You are on page 1of 16

SANITARY

Project of the New International Airport of CALCULATION REPORT


Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

CONSTRUCTION OF TEMPORARY OFFICE


SANITARY CALCULATION REPORT – STORM DRAINAGE
----------------------------------------------------------
AICC-14-CNCH-PK010-P-MEC-00005-00C

Prepared by (full name)


Rev Date Modification Tracking Position

A 05/28/22 Issued for Approval

B. 05/07/22 Issued for Approval

C 05/08/22 Issued for Approval

Prepared by reviewed by

Full name: Yuri caceres Jose Goytizolo B.

Position: Sanitary Engineer Project Manager

Date: 08/05/2022 04/13/2022

Signature/Initial:
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

Table of Contents

1. INTRODUCTION ........................................................................................................................................ 3

1.1. GOAL ............................................................................................................................................................ 3

TWO. DESIGN BACKGROUND .......................................................................................................................... 3

2.1. REGULATIONS / RULES .......................................................................................................................... 3

3. CALCULATION BASIS ............................................................................................................................. 3

3.1.1. ESTIMATION OF THE RETURN PERIOD IN YEARS ........................................................................ 3

3.1.2. ESTIMATION OF THE RUNOFF COEFFICIENT ................................................................................ 3

3.1.3. ESTIMATION OF CONCENTRATION TIME ....................................................................................... 3

3.1.4. ESTIMATION OF RAINFALL INTENSITY ........................................................................................... 4

3.1.5. ESTIMATION OF THE MAXIMUM PRECIPITATION IN 24 HOURS ............................................. 6

3.2. SIZING OF STORM DRAINAGE CHANNELS ...................................................................................... 8

3.2.1. PROVISIONAL OFFICE BUILDING ....................................................................................................... 8

3.3. ROOF RAIN DRAINAGE COLLECTION NETWORK ...................................................................... 15

3.4. SIZING OF STORM DRAIN PIPES ....................................................................................................... 15

3.4.1. PROVISIONAL OFFICE BUILDING ..................................................................................................... 16

FOUR. CONCLUSIONS ......................................................................................................................................... 16

AICC-14-CNCH-PK010-P-MEC-00005-00C | page2of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

1. INTRODUCTION
This calculation report develops the analysis and design of the pluvial drainage system for the project called
“02 Level Office Construction” of Cusco International Airport (AICC).
1.1. GOAL
- Calculate the dimensions of the gutter and the diameter of the storm drainage networks.

2. DESIGN BACKGROUND

2.1. REGULATIONS / RULES


The following regulations and/or standards are considered:
 CE.040 Urban storm drainage.
3. CALCULATION BASIS

The calculation of the storm drainage system for this building is carried out according to the provisions
of RNE CE.040 Urban Storm Drainage, IILA – SENAMHI – MODIFIED UNI method.
3.1.1. ESTIMATION OF THE RETURN PERIOD IN YEARS
The return period is the average time in years, in which the value of the peak flow or precipitation, is
equaled or exceeded once every "t" years. Due to the scope of this project and based on the terms of
reference of the project, a flood of 100 years of return period is recommended.
3.1.2. ESTIMATION OF THE RUNOFF COEFFICIENT
The runoff coefficient is estimated according to parameters provided by the CE.040 Urban Storm
Drainage standard, as shown below:

For a return period of 100 years and considering that the surface is a ceiling, the value of 0.97 is adopted
as the runoff coefficient.

3.1.3. ESTIMATION OF CONCENTRATION TIME


For the estimation of the concentration time, table 2 Summary of the concentration time equations will
be used, according to the RNE, CE.040 URBAN RAINFALL DRAINAGE.

AICC-14-CNCH-PK010-P-MEC-00005-00C | page3of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

The total length of the surface flow from the furthest point of the drainage area to the discharge point
is taken into account through the pluvial drainage pillar according to its location on the plans, and the
slope of the coverage.

runoff coefficient C= 0.97


surface flow length L= 16.00 m
surface slope S= 0.15 m/m

concentration time T= 0.69 hours

3.1.4. ESTIMATION OF RAINFALL INTENSITY


Formula IILA - SENAMHI - UNI Modified is used, as indicated by the RNE.

