You are on page 1of 53

Metals Industry Research and Development Center

Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, VINCENT BOY E. MANABAT, SCIENCE RESEARCH SPECIALIST II, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated
measures for the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (70%)

Strategy 2.3 Implement exemplary


science and technology services

Render of Technical Services


5 technical services rendered (external TSRs only) '*100% External Technical services
95% of actual requests for technical services have rendered
been provided within the required timeframe with no *100% rendered for actual request for 20 5 1.00
complaints ; Technical services within the required
timeframe with no complaints
*100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97 % machines in good working
Resources relevant to industry condition 25 5 1.25

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan *196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for 25 5 5 1.25
corrective maintenance)
*54 CM workorder conducted

Stategic Function (20%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 5 5 0.25

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 5 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

5 0.25
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5

Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 5 5 0.25
Management Machine Availability
Workorder Forms
Weekly accomplishment forms
Support Function (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision working days ahead of deadline 5 (Internal Jobs)
2. Clients Served
3. Other reports required by the
5 0.25 center(DTR)
without revision 5

Project membership AMCen


100% of project activities are completed on time
based on the latest approved workplan 100% attendance / participation to
committee activities 5 5 0.25

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 3.50
Strategic Functions (20%) 0.75
Support Functions (10%) 0.50
Total Overall Rating 4.75
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

VINCENT BOY E. MANABAT


Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, VINCENT BOY E. MANABAT, SCIENCE RESEARCH SPECIALIST II, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the
following targets on accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
VINCENT BOY E. MANABAT
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (70%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 6

95% of Request for Technical Services that have been provided 6


within the required Timeframe;

95% of clients rated the technical services as satisfactory 6

1 Short Term Consultancy 2

Page 3 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 25

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 25
maintenance plan

Strategic Functions (20%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 5
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 5
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 3

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
5
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
2

Conduct of Training 1

Page 4 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

EMS Participation 2
Project membership
100% of project activities are completed on time based on the
latest approved workplan 5

Page 5 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: VINCENT BOY E. MANABAT
Position: Science Research Specialist II
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (70%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 6

95% of Request for Technical Services that have


been provided within the required Timeframe 6

95% of clients rated the technical services as


satisfactory 6

1 Short Term Consultancy


2

Percent of machines in working condition 25 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 25 100% of target machines in working condition
the maintenance plan

Stategic Function (20%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
5
Without major/significant NC during external audit
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 5

100% of target machines in working condition


Availability of operators/technicians/engineers
3
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 5 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 2 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)
Conduct of Training Seminars/training conducted more than the target
1 quantity. "O" Rating for Resource Speaker

EMS Participation 100% Attendance/ Participation to committee activities


2

Project membership 100% of project activities are completed on time based


100% of project activities are completed on time on the latest approved workplan
5
based on the latest approved workplan

Prepared by: Reviewed by:

VINCENT BOY E. MANABAT FLORENTINO J. LAFUENTE


Science Research Specialist II Head, MPS
Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, MELCHOR A. GAMILLA, SCIENCE RESEARCH SPECIALIST II, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated
measures for the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (70%)

Strategy 2.3 Implement exemplary


science and technology services

Render of Technical Services *100% External Technical services


1 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
* 100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 30 5 1.50

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan *196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for 30 5 5 1.50
corrective maintenance)
*54 CM workorder conducted

Stategic Function (20%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 5 5 0.25

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 5 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

5 0.25
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5

Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 5 5 0.25
Management Machine Availability
Workorder Forms
Weekly accomplishment forms
Support Function (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision working days ahead of deadline 5 (Internal Jobs)
2. Clients Served
3. Other reports required by the
5 0.25 center(DTR)
without revision 5

Project membership 86 % Completed


100% of project activities are completed on time "Technical Support and Evaluation
based on the latest approved workplan 100% attendance / participation to 5 5 0.25 for the Hybrid Electric Operation"-
committee activities Project Staff

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 3.50
Strategic Functions (20%) 0.75
Support Functions (10%) 0.50
Total Overall Rating 4.75
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

MELCHOR A. GAMILLA
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, MELCHOR A. GAMILLA, SCIENCE RESEARCH SPECIALIST II, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following
targets on accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
MELCHOR A. GAMILLA
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (70%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 3

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

1 Short Term Consultancy 1

Page 11 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 30

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 30
maintenance plan

Strategic Functions (20%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 5
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 5
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 3

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
5
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
2

Conduct of Training 1

Page 12 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

EMS Participation 2
Project membership
100% of project activities are completed on time based on the
latest approved workplan 5

Page 13 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: MELCHOR A. GAMILLA
Position: Science Research Specialist II
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (70%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 3

