CONTENTS
1. About us
4. Structure of organization
5. Project Description
5.1 Effluent Treatment Plant (Annexure -1)
5.2 Space proposal
7. Financial Analysis
9. Detail Drawings
Prosses Flow Chart (D/No - BI-SIE-STP-PFC-001)
Piping Schematic (D/No - BI-SIE-ETP-SP-001)
Layout Plan (D/No - BI-SIE-STP-PSC-001)
Office Building Layout (D/No - BI-SIE-STP-CD-001)
Chemical Stores Drawing (D/No - BI-SIE-STP-CD-002)
Mechanical Work Shop (D/No - BI-SIE-STP-CD-003)
Page 4 z 15
1. About us
BAADER INVESTMENT
Baader Investment group is a private companies involved in Water Treatment Sector, Real Estate
Development and in New Projects Development and Investment for new business opportunities.
Baader has requisite workforce with resourceful to cater to the needs of the industry we serve as
per client's satisfaction. All our staffs are well qualified and highly experienced in providing
respective services across Industries and Sectors.
The company activity comprises the design, construction, Operation & maintenance, supply of
equipment’s & chemicals for private and public sector. Baader Biotech is committed in providing
the best-in-class customer service through quick response, faster shipping with unmatched
Industry knowledge.
2.1 Mission
To serve the society by converting waste water into environment friendly products.
Integrity Respect Achieving excellence, Team work.
2.2 Vison
To be recognized in Oman as the premier water & waste water recycling specialist,
providing customer focused solutions to safely achieve environmental commitments.
Page 5 z 15
4. Structure of organization
5.Project Description
We offer technically advanced compact effluent treatment systems that benefits its user in
the form of sustainable performance at economical capital & running cost.
Page 6 z 15
6. Project Work Plan
Plot
Site Entry drive, gate/gate house, fencing, truck court for trucks, car park,
land development for the purposes of the building.
The building 1-storey warehouse building, 1-storey mechanical workshop and one
office building.
Clear height of storage section: 4.6m (up to main beams).
External facade • Front side: Cement Block walls, height:
> 1.20 to 4.20 m at the front
> 0.00 to 4.20 m at ‘vehicular entry’ from level 0
> 0.00 to 0.30 m in other parts of the building except the office
areas.
> Prefabricated insulated PIR panel in horizontal or vertical
layout.
• Office side: Aluminum Doors, Windows
Page 7 z 15
Fire load Fire loads up to 4000 MJ/sq. m
Warehouse part
Loa d-bearing structure Reinforced concrete columns, reinforced concrete or steel main
beams.
Column grid 4.5 m x 15.3 m as specified in the program and
plans. Corrosion protection of steel structure.
Page 8 z 15
Roof
Roof of the warehouse, 0.63 mm thick trapezoidal sheet
metal sheathing, powder-coated to standard color.
Roof insulation: rigid mineral wool covered with 1.2 mm
thick PVC membrane.
Natural light supply Natural light access to the storage section: via smoke
to the warehouse dampers and skylights (light supply area totaling 2% of the floor
section view area).
Transparent polycarbonate or acrylic glazing, fire retardant.
Smoke extraction launched by alarm from the sprinkler
pumping station.
Office section
Page 9 z 15
Bathroom and toilet 100 mm thick gypsum board partitions on steel system profiles
facilities with double panels (waterproof), with mineral wool
soundproofing, double coated with white emulsion paint.
Floor finishing: 20 cm x 20 cm ceramic tiles, standard color.
Wall finishing: white wall tiles up to 2m, showers: up to the ceiling.
Ceiling finish: mineral system ceiling suspended on a
frame, 60 cm x 60 cm waterproof white panels.
Bathroom and toilet accessories: ceramic white sanitary
ware.
Layout of plumbing units and sanitary fixtures: as per the plan.
Bathroom and toilet equipment: hangers, paper towel
dispensers, soap dispensers.
Sewage systems Sewer lines as required per engineering documents and codes.
Storm sewer system according to the applicable codes and
standards.
Water mains connected to the central office unit, with a
meter and branch service line for future office space.
According to the requirements, internal sewage and water
pipelines insulation to prevent condensation and freezing.
Fire protection ESFR sprinkler system (K240 heads) in the storage part, fire water
supply from fire water reservoirs. Internal hydrants and
handheld extinguishers on the storage space as per the local
codes, standards and requirements.
Outdoor hydrants located on site.
Acceptable fire load in the storage section: max. 4,000 MJ/m2.
Page 10 z
15
Electrical & Other installations
Lighting 200 lux in the warehouse (before racking), bathroom & toilet
facilities, corridors, and staircases
150 lux in technical areas
500 lux in office rooms
Emergency lighting / emergency exit identification at every
emergency exit (according to the applicable codes and
standards)
Telecommunication Telecommunication line ducts (fitted for secondary ducting
installation) to land plot borders, to the building.
The standard is exclusive of low current systems (CCTV,
computer network, access control, etc.) - optional pricing
available upon request
of the customer.
Manpower The office will directly employ 3 persons required for managing
the warehouse, mechanical work shop and for maintaining the
accounts of the facility. All other services will be outsourced.
Page 11 z
15
7. Financial Analysis
Detail Amount In RO
Land and Site Development 45,000.00
Building and Civil Work 145,000.00
ETP Plant / Machinery / Equipment 85,000.00
Vehicles 40,000.00
Furniture and Office Equipment 8,000.00
Pre- Operative Expenses 15,000.00
Contingency & Escalation 18,000.00
Total project Cost 356,000.00
7.1.1 Land
The proposed land for the facility buildings considered is 5000 sq.m The land rentals is RO 3 per
sq.m. Land and Site Development total estimation cost RO 45,000.00
7.1.4 Vehicles
The estimated cost of vehicles is RO 40,000.00
7.1.5 Furniture
The estimated cost of Furniture and Equipment is RO 8,000.00 which includes the main office
furniture and the basic furniture (Cupboard & Tables) for the Mechanical work shop.
7.1.7 Contingencies
Contingencies are provided at 3% of the estimated cost of fixed assets and it work out to
RO 18,000.00
7.2 Means of Finance
The following table provides the means of finance for the proposed project:
Details Amount RO
Equity (30% of project cost) 106,800.00
Commercial Loan @ 6% (70% of project cost) 249,200.00