in three fractions; comprising of organic, residual, and recyclable
refuse. The segregated waste streams will be separately collected and transported to a waste
collection facility, via a unique horizontal vacuum pipe network system.

In order to keep the waste fractions separated, each waste type must be sorted correctly when it
is disposed into the system from source, therefore in each outdoor location there will three
separate inlets that will allow the occupant and transient to dispose into the correct waste type
inlet.

The installation of the Automated Waste Collection System is expected to handle about 184.12
m3 per day or 27.618 T/day with a specific weight of 150 kg/ m3 for residual waste, 100 kg/ m3
for recyclable and 250 waste density for organic/wet fraction. This volume of waste will be
generated by 2,226 inhabitants and 405,517 m2 of commercial areas including retail shops,
restaurants, public areas, hotels, offices, and school.

Due to size of the project and the constraints in handling the waste both in terms of volumes,
distances and number of inlets, One (1) Automated Collection Stations is proposed with 3 waste
container in order to have enough capacity to accumulate one day waste generated in all phases.
3 additional containers have been provided one for each fraction.

Envac ME won this tender which was a global bid against our competitors from Europe, Asia and
Korea.

Project Profile – Middle East Region Page 15 of 20


This project is unique as this will be the first project in the ME with a access card readers,
weighing mechanism incorporated in the inlet doors which will weigh and dispose the waste and
also have a record of all users

Mohammed Al-Marri, Projects Director of Msheireb Properties said, “The Gulf’s remarkable
growth story has also affected the environment to a degree, which is why offsetting the impact of
any development is at the heart of Msheireb Properties’ vision. With this system from ENVAC,
combined with an education campaign for all residents, we can ensure Msheireb Downtown is at
the forefront of the world’s ‘Green cities’ movement.”

“That aspect of education is critical to getting the most out of this system. Recycling, however, still
isn’t necessarily upper-most in people’s minds, which is why we in partnership with ENVAC are also
putting together a program which will put in place workshops on how to use ENVAC, as well as
organizing visits to the collection centre to see how the waste is collected and segregated.

“We are confident that through education programs such as these, future residents of Msheireb
Downtown will make the neighbourhood’s green credentials a real point of pride.”

Project Start 2011


Project Completion 2017
System Type Stationary Waste Systems – SVS 500
No of Fractions 3 – Mixed Recyclables / Residual / Organic
No of Systems 1
No of Inlets 263
Length of Pipe 6000 RM
Tons per Day 25 Tons / Day

Special Issues Card Readers / Weighing Mechanisms / Litter bin Systems for Public Realms
Bin Lifters /
O&M 5 years after completion

Project Profile – Middle East Region Page 16 of 20


KING ABDULLAH FINANCIAL DISTRICT, Riyadh, SAUDI ARABIA

KAFD is designed to become the largest financial centre in the Middle East and the headquarters
of the Capital Market Authority, the Stock Exchange and the Commodity Market and for Financial
Institutions and related service providers.

When complete, KAFD is expected to require 44,000 new office personnel and accommodate
12,000 residents. KAFD will consist of high-rise residential and office towers, residential villas,
retail areas, 6 luxury hotels, community and cultural facilities and a convention & exhibition
centre. When operational the Envac systems will be capable of transporting 145 Tonnes per day of
mixed (wet/organic) waste and in doing so will significantly reduce carbon emissions by the
reduction of on-road waste collection trucks, creating a clean, safe and sustainable development.
The collection station will be the first in which 4 receiving systems are co-located in a single
building.

Project Start 2011


Project Completion 2012
System Type Stationary Waste Systems – SVS 500
No of Systems 4
No of Inlets 130
Length of Pipe 17000 RM
Tons per Day 140 Tons / Day

Project Profile – Middle East Region Page 17 of 20


JABAL OMAR DEVELOPMENT, MAKKAH,SAUDI ARABIA

The Jabal Omar Development is located within the centre of the city of Makkah. The site, which
covers an area of approx. 23 ha area near the courtyard on the western side of The Grand
Mosque, facing the western side of the Haram.

The project involves construction of 37 towers including residential towers, 40 hotels, a retail
concourse, 58,000 square metres prayer areas, a 2,000-seat conference hall, and related facilities.
The project will be implemented in three phases. Phase I will include nine towers with hotels and
residential apartments, phase II includes towers, four hotels and 72 apartments while details of
phase III are yet to be revealed. During the Holy month of Ramadan and Eid’s, occupation rates
increase several hundred percent as does the generation of waste.

The Envac solution consists of 4 independent sets of waste collection plant all co located at 1
collection room and a combination of Envac’s standard waste inlets and our screw tank solution.
The latter increasing each systems temporary storage capability to meet the needs of daily peak
periods.

When operational; the 4 Envac systems will be capable of, temporary storage and automatic
collection and transportation of 110 Tonnes of mixed waste per day, thereby significantly
enhancing the pilgrim experience by making the environment, cleaner, safer, and more
aesthetically pleasing.

Project Start 2011


Project Completion 2014
System Type Stationary Waste Systems – SVS 500
No of Systems 4
No of Inlets 50 Screw Tanks – 3 cum / 5 cum storage
Length of Pipe 6000 RM
Tons per Day 60 Tons / Day (Peak 110 Tons / day)
Project Profile – Middle East Region Page 18 of 20
LE MEREDIAN REDEVELOPMENT, DUBAI

The Le Meridian, Airport at Dubai is the flagship hotel of this Starwood Group Chain in Dubai and
for its new Extension of a 200 room hotel the Project Developers – Dubai Real Estate Corporation
chose the Envac waste technology to collect the organic waste from the Kitchen, Dish wash are
and cart it underground to a dedicated location at the BOH areas.

This is the first 5 star hotel development in the Middle East system to have its own dedicated
automated waste system and hence achieve high hygiene standards and move to a more
technological solution. The shortage of valuable space inside the operational area of the hotel
lead to the client adopting this system over the conventional waste systems.

Project Start 2012


Project Completion 2013
System Type Kitchen Waste System – KWS 400
No of Systems 1
No of Inlets 5
Length of Pipe 200 RM
Tons per Day 2 Tons / Day

Project Profile – Middle East Region Page 19 of 20


Gujarat International Finance-Technology Centre, Ahmedabad, India

Envac was awarded this Mega Township to be built over a period of 10 years in the Western City
of Ahmedabad through a global tender. The Project is spread across 700 acres and a proposed
Finance Hub with residential and retail facilities spread across a waterfront area. The township
will generate 400 tons of waste when ready and waste is segregated in two fractions. The organic
waste will be incinerated and the recyclables will be segregated in a semi-automated segregation
plant. Envac will handover Phase 1 in April 2014 with a facility for 50 tons which will handle 6 tons
of waste initially and slowly ramp up as the development grows.

Envac has imported the Segregation plant from Stadler and this is the first automated segregation
plant in India. The owners ILFS and Gujarat Government are keen to roll out the technology in
numerous cities after the plant is taken into operation,

Project Start 2013


Project Completion 2014
System Type 2 Fraction Stationary System with Segregation Plant
No of Systems 1
No of Inlets 4 – Phase 1
Length of Pipe 1200 RM
Tons per Day 6 Tons / Day – Station Capacity 50 Tons / Day

Project Profile – Middle East Region Page 20 of 20