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

1 Short Term Consultancy


1

Percent of machines in working condition 30 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 30 100% of target machines in working condition
the maintenance plan

Stategic Function (20%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
5
Without major/significant NC during external audit
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 5

100% of target machines in working condition


Availability of operators/technicians/engineers
3
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 5 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 2 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)
Conduct of Training Seminars/training conducted more than the target
1 quantity. "O" Rating for Resource Speaker

EMS Participation 100% Attendance/ Participation to committee activities


2

Project membership 100% of project activities are completed on time based


100% of project activities are completed on time on the latest approved workplan
5
based on the latest approved workplan

Prepared by: Reviewed by:

MELCHOR A. GAMILLA FLORENTINO J. LAFUENTE


Science Research Specialist II Head, MPS
Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, JOEL A. ELIGUE, ADMINISTRATIVE ASSISTANT V, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated measures for
the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

Render of Technical Services


1 technical services rendered (external TSRs only) *100% External Technical services
rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required
complaints ; timeframe with no complaints 10 5 0.50
95% of clients rated the technical services as *100% rating of clients for technical
satisfactory or better services

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan *196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 5 1.75
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5
Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 2 5 0.10
Management
Machine Availability
Workorder Forms
Weekly accomplishment forms

Support Function (10%)


Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision 5 (Internal Jobs)
working days ahead of deadline
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 4.00
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.90
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

JOEL A. ELIGUE
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, JOEL A. ELIGUE, ADMINISTRATIVE ASSISTANT V, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets on
accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
JOEL A. ELIGUE
Date : ___________________

Major Final Outputs Success Indicators Sub- Remarks


( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 3

95% of Request for Technical Services that have been provided


3
within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

1 Short Term Consultancy 1

Page 19 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
4

Conduct of Training 2
EMS Participation 4

Page 20 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: JOEL A. ELIGUE
Position: Administrative Assistant V
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 3

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

1 Short Term Consultancy


1

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2

100% of target machines in working condition


Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 4 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

Conduct of Training Seminars/training conducted more than the target


2 quantity. "O" Rating for Resource Speaker

EMS Participation 100% Attendance/ Participation to committee activities.


4

Prepared by: Reviewed by:

JOEL A. ELIGUE FLORENTINO J. LAFUENTE


Administrative Assistant V Head, MPS

Approved by:
ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, RODOLFO C. SERQUIÑA SR., ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated
measures for the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

'Render of Technical Services *100% External Technical services


1 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
*100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan * 196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 5 1.75
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5
Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 2 5 0.10
Management
Machine Availability
Workorder Forms
Weekly accomplishment forms

Support Function (10%)


Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision 5 (Internal Jobs)
working days ahead of deadline
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 4.00
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.90
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

RODOLFO C. SERQUIÑA SR
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, RODOLFO C. SERQUIÑA SR., ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the
following targets on accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
RODOLFO C. SERQUIÑA SR.
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 4

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

Page 26 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
5

EMS Participation 5

Page 27 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: RODOLFO C. SERQUIÑA SR.
Position: Administrative Assistant III
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 4

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit

6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2
100% of target machines in working condition
Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 5 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

EMS Participation 100% Attendance/ Participation to committee activities.


5

Prepared by: Reviewed by:

RODOLFO C. SERQUIÑA SR. FLORENTINO J. LAFUENTE


Administrative Assistant III Head, MPS

Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, WILLIAM M. BALOLOY, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated
measures for the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

Render of Technical Services *100% External Technical services


5 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
* 100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan * 196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 5 1.75
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5
Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 2 5 0.10
Management
Machine Availability
Workorder Forms
Weekly accomplishment forms

Support Function (10%)


Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision 5 (Internal Jobs)
working days ahead of deadline
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 4.00
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.90
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

WILLIAM M. BALOLOY
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, WILLIAM M. BALOLOY, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following
targets on accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
WILLIAM M. BALOLOY
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 4

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

Page 32 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
5

EMS Participation 5

Page 33 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: WILLIAM M. BALOLOY
Position: Administrative Assistant III
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 4

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit

6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2
100% of target machines in working condition
Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 5 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

EMS Participation 100% Attendance/ Participation to committee activities.


5

Prepared by: Reviewed by:

WILLIAM M. BALOLOY FLORENTINO J. LAFUENTE


Administrative Assistant III Head, MPS

Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, VIRGILIO P. LIM, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated measures for
the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

'Render of Technical Services *100% External Technical services


5 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
* 100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan * 196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 4 1.58
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5

Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records
Management TSR Forms 2 5 0.10
Machine Availability
Workorder Forms
Weekly accomplishment forms
Support Function (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision working days ahead of deadline 5 (Internal Jobs)
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 3.83
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.73
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

VIRGILIO P. LIM
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, VIRGILIO P. LIM, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets on
accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
VIRGILIO P. LIM
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 4

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

Page 38 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
5

EMS Participation 5

Page 39 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: VIRGILIO P. LIM
Position: Administrative Assistant III
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 4

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit

6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2
100% of target machines in working condition
Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 5 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

EMS Participation 100% Attendance/ Participation to committee activities.


