You are on page 1of 1

SCHEDULE FOR ELECTRICAL POINTS

R
SW12 T4 SW3
SR.NO ELECTRICAL HEIGHT AREA
POINTS FROM FFL
L11
F4 L1 ENTRANCE
L10 SB1
F2 L2
1.37m

L3
GY SW8 L4
SW7 F1
SW6
T- 1, 1.37m STUDY
SW2 T1
SB2 CF- 2 ROOM
L9
L5 L- 2
L1
T- 1, 1.37m STUDY
T3 SW9 SB3
CB CF- 2 ROOM
T2 SW4 SW1 DB
SW5
L- 3 1.37m
SB4 HALL
L7
L6
F3

SB5 CAN BE USED AS 1.37m


HALL
REQUIRED
L8
T- 2,
SW10 SW11
SB6 CF- 1 LIVING AREA
1.50m
L- 4,3
SB7 L- 5 1.37m
LIVING AREA
LEGEND SB8 T- 4, L- 10 1.37m
CF- 4 BEDROOM
FAN T- 3, 1.37m BEDROOM
SB9 CF- 3
TUBELIGHT L- 7,6
L LIGHT
SB10 T- 3, 1.37m KITCHEN
R REFRIGIRATOR CF- 3
GY GEYSER
1.37m KITCHEN
TV SB11 CAN BE USED AS
REQUIRED
D.B STAIRCASE
SUB MAINS FROM DB TO SW SB12 1.37m LANDING
R

FINAL CIRCUITS FROM SW TO APPLIANCES

RENUKA C
2
ELECTRICAL LAYOUT BA20ARC047
BUILDING SERVICES-II