You are on page 1of 14

ARCHITECTURAL FLOORS PLAN

AND DETAIL DRAWINGS


A B C D A B C D
1,373
10 93 10 142 1,373
500 333 500
275 500 333 500
40 137 20 147 20 147 20 147 20 147 20 147 20 147 20 137 40
10 93 10 142 40 137 20 147 20 147 20 147 20 147 20 147 20 147 20 137 40

W11 W11 W11 W11 W11 W11 W11 W4 W4 W10 W4 W4


W8 D10
1 1

40

40
DB DB RB DB RB RB RB RB
DB DB DB RB RB RB RB
PC PC PC PC DB DB
C
WC WC TC PC WC WC TC TC
PD PD PC PC
PD PD C
CWSD CWSD CWSD CWSD
TC TC TC
CWSD DP
A B CD E CWSD CWSD
2 1 4 1 - OD

332

331
DL
344

A B CD E

332
344
KS CWSD C DP
C 2 1 4 1 - A B CD E CWSD
4 3 3 - - Pool Office A B CD E
4 3 3 - - Pool Office
TC TC
Office GC

460

500
5M2
kitchenette

460

500
A B CD E 2
CWSD CWSD 5M A B CD E
PC
C
B Toilet A B CD E KC
3 1 2 1 TC
B Toilet
A B CD E
3 1 2 1
PC
TC
3 1 2 1 TC
PC
4 3 - - 41 M 2 C 2
41 M
2.5 M 2 PC PC 10 M 2
CM
P1
D5 D5

12
D5 D4

12
158 15 321 329 12 TC 498 TC
TC510 TC
CWSD CWSD
324 170 15 235 80 CWSD CWSD

793
Corridor
136

Corridor C

136
31 M 2

222
2
27 M
PC PC

2
PC PC

40
DB
PC PC DB
PC PC
P1
RB
RB

167
449

CWSD CWSD

167
TC TC CWSD CWSD
TC TC

D3 -5.60 D3

150
-8.40
W9

1,334

W9
293

1,334
DB

293
DB

A B CD E A B CD E
A B CD E
5 2 4 2 - 2 1 2 1 - A B CD E
TC TC 2 1 2 1
TC TC

167
CWSD CWSD 5 2 1 2 -

167
RB CWSD CWSD RB
89

PC PC
3 3

40
PC PC
PC PC
PC PC

CWSD CWSD
CWSD CWSD
TC TC
TC TC
503

PC TC TC PC
Pool Office

503
PC TC TC PC
Pool Office

460

500

460

500
A B CD E
A B CD E
3 1 2 1
CWSD 3 1 2 1
CWSD CWSD
23 M 2 CWSD
DP 23 M 2
CWSD DP
CWSD CWSD
CWSD

PCPC PC
TC TC
PCPC PC
TC TC

4 4

THIRD BASEMENT FLOOR PLAN (REGISTRY ROOM) SECOND BASEMENT FLOOR PLAN (SWITCH ROOM)

SC 1/100 SC 1/100

GSPublisherVersion 0.0.100.100
A B C D A B C D
255 1,373 255 1,373

275 500 333 500 275 500 333 500

10 93 10 142 40 137 20 147 20 147 20 147 20 147 20 147 20 147 20 137 40 10 93 10 142 177 20 147 20 147 20 147 20 147 20 147 20 147 137 40

W4 W4 W4 W4 W4 W4 W8
D7 W4 W10 W4 W10 W4 W4 W10 D7

1 1

40
40
GB DB DB RB RB RB RB RB RB DB DB DB RB RB RB RB RB
DB DB DB DB C
GB C
KS
WC WC WC
PC TC TC PC Emergency WC WC TC TC PC
Emergency PD
PD PD PD PD C PC PC
C Exit
Exit B
A B CD E DP A B CD E KC DP
CWSD CWSD OD CWSD CWSD
2 1 4 1 OD 2 1 4 1 -
HD
DL

332
DL

332

344
CM C
344

C DP CWSD CWSD
A B CD E CWSD A B CD E
4 3 3 - - Pool Office A B CD E 4 3 3 - - Pool Office
Office 4 3 3 - - RE Office GC

460

500
460

500
2
10 M 2 5M A B CD E

490
A B CD E
A B CD E 5M2 PC
Toilet C 3 1 2 1
PC
TC
3 1 2 1 TC
PC
kitchenette B Toilet C
A B CD E
3 1 2 1
PC TC 3 1 2 1 TC

