You are on page 1of 8

UPPER SOLU HYDROELECTRIC PROJECT

CABLE SCHEDULE FOR INTERCONNECTION SUBSTATION (TINGLA)


LV POWER CABLE SCHEDULE
DATE: - 25/09/2022
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

AC & DC POWER CABLES


1+ (702) 1
DC 110 VDC Supply-1 from DCDB to LRMP for Control
1.1 KV CU, PVC 3C X 2.5 mm2 DC SYSTEM LRMP TB 1- (802) 2 XDC
5001 Circuit.
2+ (704) 1
DC 110 VDC Supply-2 from DCDB to LRMP for Control
1.1 KV CU, PVC 3C X 2.5 mm2 DC SYSTEM LRMP TB 2- (804) 2 XDC
5002 Circuit.
3+ (706) 1
DC 110 VDC Supply from DCDB to BMK (DC MCB-1M1)
1.1 KV CU, PVC 3C X 2.5 mm2 DC SYSTEM BMK TB 3- (806) 2 1M1
5003 for Distribution.
132 kV Outdoor Isolator 1 6 (J1)
DC 110 VDC Supply from BMK (DC MCB-1M2) to Isolator
1.1 KV CU, PVC 3C X 2.5 mm2 BMK with earth switch (Line 1M2 2 7 (J2) TB
5004 for control circuit
Side)
1 1 110 VDC Supply from BMK (DC MCB-1M3) to CB for
DC 132 kV Outdoor Circuit
1.1 KV CU, PVC 3C X 2.5 mm2 BMK 1M3 2 2 X1 Control Circuit.
5005 Breaker
X1-2, X1-3 to be shorted in breaker
1 5
DC 132 kV Outdoor Circuit 110 VDC Supply from BMK (DC MCB-1M4) to CB for
1.1 KV CU, PVC 3C X 2.5 mm2 BMK 1M4 2 6 X1
5006 Breaker spring charge motor
132 kV Outdoor Isolator 1 6 (J1)
DC 110 VDC Supply from BMK (DC MCB-1M5) to Isolator
1.1 KV CU, PVC 3C X 2.5 mm2 BMK without earth switch 1M5 2 7 (J2) TB
5007 for control circuit
(Bus-1)
132 kV Outdoor Isolator 1 6 (J1)
DC 110 VDC Supply from BMK (DC MCB-1M6) to Isolator
1.1 KV CU, PVC 3C X 2.5 mm2 BMK without earth switch 1M6 2 7 (J2) TB
5008 for control circuit
(Bus-2)

Page 1 of 8
LV POWER CABLE SCHEDULE
DATE: - 25/09/2022
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

R 31
To be
AC Y 32
1.1 KV CU, PVC 4C X 4 mm2 ACDB DC SYSTEM identified TB 400VAC from ACDB to battery charger source -1
5009 B 33
at site
N 34
R 35
To be
AC Y 36
1.1 KV CU, PVC 4C X 4 mm2 ACDB DC SYSTEM identified TB 400VAC from ACDB to battery charger source -2
5010 B 37
at site
N 39
To be R 1
AC
1.1 KV CU, PVC 3C X 2.5 mm2 ACDB LRMP identified Y 2 XAC 230 VAC from ACDB to LRMP for Control Circuit.
5011
at site
R R
To be
AC Y Y 400 VAC Supply from ACDB to BMK (AC MCB-M1) for
1.1 KV CU, PVC 4C X 4 mm2 ACDB BMK identified M1
5012 B B Distribution.
at site
N N
R 1 (H11)
132 kV Outdoor Isolator
AC Y 2 (H31) 400 VAC from BMK (AC MCB-M2) to Isolator for
1.1 KV CU, PVC 4C X 2.5 mm2 BMK with earth switch (Line M2 TB
5013 B 3 (H51) Motor, Illumination and Space heater Circuit.
Side)
N 4 (H2)
R 1 (H11)
132 kV Outdoor Isolator
AC Y 2 (H31) 400 VAC from BMK (AC MCB-M3) to Isolator for
1.1 KV CU, PVC 4C X 2.5 mm2 BMK without earth switch M3 TB
5014 B 3 (H51) Motor, Illumination and Space heater Circuit.
(Bus-1)
N 4 (H2)
R 1 (H11)
132 kV Outdoor Isolator
AC Y 2 (H31) 400 VAC from BMK (AC MCB-M4) to Isolator for
1.1 KV CU, PVC 4C X 2.5 mm2 BMK without earth switch M4 TB
5015 B 3 (H51) Motor, Illumination and Space heater Circuit.
(Bus-2)
N 4 (H2)
P 7
AC 132 kV Outdoor Circuit 230 VAC from BMK (AC MCB-M5) to LRMP for
1.1 KV CU, PVC 3C X 2.5 mm2 BMK M5 N 8 X1
5016 Breaker Illumination and Space heater Circuit.

