You are on page 1of 64

PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG

BILL 2 - PILING WORKS (ALL PROVISIONAL)

Ref Description Unit Qty

PILING

APPROVED PRECAST REINFORCED CONCRETE PILE


(ALL PROVISIONAL)

Note:

A Payment for the supply length of pile


shall be in full based on the total
length supplied and used in the works
including cut-off lengths

B Payment for the driven length of pile


shall be measured from the toe of the
pile to the cut off level

C Should the lengths of the pile used for


initial/extension piles ordered by the
Contractor before carrying out the test
piling be disapproved by the Architect,
the Contractor shall replace these piles
at his own cost. As such, the Contractor
shall allow for compliance with this
clause in his work programme and no claim
for extension of time or loss and
expenses will be entertained

D This Bill is to be read in conjunction


with the specification and preamble to
all trade provided

E The Contractor shall prepare and submit


immediately after completion the As-Built
Survey Plans indicating the location and
position of the entire Piling works
certified by a Licensed Surveyor

F The Contractor shall submit piling records


to the Architect/Engineer's
representative in appropriate format

Piling Records

G The Contractor shall maintain and submit Item 1


the piling records which indicates the
date of pile driving, reference of pile,
length driven, cut-off level and other
data which may be required

Page : 2/PI/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 2 - PILING WORKS (ALL PROVISIONAL)

Ref Description Unit Qty

PILING (Cont'd)

Piling Equipment

A Allow for the provision of necessary Item 1


piling equipment, plant, tool, ancillary
equipment and for their transportation to
the site, handling, assembling, moving
about on the site as required and removal
from the site after completion of the
works and for any idle standing time, all
as required for boring/drilling pile at
various location. This item shall also
including any excavation, filling earth
to make up levels and staging required
for moving of plant over different level
on site

Surface Water Drainage

B Supply, deliver and unload to site 150mm x No 21


150mm precast reinforced concrete pile
6.00m long as initial pile including all
required moulds, reinforcement, pile shoe
and joint/head strengthening

C Drive 150mm x 150mm precast reinforced m 126


concrete pile to the required set

D Cutting and breaking away head of 150mm x No 21


150mm precast reinforced concrete pile at
required level with reinforcement bar
exposed and cast into pile cap

Retaining Wall

E Supply, deliver and unload to site 200mm x No 48


200mm precast reinforced concrete pile
6.00m long as initial pile including all
required moulds, reinforcement, pile shoe
and joint/head strengthening

F Drive 200mm x 200mm precast reinforced m 288


concrete pile to the required set

G Cutting and breaking away head of 200mm x No 48


200mm precast reinforced concrete pile at
required level with reinforcement bar
exposed and cast into pile cap

Page : 2/PI/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 2 - PILING WORKS (ALL PROVISIONAL)

Ref Description Unit Qty

PILING (Cont'd)

BAKAU PILING

Piling Equipment

A Allow for provision of necessary piling Item 1


equipment, plant, tool, ancillary
equipment and for their transportation to
the site, handling, assembling, moving
about on the site as required and removal
from the site after completion of the
works and for any idle standing time.
This item shall also including any
excavation, filling earth to make up
levels and staging required for moving of
plant over different level on site and
preparation of piling records

Surface Water Drainage

B Supply only 100mm diameter Bakau piling No 7777


5.50m long as initial pile including all
necessary handling, transporting and
pitching

C Drive only 100mm diameter Bakau pile m 42745

D Cutting and breaking away head of 100mm No 7777


diameter Bakau piling at the required
level

BELIAN PILING

Piling Equipment

E Allow for provision of necessary piling Item 1


equipment, plant, tool, ancillary
equipment and for their transportation to
the site, handling, assembling, moving
about on the site as required and removal
from the site after completion of the
works and for any idle standing time.
This item shall also including any
excavation, filling earth to make up
levels and staging required for moving of
plant over different level on site and
preparation of piling records

External water supply

F Supply only 100mm diameter Belian piling No 8


3.60m long as initial pile including all
necessary handling, transporting and
pitching

Page : 2(ADDM1)/PI/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 2 - PILING WORKS (ALL PROVISIONAL)

Ref Description Unit Qty

PILING (Cont'd)

A Supply only 100mm diameter Belian piling m 22


3.60m long as extension pile including
all necessary handling, transporting and
pitching (In No. 6)

B Drive only 100mm diameter Belian pile m 50

C Labour and material for jointing 100mm No 6


diameter extension pile including placing
in position and jointed with approved
pipe sleeve including all necessary
accessories

D Cutting off head of 100mm diameter Belian No 8


pile at the required level

Page : 2/PI/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 2 - PILING WORKS (ALL PROVISIONAL)