41 M 2 24 M 2
10 M 2 10 M 2
B B P1
SD DB HD P1
D5 D4 D5 D5 D4
20 12 C
173 321 12 237 80 498 20

12
15

12
158 266 70 234 80 TC TC TC TC
CWSD CWSD
Corridor Corridor CWSD CWSD

136
136

21 M 2 P1 21 M 2 P1

PC

2
PC PC PC

40
40
DB

12
PC PC
P1 DB
P1

Secretary RB

167
167
RB

W6

W6
CWSD CWSD
W6

W6
449

FX PCM

470
TC TC A B CD E
D3 3 1 2 1
C

W9
±0.00
W9

1,334
1,334
2
D3 15 M

291

293
293
DB
A B CD E SD
-2.80 5 2 1 2 -
A B CD E

W6

W6
W6

W6
TC TC GC DP C
5 2 1 2 -

167
167
A B CD E CWSD CWSD RB A B CD E
2 1 2 1 RB
2 1 2 1
P1 PC
P1

3 3

12
P1
PC

40
PC

40
PC PC PC PC
DP
CWSD CWSD

CWSD CWSD TC TC

Information Desk
TC TC
PC
P1
ID

TC PC
PC TC TC PC
Pool Office TC
Pool Office

510

460

500
460

500
PC

A B CD E A B CD E A B CD E
3 1 2 1 1 1 1 1 1 3 1 2 1
CWSD CWSD CWSD
2
CWSD 41 M 2 25 M 2
23 M
DP
CWSD
-1.40 CWSD
CWSD
CWSD

PC WC TC PC
PCPC PC TC
TC TC

PL

4
DB

4
RB RB RB RB RB DB RB
DB

40
D2 D1
W3 W3 W3 W3 W3 W3

Ramp
(COORINATORS)
FIRST BASEMENT FLOOR PLAN
SC 1/100 GROUND FLOOR PLAN
SC 1/100

GSPublisherVersion 0.0.100.100
A B C D A B C D
255 1,373 255 1,373

275 500 333 500 10 93 10 162 500 333 500

10 93 10 142 40 137 147 147 147 147 147 147 137 40 10 93 10 142 40 137 147 147 147 147 147 147 137 40

D7 W4 W4 W4 W4 W4 W4 W8 D7 W4 W4 W4 W4 W4 W4 W8

1 1

40
40
RB DB RB RB RB RB RB RB DB DB RB DB RB RB DB RB RB
GB DB DB DB DB C
GB C
KS
WC WC WC TC TC PC PC TC TC PC
Emergency PD
PD PD C
PC
PC
PC
Emergency PD PD C

Exit Exit
B
A B CD E DP KC CWSD
CWSD CWSD CWSD
2 1 4 1 OD
HD OD DL

332
C

344
332
C CM CWSD
CWSD CWSD CWSD
A B CD E A B CD E
4 3 3 Pool Office A B CD E
A B CD E 4 3 3 - - Pool Office
4 3 3 - - RE Office

460

500
Office

460

500
2 1 4 1 5M 2
A B CD E
10 M 2

490
A B CD E
PC 5M2 A B CD E PC
C A B CD E PC TC 3 1 2 1 TC
kitchenette B Toilet C
3 1 2 1 PC TC
3 1 2 1 TC
3 1 2 1 24 M 2 24 M 2
10 M 2

490
B B 10 M 2
SD DB HD P1 P1
D5 D4 D5 D5 D4
158 15 236 85 12 317 12 498

12
C

12
158 15 241 80 249 80 12 498 TC TC
TC TC
Corridor Corridor CWSD CWSD

136
CWSD CWSD
2
2
20 M P1
20 M
P1

2 2
PC PC PC
PC

40
40
D5
P1 DB

12
P1 DB

12
P1 RB
RB

167
Secretary

167

W6

W6
449
DP
W6

W6
A B CD E DP
D3 3 1 2 1 D3
A B CD E
C
+2.80 C 3 1 2 1
Secretary

1,334
1,334

293
W9
293
W9

292
15 M 2

292
A B CD E A B CD E SD
15 M 2 5 2 1 2 - +5.60
5 2 1 2 -
SD

W6

W6
C GC C

167
GC
W6

W6

167
A B CD E A B CD E
RB
2 1 2 1 RB 2 1 2 1
P1 PC
PC P1
P1

3
P1

40
40

12
C C P1
12

C C C C C C PC PC
PC PC
PC PC

CWSD CWSD CWSD CWSD


CWSD CWSD
Pool Office TC TC 200 10
Pool Office 1,123
TC TC
TC TC
TC cu A B CD E
A B CD E
PC 3 1 2 1
853 3 1 2 1 480
65 M 2 65 M 2
CWSD
DL
TC TC TC PC
500

