Professional Documents
Culture Documents
Installation of Stone Work
Installation of Stone Work
We certify that the above submitted items have been reviewed in detail and are correct and in conformity with the Contract Drawings and Specifications
except as otherwise stated;
Section B – Reviewer’s Comments:
Approval Status:
☐ A – Approved
☐ B – Approved as Noted
☐ C – Revise & Resubmit
☐ D – Rejected
☐ R – For Record Only
*Approval shall not relieve the Contractor of his liabilities under the Contract or constitute authorization of any change to the Contract Documents.
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the
drawings and specifications. This review is for general conformance with the design of the project and general compliance with the information given in the
contract document.