AICC-14-CNCH-PK010-P-MEC-00005-00C | page4of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

According to figure 01 pluviometric zones and subzones indicated in the national building regulations
of the "Study of the hydrology of Peru - Annexes", the project is located in ZONE 123 AND
SUBZONE123

Source: IILA-SENAMHI-UNI (1983), "Study of the hydrology of Peru - Annexes", Agreement


of Technical Cooperation of the Italo-Latin American Institute, National Service of
Meteorology and Hydrology and National University of Engineering, March 1983, Rome-Italy

Next, the initial calculation parameters are estimated:

Parameter to determine P24T Eg= 24


b= 0.40
return time T= 100
Duration of daily rain tg= 15.6
Duration parameter (dimensionless) n 0.35

frequency parameter Kg= 0.55

Intensity parameter (mm) a= 11.00

Replacing the initial design parameters in the MODIFIED IILA-SENAMHI-UNI formula, the rain
intensity value is estimated in mm/hour, as shown below:

AICC-14-CNCH-PK010-P-MEC-00005-00C | page5of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

Parameter to determine P24T Eg= 24


b= 0.40
return time T= 100
Duration of daily rain tg= 15.6
Duration parameter (dimensionless) n 0.35

frequency parameter Kg= 0.55

Intensity parameter (mm) a= 11.00


concentration time T = 0.69 hours

Rain intensity in mm/h I= 21.93mm/hour

3.1.5. ESTIMATION OF THE MAXIMUM PRECIPITATION IN 24 HOURS


The maximum precipitation in 24 hours for a return period of 100 years is carried out according to
the IILA-SENAMHI-UNI formula, as indicated by the national building regulations.

Parameter to determine P24T Eg= 24


return time T= 100 years
frequency parameter Kg= 0.55

Maximum precipitation in 24 hours P24,T= 50.54 mm/day

The hydrological stations of URUBAMBA, ANTA ANCACHURO and CHITAPAMPA are located
in the project area, which recorded a maximum rainfall of 54.30 mm/day in 2011, the value obtained
by the IILA SENAMHI method is approximate to the value recorded in the hydrological station

AICC-14-CNCH-PK010-P-MEC-00005-00C | page6of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

ANTA
YEAR URUBAMBA CHITAPAMPA
ANCACHURO
1975 44.00 29.50
1976 26.00 30.10
1977 33.00 24.50
1978 40.00 45.60
1979 25.00 47.00
1980 38.00 41.00
1981 39.50 43.00
1982 43.00
1983 28.00
1984 31.00
1985 30.80 26.00
1986 26.40 37.00
1987 34.40 26.00
1988 29.00 35.00
1989 19.40 40.00
1990 21.80 45.50
1991 17.20 28.50
1992 18.40 31.00
1993 34.00
1994 29.00
nineteen
18.20 22.50
ninety five
nineteen
22.00 23.00
ninety six
1997 24.20 37.00
1998 14.70 31.00
1999 28.10 29.00
2000 30.00
2001 35.50
2002 27.60 29.60
2003 22.40 33.90
2004 18.40 23.20
2005 19.50 22.90
2006 28.50 36.00
2007 18.60 36.80
2008 24.60 30.10
2009 29.80 40.10
2010 26.10 49.60
2011 21.10 54.30
2012 21.60 28.40
2013 33.40 35.70
2014 32.70 35.60
2015 23.40 30.30
2016 26.00 41.70
2017 18.20 36.20
2018 27.50 27.40
2019 42.30 32.00
2020 23.20 31.70

AICC-14-CNCH-PK010-P-MEC-00005-00C | page7of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

2021 19.90 33.10


MAX 42.30 54.30 47.00
3.2. SIZING OF STORM DRAINAGE CHANNELS

To size the gutters, we first proceeded to determine the areas of influence of the roofs of the different
buildings, taking as a reference that gutters will be used approximately every 15 m; the area of influence
will be the most unfavorable, based on this the width and depth of the gutters are determined.

Using the rational method according to the CE.040 Standard, the maximum flows in each drainage area
are determined, as indicated by the following formula.

3.2.1. PROVISIONAL OFFICE BUILDING


The approximate area of the roof of the Building is approximately 920 m2, which is divided into 14
areas of influence according to Image No. 5:
IMAGE N°5: ROOF INFLUENCE AREA

AICC-14-CNCH-PK010-P-MEC-00005-00C | page8of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

After determining the area of influence of the platform, the flow rate that will pass through each gutter
was determined.
TABLE N°1: DETERMINATION OF RAINFALL DRAINAGE FLOW