TC TC PC TC TC TC TC
TC TC

489

460

500
PC
488

460

500
CWSD CWSD CWSD CWSD
CWSD CWSD cu
DL
CWSD CWSD CWSD
CWSD CWSD PC PC PC PC CWSD
PC PC PC PC

CWSD PC PC PC PC PC PC PC CWSD
PC PC CWSD TC CWSD CWSD CWSD CWSD

CWSD CWSD
CWSD CWSD TC TC TC PC
TC TC TC TC PC TC TC
PC TC TC

DB DB DB DB
RB RB RB RB RB RB RB RB

4
RB RB RB RB RB RB RB RB

40
40

W8 W4 W4 W4 W4 W4 W4 W8 W8 W4 W4 W4 W4 W4 W4 W8

(GENERAL STAFFS OFFICE) (GENERAL STAFFS OFFICE)


FIRST FLOOR PLAN SECOND FLOOR PLAN
SC 1/100 SC 1/100

GSPublisherVersion 0.0.100.100
A B C D A B C D
255 1,373 255 1,373

10 93 10 162 500 333 500 275 500 333 500

10 93 10 142 40 137 147 147 147 147 147 147 137 40 10 93 10 142 40 137 147 147 147 147 147 147 137 40

Balcony

D7 W4 W4 W4 W4 W4 W4 W8 D7 W4 W4 W4 W4 D8 D8 W8

1 1

40
40
RB DB RB RB RB RB DB DB RB DB RB RB DB RB RB
GB DB DB DB DB
GB KS
Emergency PD
WC
PD
WC
PD
WC
C
PC
Pool Office PD PD C
PC

TC TC
Exit PC
TC TC
PC
PC PC
B A B CD E KC DP
A B CD E DP
2 1 4 1 2 1 4 1
HD OD OD
cu cu C cu cu
CM

332
C CWSD CWSD CWSD CWSD
A B CD E A B CD E

332
A B CD E 4 3 3 - -
4 3 3
Office 4 3 3 - - RE Office GC
Pool Office

460

500
GC

460

500
10 M 2 5M2 A B CD E
A B CD E 5M 2 A B CD E
A B CD E
C
3 1 2 1
TC
3 1 2 1
TC kitchenette B Toilet C
3 1 2 1
TC
3 1 2 1
TC
PC 19 M 2
PC 19 M 2 PC 2 PC
10 M 2 10 M
B B P1
SD DB HD P1
D5 D4 D5 D5 D4
CWSD cu CWSD
158 15 0 321 15 314 12 498

12
CWSD cu CWSD cu
424 70 12 237 80

12
cu

773
773
Corridor Corridor
2 C C C C 2
20 M C C C C
20 M P1
P1

2 2

40
40
DB Secretary DB

RB RB
A B CD E

167
44 293 12 508 3 1 2 1

167
DP

W6

W6
DP
W6

W6
D3 C D3
C
Secretary +11.20 19 M 2

1,334
1,334

W9

293
+8.40 A B CD E
W9

293
A B CD E 3 1 2 1 SD SD
5 2 1 2 - A B CD E
19 M 2 2 1 2 1 GC C

W6

W6
GC C A B CD E
W6

W6

167
5 2 1 2

167
A B CD E RB
PC PC
2 1 2 1 cu RB P1
P1

PC
3 PC PC
3

40
PC

40
P1 P1
949

Pool Office
A B CD E
CWSD TC CWSD
Pool Office TC CWSD TC CWSD
3 1 2 1 TC cu cu
cu cu
65 M 2
PC TC cu 1,333 PC TC cu
A B CD E
3 1 2 1
cu PC TC PC TC cu cu
PC TC PC TC cu
DB CWSD 65 M 2 DB