5

Prepared by: Reviewed by:

VIRGILIO P. LIM FLORENTINO J. LAFUENTE


Administrative Assistant III Head, MPS

Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, RANDY E. SONGAHID, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated measures
for the period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

'Render of Technical Services *100% External Technical services


5 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
*100 % rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan * 196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 4 1.58
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5
Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 2 5 0.10
Management
Machine Availability
Workorder Forms
Weekly accomplishment forms

Support Function (10%)


Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision 5 (Internal Jobs)
working days ahead of deadline
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 3.83
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.73
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

RANDY E. SONGAHID
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, RANDY E. SONGAHID, ADMINISTRATIVE ASSISTANT III, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following
targets on accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
RANDY E. SONGAHID
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 4

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

Page 44 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
5

EMS Participation 5

Page 45 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: RANDY E. SONGAHID
Position: Administrative Assistant III
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 4

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit

6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2
100% of target machines in working condition
Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 5 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

EMS Participation 100% Attendance/ Participation to committee activities.


5

Prepared by: Reviewed by:

RANDY E. SONGAHID FLORENTINO J. LAFUENTE


Administrative Assistant III Head, MPS

Approved by:

ROMMEL N. COROÑA
OIC, TSSS
Metals Industry Research and Development Center
Annex H - INDIVIDUAL PERFORMANCE REVIEW FORM (IPRF)

I, JUAN V. AZUCENA, METAL TECHNOLOGIST I, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets in accordance with the indicated measures for the
period JULY to DECEMBER 2022.

Ratings
Success Indicators Sub-
Major Final Outputs Actual Accomplishments Remarks
(Targets+Measures) weight
Q E T A

Core Functions (80%)

Strategy 2.3 Implement exemplary


science and technology services

Render of Technical Services *100% External Technical services


5 technical services rendered (external TSRs only) rendered
95% of actual requests for technical services have *100% rendered for actual request for
been provided within the required timeframe with no Technical services within the required 10 5 0.50
complaints ; timeframe with no complaints
* 100% rating of clients for technical
95% of clients rated the technical services as services
satisfactory or better

Strategy 7.1 Maintain and expand Percent of machines in working condition * 97% machines in good working
Resources relevant to industry condition 35 5 1.75

Conduct Preventive/Corrective maintenance 100% PPM conducted as scheduled on


Preventive Maintenance conducted as scheduled on the Maintenance Plan
the maintenance plan * 196 PPM workorder conducted
97% CM conducted (continue follow up /
repair of machines that are subject for
corrective maintenance) 35 5 5 1.75
*54 CM workorder conducted

Stategic Function (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee) Without major/significant NC during add 3% from other strategic
Without major/significant NC during external audit external audit conducted on August function
17,2022 3 5 0.15

6.3 Implement Productivity No. of non-ICT productivity improvement program 2nd sem Non-ICT productivity Improvement
Improvement Programs 100% of scheduled non-ICT productivity improvement activities scheduled on 2nd sem
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2 - - - 5% weight to be transferred to
other strategic function

7.1 Maintain and expand resources Availability of operators/technicians/engineers 100% operators/technicians/engineers


relevant to industry 100% operators/technicians/engineers available available add 1% from other strategic
5 function

3 0.15
Availability of tools/accessories/supplies/materials 100%
100% tools/accessories/supplies/materials available tools/accessories/supplies/materials
available 5
Handling and filing of internal and external add 1% from other strategic
documents 100% of documents are traceable, function
retrievable and complete
Communications and Records TSR Forms 2 5 0.10
Management
Machine Availability
Workorder Forms
Weekly accomplishment forms

Support Function (10%)


Compliance to internal requirements
Reports/requirements submitted on deadline; Reports/requirements submitted 2 1. Technical Service Rendered
without revision 5 (Internal Jobs)
working days ahead of deadline
2. Clients Served
3. Other reports required by the
10 0.50 center(DTR)
without revision 5

Comments and Recommendations for Development Purposes:

Average Ratings
Core Functions (70%) 4.00
Strategic Functions (20%) 0.40
Support Functions (10%) 0.50
Total Overall Rating 4.90
Final Rating 4
Adjectival Rating VS

Assessed by : Reviewed by: Calibrated by: Final Rating by:


I certify that I discussed my assessment of the performance with
employee:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: __________________ Date: Date: Date : Date: _______________

Conforme:

JUAN V. AZUCENA
Date: ______________________
Metals Industry Research and Development Center
Annex G - INDIVIDUAL PERFORMANCE COMMITMENT FORM (IPCF)

I, JUAN V. AZUCENA, METAL TECHNOLOGIST I, TSSS- TECHNICAL MAINTENANCE GROUP(TMG) commit to deliver and agree to be rated on the following targets on
accordance with the indicated measures for the period JANUARY to JUNE 2023.