Partial runoff Partial


gutter Surface
area(m2) coefficient Flow(l/s)
S1 ceiling 57.47 Coverage 0.97 0.340
S2 ceiling 69.63 Coverage 0.97 0.412
S3 ceiling 66.11 Coverage 0.97 0.391
S4 ceiling 53.50 Coverage 0.97 0.316
S5 ceiling 63.15 Coverage 0.97 0.374
S6 ceiling 61.85 Coverage 0.97 0.366
S7 ceiling 68.10 Coverage 0.97 0.403
S8 ceiling 57.47 Coverage 0.97 0.340
S9 roof 69.63 Coverage 0.97 0.412
S10 ceiling 66.11 Coverage 0.97 0.391
S11 ceiling 53.50 Coverage 0.97 0.316
S12 ceiling 63.15 Coverage 0.97 0.374
S13 ceiling 61.85 Coverage 0.97 0.366
S14 ceiling 58.10 Coverage 0.97 0.344

Based on the drainage area with the largest area (roof S2), with an area of 69.63 m2, the H-Channels
program is used to calculate the initial width and height of the projected gutter. It is worth mentioning
that to perform the hydraulic calculation, the commercial dimensions of prefabricated metal gutters are
taken into account, as shown below.

AICC-14-CNCH-PK010-P-MEC-00005-00C | page9of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

FOR CEILING S1

FOR CEILING S2

AICC-14-CNCH-PK010-P-MEC-00005-00C | page10of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

FOR CEILING S3

FOR CEILING S4

FOR CEILING S5

AICC-14-CNCH-PK010-P-MEC-00005-00C | page11of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

FOR CEILING S6

FOR CEILING S7

FOR CEILING S8

AICC-14-CNCH-PK010-P-MEC-00005-00C | page12of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

FOR CEILING S9

FOR CEILING S10

FOR CEILING S11

AICC-14-CNCH-PK010-P-MEC-00005-00C | page13of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

FOR CEILING S12

FOR CEILING S13

FOR CEILING S14

AICC-14-CNCH-PK010-P-MEC-00005-00C | page14of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

For commercial gutter widths of 190 mm, it corresponds to braces according to the following table:
Partial Partial H
gutter Hmin(mm)
area(m2) Flow(l/s) project(mm)
S1 ceiling 57.47 0.340 7.40 100.00
S2 ceiling 69.63 0.412 8.30 100.00
S3 ceiling 66.11 0.391 8.10 100.00
S4 ceiling 53.50 0.316 7.10 100.00
S5 ceiling 63.15 0.374 7.80 100.00
S6 ceiling 61.85 0.366 7.80 100.00
S7 ceiling 68.10 0.403 8.20 100.00
S8 ceiling 57.47 0.340 7.40 100.00
S9 roof 69.63 0.412 8.30 100.00
S10 ceiling 66.11 0.391 8.10 100.00
S11 ceiling 53.50 0.316 7.10 100.00
S12 ceiling 63.15 0.374 7.80 100.00
S13 ceiling 61.85 0.366 7.80 100.00
S14 ceiling 58.10 0.344 7.40 100.00
As can be seen in the table above, the minimum height for the largest drainage area (Roof S2) is 8.30
mm, so it is proposed to consider a gutter height of 100 mm as it is commercial in the market.

3.3. ROOF RAIN DRAINAGE COLLECTION NETWORK

The storm drainage system on the roof basically works by gravity. To this end, gutters have been
designed with storm drains distributed according to the tributary area, with a minimum projected slope
of 1.0% for the gutter in order to allow the discharge of storm drainage to the existing platform, as
indicated in the national regulation of buildings CE.040.

3.4. SIZING OF STORM DRAIN PIPES

AICC-14-CNCH-PK010-P-MEC-00005-00C | page15of16
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO

To size the diameter of the pipes, the contributing flow of each roof in each area is known, based on
the storm drainage flow, the H-Canales program is used to calculate the diameter of the storm drainage
pipe.

3.4.1. PROVISIONAL OFFICE BUILDING


The highest flow contributing to the ceiling of sector 02 is known to be 0.412 lt/sec. Depending on the
storm drainage flow for approximately 70 m2, the H-Canales program is used to calculate the diameter
of the storm drainage pipe.

For a 3” pipe diameter with an internal diameter of 76 mm, a water depth of 21.5 mm corresponds,
which represents a water depth of 28% of the diameter of the pipe.

4. CONCLUSIONS

 For buildings, the following storm drainage system is generally required:


o Metal gutters of 0.19m width and minimum height of 0.10m, the slope of the gutter will be
1.00%.
o The pluvial drainage discharge pipe of each gutter will be 3” in diameter and will evacuate to
the platform.

END OF DOCUMENT

AICC-14-CNCH-PK010-P-MEC-00005-00C | page16of16