520
CWSD
520

DL DL

460

500
460

500
CWSD CWSD CWSD
CWSD cu cu
cu cu
cu
cu cu
cu PC cu
PC
TC
TC TC PC
PC TC PC TC PC TC CWSD CWSD
CWSD CWSD TC TC
TC TC

CWSD CWSD CWSD


CWSD PC PC
PC PC DB DB DB
RB DB DB DB RB RB RB RB RB RB RB RB

4
RB RB RB RB RB RB RB

40
40

W8 W4 W4 W4 W4 W4 W4 W8 W8 W4 W4 W4 W4 W4 W4 W8

(GENERAL STAFFS OFFICE) (GENERAL STAFFS OFFICE)


THIRD FLOOR PLAN FOURTH FLOOR PLAN
SC 1/100 SC 1/100

GSPublisherVersion 0.0.100.100
A B C D A B C D
255 1,373
255 1,373
275 500 333 500
18 93 10 162 500 333 500
10 93 10 142 40 137 147 147 147 147 147 147 137 40
13 90 10 142 40 137 147 147 147 147 147 147 137 40

W4 W4 W4 W4 W4 W4 W8 W4 W4 W4 W4 W4 W4 W8
1
D7
D7
1

40
GB DB DB DB RB DB RB RB RB RB
RB DB DB RB DB RB DB RB DB RB RB
GB
WC WC WC PL
PD KS WC WC
PD PD PC WC
C PC
Emergency PD PD C

A B CD E
B
DP
Exit
KC

252
2 1 4 1
HD OD ST
EOD
P2
C

332
CM CH P2
A B CD E
2 1 4 1
GC A B CD E
A B CD E
Office A B CD E A B CD E

460

500
EOD 4 3 3 - - RE

460

500
4 3 3 4 3 3 4 3 3

488
A B CD E
C 5M2 5M2 5M2
A B CD E
10 M 2 3 1 2 1
B B
10 M 2 kitchenette 3 1 2 1
5M2

80
SD
B B
DB HD P1
D6
D5 D4 P1
D5 D5
158 15 251 70 15 225 80 10 16

12
D4 Duputy Director office
Corridor 335 163 12D4 498
2
20 M A B CD E
3 1 2 1 Corridor
A B CD E

2
20 M 2

2
25 M 2 P2 DB 3 1 2 1

40
D4

309
32 M 2
PC RB

12
813 12 107 80 322
W6

167
C
D4 RB

W6

167
W6

W6
449
A B CD E
3 1 2 1 SD P2

1,334
+14.00
W9

293

1,334
P2
15 M 2

W9

293
D4

286
C

12
GC
W6

D4 PC RB

W6
A B CD E DP

W6

W6
167
5 2 1 2 - A B CD E Director Secretary

167
A B CD E RB A B CD E
P1 Director Secretary
2 1 2 1 5 2 1 2 -
2 1 2 1 1 A B CD E SD
DB P1 3 1 2 1
D6
3 D3 16 M 2
3

40
CWSD

CWSD
P1 P2

40
12
PC PC P1

332
DB P1
CWSD CWSD
Meeting room GC
PC A B CD E DP

PC
3 1 2 1
TC

TC
827 12
TC TC
40 M 2

P1 DB

Pool Office D4

12
TC TC P1
TC TC TC TC PC

460

500
A B CD E

488
Office

460

500
MT
3 1 2 1
PC A B CD E OD
CWSD CWSD CWSD 40 M 2 CWSD C
PC PC PC PC CWSD CWSD PC 3 1 2 1

PC 15 M 2

296
PC PC PC PC PC CWSD
CWSD CWSD CWSD CWSD CWSD

C
TC DP
TC TC TC TC
TC

RB DB RB RB RB DB RB RB RB DB RB DB

4
RB RB RB RB RB RB RB RB

4
40

40
W8 W4 W4 W4 W4 W4 W4 W8
W8 W4 W4 W4 W4 W4 W4 W8

(DEPUTY DIRECTOR OFFICE) ( DIRECTOR OFFICE)


