The document provides an estimate of materials for the TB. Lotus 2207 ship. It lists two items: (1) piping work for the cooling of the right gear box, including 30 meters of pipe, 10 elbows, 20 flanges, and 2 gate valves; (2) piping work for the cooling of the left gear box, with the same quantities and components. The document appears to be an estimate from PT. Gamatara Trans Ocean Shipyard for fabrication materials.
The document provides an estimate of materials for the TB. Lotus 2207 ship. It lists two items: (1) piping work for the cooling of the right gear box, including 30 meters of pipe, 10 elbows, 20 flanges, and 2 gate valves; (2) piping work for the cooling of the left gear box, with the same quantities and components. The document appears to be an estimate from PT. Gamatara Trans Ocean Shipyard for fabrication materials.
The document provides an estimate of materials for the TB. Lotus 2207 ship. It lists two items: (1) piping work for the cooling of the right gear box, including 30 meters of pipe, 10 elbows, 20 flanges, and 2 gate valves; (2) piping work for the cooling of the left gear box, with the same quantities and components. The document appears to be an estimate from PT. Gamatara Trans Ocean Shipyard for fabrication materials.
Jl Raya Tanjung Tengah No. 1B Pelabuhan Cirebon 45112 - Jawa Barat Telp. (0231) 226435 Fax. (0231) 226436
ESTIMASI MATERIAL TB. LOTUS 2207
URAIAN PEKERJAAN TOTAL NO Panjang Lebar Tebal Jumlah Steel Work x x x Volume ( mm ) (mm) (mm) (pcs) 1 Pekerjaan Pipa Pendingin Gear Box Kanan Pipa SCH 80 1 1/2" 6000 x 5 30,00 meter elbow 1 1/2" 10,00 pcs Flange 1 1/2" 20,00 pcs Gate Valve 1 1/2" 5K 2,00 pcs