4 Check for any flash over marks under FOB/ROB.
5 Check the availability of earth pit and bond to FOB upright and
to rail.
6 Danger boards to be checked at FOB.
BRIDGES
1 At all bridges check availability of ‘U’ bonds between main rail
and check rail at both ends.
2 Check availability of IR bonds at every 100m.
3 Check availability of bonds between Rail to girder and girder to
girder.
4 Check availability of earth electrodes at both ends of the bridge
and connection between rail and earth electrodes.
5 Check and ensure that no bond on the bridge shall be raised
condition , to prevent hitting moving trains.
6 Check availability of IR bond at both ends of the bridge.
MOVEMENT OF ATD

S.NO LOC MOVEMENT REMARKS


FREE RIGID

NOTE: Foot patrolling report is to be submitted by the lineman on the same day and same has
to be scrutinized by the supervisor with signature on same day.
Total location in beat……… ……Total found good……….Total found defective……………….