FIFTH FLOOR PLAN SIXTH FLOOR PLAN
SC 1/100 SC 1/100

GSPublisherVersion 0.0.100.100
A B C D
A B C D
255 1,373

255 1,373 275 500 333 500

275 500 333 500 10 93 10 157 10 172 147 147 147 147 147 147 137 40

10 93 10 142 40 137 147 147 147 147 147 147 137 40

W7 W7 W7 W7 W7 W7 W1
D7
1

40
W4 W4 W4 W4 W4 W4 W8

1
RB RB RB RB RB
D7 RB DB DB

40
C
KS WC WC TC TC
GB RB DB DB DB RB DB RB RB DB RB RB PC
C CWSD
GB
WC WC WC TC TC
Emergency PD PD C
PD CWSD
Emergency
PD PD C PC
Exit KC DP
OD CWSD PC PC
Exit B
DP A B CD E DL
CWSD PC CM C
CWSD PC 2 1 4 1 PC PC
HD
A B CD E DL CWSD
C A B CD E A B CD E
2 1 4 1 PC PC 4 3 3 - - RE Office GC
Pool Office

460

500
CWSD 4 3 3

489
A B CD E Office GC Pool Office 5M 2 A B CD E
TC
A B CD E
TC
CWSD

460

500
B C
4 3 3 kitchenette 3 1 2 1 3 1 2 1

500
A B CD E A B CD E CWSD
2 C 3 1 2 1
TC
3 1 2 1 TC 12 M 2 25 M 2
10 M
12 M 2 40 M 2 D5 D5 D4
B B P1 C
SD

12
336 12 232 87 10 498
D5 D4 TC TC
P1
Corridor
324 424 80 12 493 15 M 2 P1
CWSD CWSD
P1 PC PC

2
23 M 2

40
Corridor

8 12
2
TC TC
P1

40
480 40 293 12 175 333
RB
D6

15

90

167
CWSD CWSD

W6

W6
PC PC DP
D6
Secretary

167
W6

90
449

W6
RB C
+19.60 PC PC

1,334
W9
CWSD CWSD

293
A B CD E
3 1 2 1
W9

OD

1,334
293
A B CD E
16 M 2

210
2 1 2 1 TC TC A B CD E
C

W6

W6
5 2 1 2 - GC

167
188
W6

A B CD E

W6
A B CD E 2 1 2 1

167
RB P1 RB
5 2 1 2 -

40
P2
D3
3
12

40
DB DB

150 520
A B CD E
3 1 2 1
64 M 2
VOID TO 7th FLOOR

460

500
488

460

500
CT

Meeting room

40
DB DB
RB RB RB RB RB RB RB RB

4 W1 W7 W7 W7 W7 W7 W7 W1
40

W8 W4 W4 W4 W4 W4 W4 W8

(GENERAL STAFFS OFFICE)


