Sr No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Checkpoint
Visual inspection for casting defects on pump casing, impeller, casing cover and bearing housing, Inserts etc
Visual inspection for machining/casting defects on machining parts of pump casing, impeller,casing cover and
bearing housing, inserts etc
Verification of OA and Pump Sr No.
Verification of Drilling and Tapping
Verification of Mechanical or Gland Packing Assembly
Fittment of Sealing pipe, Grease Nipple,Plugs sealing connections, Lifting Eye Bolt
Direction of Rotation of Pump
Hydrotest of Pump
Strip Test
Rotation of Pump
Top and Bottom matching in case of Split case Pump
Cleanliness of componant
Rust oil application on machined parts
Impeller balancing stamp vaerification on impeller during CVT /spare inspection
Performance Test of Pump
Remark

CW/CCW