You are on page 1of 1

RCC CRASH

BARRIER

RR Masonary/PCC RR Masonary/PCC
Returns as per site Returns as per site
Requirement Requirement

RCC PRECAST BOX END SEGMENT RCC PRECAST BOX END SEGMENT
RCC SEGMENTAL BOX STRUCTURE DIMENSIONAL DETAILS DIMENSIONAL DETAILS
DIMENSIONAL DETAILS

RCC CRASH BARRIER

END SEGMENT

INTERMEDIATE SEGMENT
HALF TOP PLAN

RCC PRECAST BOX INTERMEDIATE RCC PRECAST BOX INTERMEDIATE RCC PRECAST BOX INTERMEDIATE
SEGMENT DIMENSIONAL DETAILS SEGMENT DIMENSIONAL DETAILS SEGMENT DIMENSIONAL DETAILS
INTERMEDIATE SEGMENT
HALF BOTTOM PLAN

INTERMEDIATE SEGMENT

2.5%

INTERMEDIATE SEGMENT

End Segment Intermediate Segment Intermediate Segment Intermediate Segment Intermediate Segment End Segment

END SEGMENT
FLOW

PROOF CONSULTANT:- CLIENT :- CONSULTANTS :- CONTRACTOR :- HILLWAYS Construction Company Pvt. Ltd.
34,Adarsh Gram, Dehradun Road, RISHIKESH-249 201,
Drawing N. 13
M/s LACS CIVIL SOLUTION,
H.NO.242 Rohit Nagar, Bawadiya Dist:- Dehradun (UttaraKhand) Email:- TITLE :-
Kalan, Bhopal (M.P.)
hillwaysconstruction@gmail.com Precast Box Culvert 4m x 2m ( Typ.)
BORDER ROAD ORGANISATION
Pin Code:- 462026 PROJECT TITLE :- Rehabilitation And Upgradation Of Askot - Lipulekh On EPC Basis For General Arrangement Drawing
(Ministry Of Defense) SUBMITTED BY VERIFIED BY CHECKED BY APPROVED BY Phase-I (Existing KM 72.000 To KM 107.620) (Design Chainage KM 21+330
Email.: lacscivilsolution@gmail.com 1:100
To KM 56+935) Under Project Hirak Of BRO In The State Of Uttarakhand SCALE :-
Tel:- 0755-4900766 CONTRACTOR A.R.E R.E TEAM LEADER Under Bharatmala Pariyojna (Phase-I) On EPC Mode (Length = 36.605 KM).
DATE :- 08.05.2022

You might also like