(MEETING ROOMS)
SEVENTH FLOOR PLAN EIGHTH FLOOR PLAN
SC 1/100 SC 1/100

GSPublisherVersion 0.0.100.100
A B C D
B C
A B C D

1373
20 20
1333

20
20

1 Copper down pipe Copper down pipe

ROOF SECTION A:A


SC 1:100
2%
SL
O
PE
SL
O PE 4 3 2 1
2% A

2
TERRAZZO FINISH
1333
1293

1293

1333
TERRAZZO FINISH

ROOF SECTION B:B


SC 1:100
3
1 2 3 4
PE
O
SL

2%
2%

SL
OP
E

Copper down pipe Copper down pipe


4
20
20

1333 20
20
1373
ROOF SECTION C:C
B B SC 1:100

ROOF PLAN
SC 1:100
th th
9 FLOOR 9 FLOOR

w1 w7 w7 w7 w7 w7 w7 w1 w1 w7 w7 w7 w7 w7 w7

D7

th th
8 FLOOR 8 FLOOR

w8 w4 w4 w4 w4 w4 w4 w8 w4 w4 w4 w4 w4 w4
w8

D7

th th
7 FLOOR 7 FLOOR

w8 w4 w4 w4 w4 w4 w4 w8 w8 w4 w4 w4 w4 w4 w4

D7

th th
6 FLOOR 6 FLOOR

w8 w4 w4 w4 w4 w4 w4 w4 w4 w4
w8 w8 w4 w4 w4

D7

th th
5 FLOOR 5 FLOOR

w8 w4 w4 w4 w4 w4 w4 w8 w8 w4 w4 w4 w4
D8 D8

D7

th th
4 FLOOR 4 FLOOR

w8 w4 w4 w4 w4 w4 w4 w8 w8 w4 w4 w4 w4 w4 w4

D7

rd rd
3 FLOOR 3 FLOOR

w8 w4 w4 w4 w4 w4 w4 w8 w8 w4 w4 w4 w4 w4 w4

D7

nd nd
2 FLOOR 2 FLOOR

w9 w4 w4 w4 w4 w4 w4 w8 w8 w4 w4 w4 w4 w4 w4

D7

st st
1 FLOOR 1 FLOOR

w8 w4 w4 w4 w4 w4 w4
D2 D1 W3 W3 W3 W3 W3 W3

D7

GROUND FLOOR

w4 w4 w4 w4
GROUND FLOOR
D7

1 BASEMENT
FRONT SIDE ELEVATION
SC 1/100 w4 w4 w4 w4 w8

2 BASEMENT

rd
3 BASEMENT

REAR SIDE ELEVATION


SC 1/100
th th
9 FLOOR 9 FLOOR

W5 W5 W5 W5

W6 W6 W6 W6

th W5 W5 W5 W5 th
8 FLOOR 8 FLOOR

W6 W6 W6 W6

W5 W5 W5 W5

th W6 W6 W6 W6 th
7 FLOOR 7 FLOOR

W5 W5 W5 W5

W6 W6 W6 W6

th W5 W5 W5 W5 th
6 FLOOR 6 FLOOR

W6 W6 W6 W6

W5 W5 W5 W5

th W6 W6 W6 W6 th
5 FLOOR 5 FLOOR

W5 W5 W5 W5

W6 W6 W6 W6

th W5 W5 W5 W5 th
4 FLOOR 4 FLOOR

W6 W6 W6 W6

W5 W5 W5 W5

rd W6 W6 W6 W6 rd
3 FLOOR 3 FLOOR

W5 W5 W5 W5

W6 W6 W6 W6

nd W5 W5 W5 W5 nd
2 FLOOR 2 FLOOR

W6 W6 W6 W6

W5 W5 W5 W5

W6 W6 W6 W6 st
st 1 FLOOR
1 FLOOR

W5 W5 W5 W5

W6 W6 W6 W6

W5 W5 W5 W5
GROUND FLOOR GROUND FLOOR

W6 W6 W6 W6

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION


SC 1/100
SC 1/100
window schedule

window name W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11
quantity 3 2 6 96 34 36 12 21 8 4 7

frame material aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame
frame finish Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Golden aluminium surface Brushed natural aluminium surface
glazing 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick clear glass 6mm thick frosted fire rated glass
Size 130 x 140 138 x 168 138 x 395 138 x 140 130 x 38 130 x 38 138 x 276 137 x 140 66 x 210
Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken
NOTE for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy for more accuracy

34

38

38
134
130 130

136
140
138
136
140

138

136
140
168

40
206
210
276
69 69

27
65 65 138 69 69

280
290
130 138 152

396
69 69
138

138
62

51
66

42
138 34

152

40
69 69
138

door schedule

door name D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8

quantity 1 1 10 15 19 3 10 2

frame material aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame aluminium frame

frame finish Golden aluminium surface brushed natural aluminium surface brushed natural aluminium surface brushed natural aluminium surface brushed natural aluminium surface brushed natural aluminium surface Golden aluminium surface Golden aluminium surface

door leaf material 6mm thick translucent glass 6mm thick translucent glass solid, 40mm white veneered plywood solid, 40mm white veneered plywood solid, 40mm white veneered plywood solid, 40mm white veneered plywood 6mm thick translucent glass 6mm thick translucent glass

one coat of primer (420 BN 36054 antirust one coat of primer (420 BN 36054 antirust one coat of primer (420 BN 36054 antirust one coat of primer (420 BN 36054 antirust
door leaf finish paint) with two coats (Kadilux 116 mat BN paint) with two coats (Kadilux 116 mat BN paint) with two coats (Kadilux 116 mat BN paint) with two coats (Kadilux 116 mat BN
31688) applied with spray. 31688) applied with spray. 31688) applied with spray. 31688) applied with spray.

