You are on page 1of 1

Project area Kunzila town

Kunzila town water supply system is supplied with one bore hole which is located at a distance
about 1.3 km, north from the center of the town. The source was constructed in 1987 by the
financial support of the government, as the first water supply source. Previously the bore hole
has yielding 4 l/s. the base population of Kunzila town is 6,773.

Based on the above data design

1. Population projection
2. Demand assessment
3. Reservoir capacity
4. Select pipe size and distribution network
5. Design pump head and power

Submission date 20/5/2015 E.C

You might also like