Ref Description

COLLECTION

Page : 2/PI/1

Page : 2/PI/2

Page : 2(ADDM1)/PI/3

Page : 2/PI/4

Page : 2(ADDM1)/PI/5
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

DEMOLITION WORKS

GENERAL NOTES

A The Contractor shall ensure that debris


from the demolition do not fall or hit on
undesirable places, traffic, equipment,
personnel and commuters. Care is to be
taken to minimize the noise and dust
nuisance due to the demolition works

B The Contractor shall submit before the


commencement of any demolition works his
proposed method statement, sequence of
demolition and any other requirement
which he may need to perform the works
all to be approved and to the
satisfaction of the Architect

C Rates for all works for the Demolition


shall include for all labour, plant and
material, temporary shoring, needing
protection, etc., providing sufficient
working space and temporary works
necessary in connection therewith and for
carting away all debris and rubbish, and
for any and all making good

D The Contractor shall be wholly responsible


for any damage to any existing and/or new
service pipes, cables, fittings, etc.
during the progress of the works. Any
damage shall be made good at his own cost
and to the satisfaction of the Architect

E The Contractor shall note that before


proceeding with the demolition works, he
shall take all necessary procedure to
cover up, protect and/or remove with
permission all items in the way of the
demolition work and shall reinstate to
the original positions and conditions
after the works all to the satisfaction
of the Architect

F Dimensions and size stated in the


descriptions are only approximate and the
Contractor shall ascertain for himself
and check on site and allow in his rate
for any discrepancies found. In
particular, the Contractor shall
ascertain to his own satisfaction the
extend of works 'underground', or hidden,
and allow for all and any of these
contingencies

Page : 4(ADDM1)/DM/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

DEMOLITION WORKS (Cont'd)

A The Contractor shall take note that the


extend of demolition shall be strictly
adhered to. Should the Contractor
demolish to a larger area than required
then he shall make good all disturbed
area to its original condition at his own
cost all to the satisfaction of the
Architect

B Contractor is to note that certain


existing facilities and services may be
retained and he shall exercise great care
to protect these facilities and services,
compensate the Employer at his own
expense in the event that these
facilities and services are disturbed
and/or destroyed

DEMOLISH EXISTING CIVIL AND SITE WORKS AND


ALL ITS ASSOCIATED WORKS AND SERVICES
INCLUDING TOUCHING UP AND REINSTATE ALL
DISTRUBED AREAS, TERMINATE OR DIVERT
CONNECTING SERVICES, GRABBING UP
FOUNDATION, FILLING VOID WITH APPROVED
SELECTED MATERIAL AND REMOVE ALL
DEMOLISHED METERIAL FROM SITE TO THE
CONTRACTOR'S OWN TIP ALL TO THE
SATISFACTION OF THE ARCHITECT

Partially demolish and hack off the


following existing works and its
associated works and services including
touching up and reinstate all disturbed
areas, terminate or divert connecting
services, grabbing up foundation, filling
void with approved selected material and
remove all demolished/hacked off material
from site to the Contractor's own dump
all to the satisfaction of the Architect

C Hack-off existing 1000mm wide open drain Item 1


overall size 1300mm x 150mm x 1930mm deep
including exposing existing rebars with
minimum lap length of 45 times diameter
or drill with minimum anchorage depth of
100mm HILTI-HIT HY150 injections or
approved equivalent all as per Drawing
No. MS12345/06/CE/D-08 Rev. A

Page : 4(ADDM1)/DM/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

DEMOLITION WORKS (Cont'd)

A Hack-off existing 1100mm diameter pipe Item 1


culvert overall size 1100mm x 230mm x
1595mm high including exposing existing
rebars with minimum lap length of 45
times diameter or drill with minimum
anchorage depth of 100mm HILTI-HIT HY150
injections or approved equivalent all as
per Drawing No. MS12345/06/CE/D-06 Rev. A

B Hack-off existing twin box culvert overall Item 1


size 2100mm x 4950mm x 2140mm deep
including exposing existing rebars with
minimum lap length of 45 times diameter
or drill with minimum anchorage depth of
100mm HILTI-HIT HY150 injections or
approved equivalent all as per Drawing
No. MS12345/06/CE/D-07

Page : 4(ADDM1)/DM/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/DM/1

Page : 4(ADDM1)/DM/2

Page : 4(ADDM1)/DM/3

Page : 4(ADDM1)/DM/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK

NEW ROAD AND CAR PARK

A Excavate for road and car park maximum m3 193


depth not exceeding 1.00m deep commencing
from existing ground level, get out and
cart away from site to Contractor's own
dump pit as directed by the Architect