NOTE Site measurment should be taken Site measurment should be taken Site measurment should be taken Site measurment should be taken
for more accuracy for more accuracy for more accuracy for more accuracy
50

50

50
74

74

95

95
75

75

210

210
30

30
210

210

210

210

50

50
396

396
100

100

35

35
30

30

180 80 69 68
137 147
70 90
80

80
33

33

69 69 65 65
138 130

window schedule

window name W-1


1333
quantity 3 5 59 5 95 5 95 5 95 5 95 5 95 95 5 95 5 95 5 95 5 95 5 95 5 95 5 64 5

frame material aluminium frame


frame finish Golden aluminium surface
90

glazing 6mm thick clear glass


Size 1333 x 2050
115

Site measurment should be taken


NOTE for more accuracy

Only upper part glazed


351

15 156 5 78 5 78 15

wet resistant suspended


GB DB DB DB
gypsum celing
GB
WC WC WC
PD
a PD PD a
900 mm x 1550 mm wide
silvered float glass mirrors with
B
233

cp mirror screws
c c
HD Hand drier
soap dispenser
A B CD E Basin
4 3 3 - -

b 10 M 2 b
60

Toilet foot wash area


20
10

30
20
110

60

foot wash B B
SD DB HD
D5 section b-b
114 152 70
sc. 1:25
toilet detail plan
sc. 1:25

wet resistant suspended wet resistant suspended


gypsum celing gypsum celing
Ceramic tiles

melamine laminated panal


partion
melamine laminated panal
partion

section c-c
section a-a sc. 1:25
sc. 1:25
10
93

20
20

137

10
10

SC 1/20
stair plan
93
93

10
10

132
157
a a

10
10
147

182
10

100
1 1 1

SC 1/20
1 1 1 1 1
14 1 38 1 38 1
1 1
53
14 9 9 9 9 9 9 18 9 9 9 19 114

stair Elevation
A

18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
8th floor

rd
7th floor

2nd BASEMENT
1st BASEMENT

3 BASEMENT
20*10 cm RSH

steel hand rails

20*10 cm RSH

SC 1/20
stair section a:a

18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
8th floor

7th floor
steel grills

2nd BASEMENT
1st BASEMENT
steel Hand rails
20*10 cm RSH
galvanized iron coping flash
sheet coping 50mm x 100mm x 2mm
horiz. aluminium RHS screwd to angle iron

Terrazzo Finish
water proofing
bonding adhesive
50mm x 100mm x 2mm vertical aluminium RHS
screwed to horiz. aluminium RHS

Terrazzo Finish
lean concrete water proofing strainer angle iron bolted to slab

rc slab expandable bolts


bonding adhesive

100mm copper down pipe


lean concrete RC slab

Roof Down pipe detail


Roof Aluminum window connection detail
Roof detail sc. 1:10
sc. 1:10
sc. 1:10

Furniture Legend
Furniture Equipment Miscelaneous
Office CWSD Corner work Station Desk 160 DL Desk Light 15 RB Roller Blindes 190
TC Task Chair 140 DP Desk Phone 25 DB Dust Bin 60
C Cabinate(40 *100*100 cm ) 42 PC Personal Computer 185
GC Guest Chair 24 FX Fax Machine 8
SD Secratery Desk(set) 8 PCM Photo Copy Machine 8
OD Office Desk (set) 14
LC Lounge Chair(set) 1
CT Conferance Table (set) 1
MT Meeting Table(set) 1 260 cm
EOD Excutive Office Desk(set) 2
CT Coffe Table 1
Waiting Couch 1

Reception ID Information Desk(set) 1 PC Personal Computer PL Planter 2


WC Waiting Couch 1 DP Desk Phone RB Roller Blindes 3
WC DB Dust Bin 1

Store HC Cabinate(200*100*100 cm) 26

Corridor C Cabinate(40 *100*100 cm ) 24

Kitchenette
KS Kitchen Sink 5 CM Coffe Maker 5
KC Kitchen Cabinate 5 partition wall vertical section
RE Refrigerator 4 sc. 1:25

Toilet WC Water Closet 29


GB Grab Bar 8
HD Hand Drier 20
SD Soap Dispenser 20
PD Paper Dispenser 24
B Basin 24
DB Dust Bin 29

Finishing schedule 1 2 3 4 5
Floor A Light blue(legon) Linoleum Floor Light Gray Linoleum Floor Ivory linoleum Floor 200 *200 *15 cm White Ceramic tile 300 *300 *30 cm White marble tile
Skirting B Black linonium 100 mm high gray marble 100 mm high White Ceramic
Wall C White Gypsum plaster and paint partitioning wall 200 *200 *15 cm White Ceramic tile plaster and White paint Gypsum Board
Ceiling D Suspended gypsum board Plastere & White painted RC slab Moisture resistant suspended board
Sill E 11 mm thick gray porcelain

Legend

p1 Half glazed Partitioning wall


p2 Partition wall

You might also like