TECHO COMMERCIAL PROPOSAL

------------------------------------------------------------------------------------------
FAO: Mr Mahesh Kommuru Date: 04 August 2021
Project Planning & Controls Manager Ref: PI/DYA/804-21-L1
L&T Co. Ltd.,

Sub:  Structural works Erection.


Dear Sir,

Thank you for your enquiry regarding captioned project. Please find below our best
proposal on the assumptions of provided information:

1. Scope of Work
Erection of Structure, Unloading, Assembly, Bolting and Handing Over

2. Price

Sl. Rate per Ton


Description Unit
No (SR)

1 Unloading, Assembly, Bolting and Handing Over of Ton 1,550.00


Structure.

Prices are subject to VAT and governemnt fee and taxes

3. PeralIndex Responsibilty
 Provide all manpower
 Enusre to meet project time line
 Submit daily progress report
 Undertake all quality and safety measures

4. L&T Support and Responsibilty
 Provide project site ready to assume the project
 Provide all material and resources including equipment that are required to mature the
project
 Provide necessary drawings
 Provide all accessess and gate passes
 Provide transportation at site
 Provide workable atmosphere and necessary utilities at site
 Provide FAT to Pearl Index employees

5. Terms & Conditions


• Offer validity -07 days.
• VAT not included in offered price.
• Our proposal is subject to availability of manpower and equipments until the
placement of firm order by client.
• Offer is inclusive of mobilizing and demobilizing of specialized manpower to site for the
safe execution of the project.
• Any additional work shall be back charged to te client
• The Offer does not include an y cost of construction.
• Client to provide free to access, firm and level ground for the safe operation.
• All necessary utility connections to be provided by client.
• Client to arrange all permits, gate passes etc. required for the access of all
manpower and equipments to the site.
• Pear Index will not be responsible for any direct or indirect losses which may arise
due to the reasons beyond our control.
Standby charges:
- Any delay and detention of crew standby/idle shall be calculated on the basis of
proposed offer.

6. Insurance

A blanket Insurance coverage to be provided by the client for the crew and 3rd party liability
for all risks and include Pearl Index and subcontractors as a co-insurer with unconditional
waiver of subroganization towards their owners and employees.
7. Payment Terms
a) 50% Advance payment with PO.
b) Balance on progressive invoice

All necessary procedures/approvals shall be submitted for approval subject to the firm order
as narrated above.

We trust our proposal will meet your desired requirements and force you to issue firm order
in our favor. Assure you professiona deligent support to all given assignments.

Looking forward to your swift response.

Your sincerely
For and on Behalf of Pearl Index

Sales & Marketing Team

You might also like