B Excavate for road and car park maximum m3 683


depth not exceeding 2.00m deep commencing
from existing ground level, get out and
cart away from site to Contractor's own
dump pit as directed by the Architect

C Excavate for road and car park maximum m3 844


depth not exceeding 4.00m deep commencing
from existing ground level, get out and
cart away from site to Contractor's own
dump pit as directed by the Architect

D Approved filling with excavated material m3 1,720


from site, spread, levelled, well
compacted and consolidated in approved
layers to the required level

E Selected imported earth fill thoroughly m3 3,632


compacted in approved layers to the
required level

F Labour for trimming, levelling, grading m2 2,822


and rolling sub-grade (CBR 5%) as
described to the required gradient,
slope, cambers and curves to an even
surface with an approved road roller

G 300mm Thick sub-base course with 75mm down m2 2,822


crusher run laid to the required
gradient, slope, cambers and curves to an
even surface with an approved road roller

H 150mm Thick base course with 37.5mm down m2 2,822


crusher run laid to the required
gradient, slope, cambers and curves to an
even surface with an approved road roller

I Prepare and apply 1 layer bituminious m2 2,840


prime coat as specified

J 50mm Thick approved binder course, spread m2 2,840


and levelled to the required falls and
cambers and rolled with an approved road
roller

Page : 4(ADDM1)/RC/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

A Prepare and apply 1 layer bituminious tack m2 180


coat as specified

B 50mm Thick approved wearing course, spread m2 180


and levelled to the required falls and
cambers and rolled with an approved road
roller

UPGRADING ROAD AND CAR PARK

C Excavate for upgrading road and car park m3 234


maximum depth not exceeding 1.00m deep
commencing from existing ground level,
get out and cart away from site to
Contractor's own dump pit as directed by
the Architect

D Labour for trimming, levelling, grading m2 437


and rolling sub-grade (CBR 5%) as
described to the required gradient,
slope, cambers and curves to an even
surface with an approved road roller

E Labour for trimming, levelling, grading m2 298


and rolling sub-grade (CBR 30%) as
described to the required gradient,
slope, cambers and curves to an even
surface with an approved road roller

F 300mm Thick sub-base course with 75mm down m2 150


crusher run laid to the required
gradient, slope, cambers and curves to an
even surface with an approved road roller

G 100mm Thick base course of 38mm compacted m2 1,509


down crusher run (CBR 50%) laid to the
required gradient, slope, cambers and
curves to an even surface with an
approved road roller

H 150mm Thick base course with 37.5mm down m2 150


crusher run laid to the required
gradient, slope, cambers and curves to an
even surface with an approved road roller

I Prepare and apply 1 layer bituminious m2 1,659


prime coat as specified

J 50mm Thick approved binder course, spread m2 150


and levelled to the required falls and
cambers and rolled with an approved road
roller

Page : 4(ADDM1)/RC/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

A Prepare and apply 1 layer bituminious tack m2 150


coat as specified

B 50mm Thick approved wearing course, spread m2 1,659


and levelled to the required falls and
cambers and rolled with an approved road
roller

C Cutting and bonding new road to the m 69


existing road including making good

RE-SURFACE EXISTING ROAD AND CAR PARK

D Scarify and remove existing road surface m2 2,863


to receive new works all to the approval
of the Architect

E Prepare and apply 1 layer bituminious m2 2,863


prime coat

F 40mm Thick approved wearing course as m2 2,863


described, spread and levelled to the
required falls and cambers and rolled
with an approved road roller

PRECAST CONCRETE GRADE 25 INCLUDING ALL


MOULDS, FINISHED FAIR ON ALL FACES,
STORED AND FIXED IN POSTITION, BEDDED AND
POINTED IN CEMENT AND SAND (1:3)

Road Kerb

G 150mm x 550mm x 600mm Long precast m 610


concrete road kerb with chamfered top at
one side including drain sump of 300mm x
150mm opening at 3000mm centres set at
edge of road with and including
reinforced concrete Grade 25 benching
reinforced with one layer of BMC A6 mesh
reinforcement complete with approved type
black and white colours alternatively to
exposed kerb including all necessary
excavation, cart away and formwork as per
Drawing No. MS12345/06/CE/D-01 Rev. A

H 150mm x 550mm Precast concrete road kerb m 144


in appropriate lenghts set at edge of
road all as before described but curved
on plan to variying radii

Page : 4(ADDM1)/RC/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

Discharge Pipe

A 200mm Diameter uPVC discharge pipe laid to m 809


fall under ground with one end cast in
kerb and the other end cast into concrete
drain wall including all necessary
excavation, cart away, part return, all
as per Drawing No. MS12345/06/CE/D-01
Rev. A

