Discussion Deck

TM & NAIM
29th August 2017
Affected pole (4) for the relocation work.
And 4 pcs o/h cable

Temporary Relocation Cost at RM45K and additional cost of RM40K for cable damage.
Vocational
Kuching

To Maktab perguruan Batu Lintang

Existing o/h cable to relocate

Affected pole to relocate

Propose route

Propose pole to plant


Bomba
No. of cable affected
50pr IB cable x 2 = 140mtr
20pr IB cable x 1 = 140mtr
OFC x 1 – refer OFC team
Existing riser

Propose for riser to install

Developer site ofis


OPTION 1

OPTION 2

OPTION 3
PROPOSED SOLUTION FOR RELOCATION AND UNIFI SERVICES FOR
SAPPHIRE DEVELOPMENT
Option 1 (
To relocate existing Temporary TM cable (near Bomba) to the original plan at
Jalan Batu Lintang and to provide Unifi Services. Cost is RM2.56Mill
Challenges: Way Leave issues, if unifi required cable route need to tap from Unifi infra
ready at Traffic Light in front Wisma Saberkas that will cost more.
Option 2
To use new road from cabinet TM office crossing Jalan Bt Lintang. Costing will be
RM1.86 Million (Relocate & Unifi Services)
Challenges: Way Leave issues, if unifi required cable route need to tap from Unifi infra
ready at Traffic Light in front Wisma Saberkas that will cost more.
Option 3
To use Jalan Rock for the relocation and unifi services that will cost at RM685K with the
Following condition:
- NAIM will do all the civil Work from Jalan Rock
- TM will lay Fiber Cable from Jalan Rock and along this new access road
- TM will install a new IPMSAN at nearby Jalan College Jalan Nangka to take over all
distribution Cable at this area
Challenges: Very much depending on NAIM decision on the new road access.

OPTION 1