Page 2 of 8
UPPER SOLU HYDROELECTRIC PROJECT
CABLE SCHEDULE FOR INTERCONNECTION SUBSTATION (TINGLA)
CT & CVT CABLE SCHEDULE
DATE: - 25/09/2022 REVISION: - R 0
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

CURRENT AND CAPACITIVE VOLTAGE TRANSFORMER CABLES

CVT- 1 1
CVT Metering 2 5 CVT Signal for TVM Metering Main Meter
1.1 KV CU, PVC 4C X 2.5 mm2 TVM XCVT TB
1001 Marshalling 3 9 CL 0.2, 15 VA
Box 4 10
CVT- 5 3
CVT Metering 6 7 CVT Signal for TVM Metering Check
1.1 KV CU, PVC 4C X 2.5 mm2 TVM XCVT TB
1002 Marshalling 7 11 Meter CL 0.2, 15 VA
Box 8 12
1 1
CVT 2 5 CVT Signal for Panel Metering CL 0.5, 15
1.1 KV CU, PVC 4C X 2.5 mm2 LRMP BMK XCVT XCVT
1003 3 9 VA
4 10
5 3
CVT 6 7
1.1 KV CU, PVC 4C X 2.5 mm2 LRMP BMK XCVT XCVT CVT Signal for Protection CL 3P, 15 VA
1004 7 11
8 12

Page 3 of 8
CT & CVT CABLE SCHEDULE
DATE: - 25/09/2022 REVISION: - R 0
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

CT Metering 1 1
CT 3 5 CT Signal for TVM Metering Main Meter
1.1 KV CU, PVC 4C X 4 mm2 TVM Marshalling XCT TB
1005 5 9 CL 0.2,15 VA
Box
7 10
9 3
CT Metering 11 7
CT CT Signal for TVM Metering Check Meter
1.1 KV CU, PVC 4C X 4 mm2 TVM Marshalling XCT TB
1006 13 11 CL 0.2, 15 VA
Box
15 12
1 1
CT 3 5 CT Signal for Panel Metering CL 0.5,15
1.1 KV CU, PVC 4C X 4 mm2 LRMP BMK XCT TB
1007 5 9 VA
7 10
9 3
CT 11 7
1.1 KV CU, PVC 4C X 4 mm2 LRMP BMK XCT TB CT Signal for Protection CL PS
1008 13 11
15 12
1
To be
CVT NEA BUS 2
1.1 KV CU, PVC 4C X 2.5 mm2 LRMP XVT1 identifie CVT Signal for BUS 1 CVT
1010 PT1 3
d at site
4
1
To be
CVT NEA BUS 2
1.1 KV CU, PVC 4C X 2.5 mm2 LRMP XVT2 identifie CVT Signal for BUS 2 CVT
1010 PT1 3
d at site
4

Page 4 of 8
CABLE DETAILS FROM CT/CVT TO JB/BMK
CVT Metering (4C X 2.5 sqmm) CVT Protection (4C X 2.5 sqmm)
CVT Side Marshalling Box CVT Side Bay Marshalling Kiosk
Cable/Core Cable/Core
Core Core
CVT No. TB No. TB No. Number to CVT No. TB No. TB No. Number to
Class Class
TVM LRMP
1a 1 CVT1001 -R 1a 1 CVT1003 -R
0.2 0.5
1n 2 Loop 1n 2 Loop
R Phase CVT R Phase CVT
2a 3 CVT1002 -R 2a 3 CVT1004 -R
0.2 3P
2n 4 Loop 2n 4 Loop
1a 5 CVT1001 -Y 1a 5 CVT1003 -Y
0.2 0.5
1n 6 Loop 1n 6 Loop
Y Phase CVT Y Phase CVT
2a 7 CVT1002 -Y 2a 7 CVT1004 -Y
0.2 3P
2n 8 Loop 2n 8 Loop
1a 9 CVT1001 -B 1a 9 CVT1003 -B
0.2 0.5
1n 10 CVT1001-N Loop 1n 10 CVT1003-N Loop
B Phase CVT B Phase CVT
2a 11 CVT1002 -B 2a 11 CVT1004 -B
0.2 3P
2n 12 CVT1002-N Loop 2n 12 CVT1004-N Loop

CT Metering (4C X 4 sqmm) CT Protection (4C X 4 sqmm)


CT Side Marshalling Box CT Side Bay Marshalling Kiosk
Cable Cable/Core
Core Core
CT No. TB No. TB No. Number to CT No. TB No. TB No. Number to
Class Class
Panel Panel
1S1 1 CT1005 -R 1S1 1 CT1007 -R
0.2 0.5
1S2 2 Loop 1S2 2 Loop
R Phase CT R Phase CT
2S1 3 CT1006 -R 2S1 3 CT1008 -R
0.2 PS
2S2 4 Loop 2S2 4 Loop
1S1 5 CT1005 -Y 1S1 5 CT1007 -Y
0.2 0.5
1S2 6 Loop 1S2 6 Loop
Y Phase CT Y Phase CT
2S1 7 CT1006 -Y 2S1 7 CT1008 -Y
0.2 PS
2S2 8 Loop 2S2 8 Loop
1S1 9 CT1005 -B 1S1 9 CT1007 -B
0.2 0.5
1S2 10 CT1005-N Loop 1S2 10 CT1007-N Loop
B Phase CT B Phase CT
2S1 11 CT1006 -B 2S1 11 CT1008 -B
0.2 PS
2S2 12 CT1006-N Loop 2S2 12 CT1008-N Loop
Page 5 of 8
UPPER SOLU HYDROELECTRIC PROJECT
CABLE SCHEDULE FOR INTERCONNECTION SUBSTATION (TINGLA)
CONTROL CABLE SCHEDULE
DATE: - 25/09/2022
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

