1.

9 IMPLEMENTATION PLAN
1.9.2 ELECTRO-HYDRAULIC AUTOMATION 4.0

TOTAL
NO DATE DAY MODULE TIME HRS
1 FRIDAY INTRODUCTION INDUSTRY 4.0
Introduction to Hydraulics 2.30PM-6.30PM 4
Hydraulics as drive Technology
2 SATURDAY Physical Principles
8.00AM-6.00PM 10
Hydraulic Fluids
Hydraulic Circuit Systems
3 SUNDAY 8.00AM-6.00PM 10
Hydraulic Valves
4 FRIDAY Project 01: Hydraulic power unit
Project 02: Hydraulic pump/characteristic curve of variable displacement 2.30PM-6.30PM 4
pump
5 SATURDAY Project 03: Single-rod cylinder/pressure intensification
8.00AM-6.00PM 10
Project 04: Single-rod cylinder/flow
6 SUNDAY Project 05: Hydraulic motor
8.00AM-6.00PM 10
Project 06: 4/3 directional valve
07  FRIDAY Project 07: Check valve
2.30PM-6.30PM 4
Project 08: Check valve, pilot operated
 08 SATURDAY Project 09: Throttle valve, adjustable
8.00AM-6.00PM 10
Project 10: Throttle check valve
 09 SUNDAY Project 11: Flow control valve
8.00AM-6.00PM 10
Project 12: Pressure relief valve, direct operated
10  FRIDAY Project 13: Pressure relief valve control
2.30PM-6.30PM 4
Project 14: Pressure reducing valve

TOTAL HOURS 76
1.9 IMPLEMENTATION PLAN
1.9.2 ELECTRO-HYDRAULIC AUTOMATION 4.0

NO DATE DAY MODULE

1 SATURDAY Project 15: Pressure switch


Project 16: Pressure switch/hysteresis
2 SUNDAY Project 17: Hydraulic accumulator
Project 18: Regenerative circuit
Project 19: Rapid speed/creep speed control
Project 20: Valve circulation control
3 FRIDAY
Project 21: Commissioning, inspection, maintenance, troubleshooting,
repair
4 SATURDAY Introduction Manufacturing Execution System (MES)
Emergence of the MES concept
Current standards
Vertical and horizontal integration
Understand our machine & process capabilities
Overall Equipment Effectiveness (OEE)
Method of improvement activities
5 SUNDAY
Theory & Practical Assessment
TOTAL
TIME
HRS

8.00AM-6.00PM 10

8.00AM-6.00PM 10

2.30PM-6.30PM 4

8.00AM-6.00PM 10

8.00AM-6.00PM 10

TOTAL HOURS 44
WEEK 1 76
WEEK 2 44
TOTAL 120