Reviewed by: Calibrated by: Approved by:

FLORENTINO J. LAFUENTE ROMMEL N. COROÑA JELLY N. ORTIZ JONATHAN Q. PUERTO ROBERT O. DIZON
Head, MPS/ Rater OIC, TSSS FAD-AGSS PMT Executive Director
Date: ___________ Date : ______________ Date:____________ Date : _________________ Date : ________________

Conforme:
JUAN V. AZUCENA
Date : ___________________

Success Indicators Sub-


Major Final Outputs Remarks
( Targets + Measures ) Weight

Core Functions (80%)


Strategy 2.3 Implement exemplary science and
technology services 100 % Compliance to external regulatory/reportorial requirements 4

95% of Request for Technical Services that have been provided 3


within the required Timeframe;

95% of clients rated the technical services as satisfactory 3

Page 50 of 53
Success Indicators Sub-
Major Final Outputs Remarks
( Targets + Measures ) Weight

Strategy 7.1 Maintain and expand resources relevant to


industry
90% Percent of machines in working condition 35

Conduct Preventive/Corrective maintenance


Preventive Maintenance conducted as scheduled on the 35
maintenance plan

Strategic Functions (10%)


5.1 Implement management systems Conduct of External/ Internal Audit (As Auditee)
Without major/significant NC during external audit 2
6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program
100% of scheduled non-ICT productivity improvement program
implemented; Updated Citizen's Charter submitted on deadline; 2
without revision

7.1 Maintain and expand resources relevant to industry Availability of operators/technicians/engineers


100% operators/technicians/engineers available 2

Availability of tools/accessories/supplies/materials
100% tools/accessories/supplies/materials available 2

Communications and Records Management Handling and filing of internal and external documents
2
Support Functions (10%)
Compliance to internal requirements
Reports/requirements submitted on deadline; without revision
5

EMS Participation 5

Page 51 of 53
Annex O - INDIVIDUAL FUNCTION SHEET
Name of Employee: JUAN V. AZUCENA
Position: Metal Technologist I
Section: Technology Solution Services Section (TSSS)
Unit: Technical Maintenance Group (TMG)
January to December 2023

Sub-
Core Functions (80%) Success Indicators Details/Description of Targets
weight
Strategy 2.3 Implement exemplary science and 100 % Compliance to external regulatory / reportorial
technology services requirements 4

95% of Request for Technical Services that have


been provided within the required Timeframe 3

95% of clients rated the technical services as


satisfactory 3

Percent of machines in working condition 35 90% of target machines in working condition


Strategy 7.1 Maintain and expand resources relevant
to industry Conduct Preventive/Corrective maintenance
Preventive Maintenance conducted as scheduled on 35 100% of target machines in working condition
the maintenance plan

Stategic Function (10%)


5.1 Implement management systems Without major/significant NC during internal/external
Conduct of External/ Internal Audit (As Auditee) audit
2
Without major/significant NC during external audit

6.3 Implement Productivity Improvement Programs No. of non-ICT productivity improvement program Updated Citizen's Charter submitted 3 or more days
100% of scheduled non-ICT productivity improvement ahead of deadline
program implemented; Updated Citizen's Charter
submitted on deadline; without revision 2
100% of target machines in working condition
Availability of operators/technicians/engineers
2
100% operators/technicians/engineers available
7.1 Maintain and expand resources relevant to
100% of target machines in working condition
industry Availability of
tools/accessories/supplies/materials 2
100% tools/accessories/supplies/materials available

100% of documents are traceable, retrievable and


Communications and Records Management Handling and filing of internal and external documents 2 complete

Support Function (10%)


Compliance to internal requirements Submission includes reports required by PMD and FAD
Reports/requirements submitted on deadline; without (example: Monthly Accomplishment Reports, Project
revision 5 Monitoring Reports, accomplished DTR, Individual L&D
Plan etc.)

EMS Participation 100% Attendance/ Participation to committee activities.


5

Prepared by: Reviewed by:

JUAN V. AZUCENA FLORENTINO J. LAFUENTE


Metal Technologist I Head, MPS

Approved by:

ROMMEL N. COROÑA
OIC, TSSS