CONTROL CABLES SCHEDULE


1 101 Common
X:ISO 2 102 89A Isolator opened signal to LRMP
3 104 89A Isolator closed signal to LRMP
X:ISO 12 8 Common
X:ISO 13 9 Isolator Open Command
132 kV Outdoor Isolator
X:ISO 14 10 Isolator Close Command
C 7001 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP without earth switch X:ISO 33 111 TB
Common
(Bus1) X:ISO 34 112 89A Isolator closed signal to LRMP
X:ISO 35 110 89A Isolator opened signal to LRMP

Terminal 101 & 103 to be shorted in isolator


Terminal 111 & 109 to be shorted in isolator
1 101 Common
X:ISO 4 102 89A Isolator opened signal to LRMP
5 104 89A Isolator closed signal to LRMP
X:ISO 19 8 Common
X:ISO 20 9 Isolator Open Command
132 kV Outdoor Isolator
X:ISO 21 10 Isolator Close Command
C 7002 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP without earth switch X:ISO 36 111 TB
Common
(Bus 2) X:ISO 37 112 89A Isolator closed signal to LRMP
X:ISO 38 110 89A Isolator opened signal to LRMP

Terminal 101 & 103 to be shorted in isolator


Terminal 111 & 109 to be shorted in isolator
X:ISO 26 8 Common
X:ISO 28 9 Isolator Close Command
X:ISO 27 10 Isolator Open Command
X:ISO 39 111 Common
132 kV Outdoor Isolator X:ISO 40 112 89A Isolator closed signal to LRMP
C 7003 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP with earth switch (Line X:ISO 41 110 TB 89A Isolator opened signal to LRMP
Side)

Terminal 13 & 15 to be shorted in isolator


5 107 Common
132 kV Outdoor Isolator
6 108 Earth Switch Closed Signal
with earth switch (Line
C 7004 1.1 KV CU, PVC 4C X 1.5 mm2 LRMP X:ESW 7 106 X1 Earth Switch Opened Signal
Side) -Earth Switch
Box Terminal 107 & 105 to be shorted in Earth Switch Box
X:CB 1 101 X3 Common
X:CB 2 102 X3 CB Position
X:CB 12 27 X1 Common
X:CB 13 28 X1 SF6 Pressure Block
X:CB 14 30 X1 Spring Charge Indication
132 kV Outdoor Circuit X:CB 6 109 Common
C 7005 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP X:CB 7 110 CB Open Signal
Breaker
X:CB 8 108 X3 CB Close Signal
X:CB 9 113
CB Auto trip Signal
X:CB 10 114
Terminal 27 & 29 to be shorted in breaker.
Terminal 109 & 107 to be shorted in breaker
3 1 110 V Positive Supply
4 39 CB Protection Trip
X:TC1 6 10 CB Remote Trip 1
7 39 CB Trip Coil 1 for Post Close Supervision
132 kV Outdoor Circuit 8 38 CB Trip Coil 1 for Pre Close Supervision
C 7006 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP X1
Breaker 3 43 110 V Positive Supply
4 41 CB Protection Trip
X:TC2 6 11 CB Remote Trip 2
7 41 CB Trip Coil 2 for Post Close Supervision
8 40 CB Trip Coil 2 for Pre Close Supervision
3 1 110 V Positive Supply
132 kV Outdoor Circuit 4 9 CB Remote Close
C 7007 1.1 KV CU, PVC 4C X 1.5 mm2 LRMP X:CB X1
Breaker 5 26 CB Auto Re Close

1
2
3
4
132 kV Outdoor Isolator 5 To be
C 7008 1.1 KV CU, PVC 10C X 1.5 mm2 BMK without earth switch TB 6 identified Electrical Interlocking
(Bus1) 7 at site
8
9
10
11
12
13
14
132 kV Outdoor Isolator 15 To be
C 7009 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP without earth switch TB 16 identified Electrical Interlocking
(Bus 2) 17 at site
18
19
20

21
132 kV Outdoor Isolator To be
22
C 7010 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP with earth switch (Line TB identified Electrical Interlocking
23
Side) at site
24
132 kV Outdoor Isolator 25
To be
with earth switch (Line 26
C 7011 1.1 KV CU, PVC 4C X 1.5 mm2 LRMP TB identified Electrical Interlocking
Side) -Earth Switch 27
at site
Box 28
29
30
31
32
33 To be
132 kV Outdoor Circuit
C 7012 1.1 KV CU, PVC 10C X 1.5 mm2 LRMP TB 34 identified Electrical Interlocking
Breaker
35 at site
36
37
38