B 200mm Diameter uPVC discharge pipe, 150mm No 8


long cast through concrete drain cover
slab

C 200mm Diameter uPVC discharge pipe, 200mm No 15


long cast through concrete drain cover
slab

D 200mm Diameter uPVC discharge pipe, 230mm No 18


long cast through concrete drain cover
slab

E Extra over 200mm diameter uPVC discharge No 222


pipe for bend

Sump cover

F Overall size 400mm x 200mm concrete sump No 222


cover generally fabricated of 300mm x
150mm x 65mm thick concrete grating cover
including forming 4 Nos. of 38mm x 100mm
opening, reinforced with and including
6mm steel bar set on precast concrete
road kerb sump (measured separately) all
as per detailed Drawing No.
MS12345/06/CE/D-01 Rev. A

ROAD DEMARCATION LINE SHALL COMPLY WITH


APPROVED COLOUR ALL IN ACCORDANCE WITH
JKR ARAHAN TEKNIK (JALAN/2D/85)
REQUIREMENTS ALL AS PER DRAWING
NO.MS12345/06/LM/D-01

G Prepare and apply 3mm thick thermoplastic m 55


road paint to 100mm wide lane line in
approved colour

H Prepare and apply 3mm thick thermoplastic m 735


road paint to 100mm wide lane line with
1700mm spacing in approved colour

I Prepare and apply 3mm thick thermoplastic m 307


road paint to 200mm wide give way line
with 300mm spacing in approved colour

Page : 4(ADDM1)/RC/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

A Prepare and apply 3mm thick thermoplastic m 959


road paint to 100mm wide inner road edge
line in white colour

B Prepare and apply 3mm thick thermoplastic m 1,310


road paint to 100mm wide outer road edge
line in yellow colour

C Prepare and apply 3mm thick thermoplastic m 28


road paint to 300mm wide stop line in
approved colour

D Prepare and apply 3mm thick thermoplastic No 1


road paint to straight and left turning
directional arrow in approved colour

E Prepare and apply 3mm thick thermoplastic No 1


road paint to straight and right turning
directional arrow in approved colour
(Type B)

F Prepare and apply 3mm thick thermoplastic No 28


road paint to straight directional arrow
in approved colour (Type A)

G Prepare and apply 3mm thick thermoplastic No 3


road paint to left turning directional
arrow in approved colour (Type C)

H Prepare and apply 3mm thick thermoplastic No 1


road paint to right turning directional
arrow in approved colour

I Prepare and apply 3mm thick thermoplastic No 4


road paint to left and right turning
directional arrow in approved colour
(Type D)

ROAD SIGN

J BERHENTI' Sign in approved word size and No 6


colour including sign plate, post, mild
steel plate and mass concrete Grade 15
footing, excavation, cart away and
formwork as per Drawing No.
MS12345/06/LM/D-02

Page : 4(ADDM1)/RC/5
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

TRAFFIC BOLLARD

A 100mm Diameter x 1050mm long galvanised No 65


iron pipe bollard with 750mm high exposed
and painted with approved gloss paint in
black and white paint finish, embedded
300mm deep into 250mm x 250mm x 300mm
concrete pad Grade 25 reinforced with a
layer of BMC A7 mesh including all
necessary excavation, cart away, formwork
and concrete infilled into bollard for
forming dome shaped on top all as per
Drawing No. MS12345/06/CE/CS-04 Rev. A

APPROVED GALVANISED IRON PIPE RAILING ALL


BOLTED AND FILLET WELDED TOGETHER
INCLUDING ALL NECESSARY FITTINGS, SHOP
AND SITE WELDING, FILLING SMOOTH
JUNCTIONS AND FIXING ACCESSORIES ALL TO
THE APPROVAL OF THE ARCHITECT

B 900mm High (exposed) railing generally m 862


fabricated of 62mm diameter CHS handrail
welded to 62mm diameter CHS pipe supports
at 2000mm centres, infilled with 62mm
diameter CHS horizontal infill all welded
together with 6mm thick fillet weld with
bottom end welded to 100mm x 140mm x 9mm
thick GI plate with 4 Nos. of 14mm
diameter pre-drilled hole and fixed with
4 Nos. of 150mm long 12mm diameter black
bolts, nut and washers into concrete
drain wall (measured separately),
complete with approved finishing of black
and white color and fixing accessories
all as per Drawing No. MS1234/06/CE/D-10
Rev. A

GUARD RAIL ALL AS PER DRAWING NO.


MS12345/06/CE/D-10 REV. A

C Approved galvanised steel W-shape guard m 30


rail of overall sectional size 312mm deep
x 83mm wide complete with 1 No. 16mm
diameter post bolt and nut with 19mm x
64mm slotted hole at 1905mm centres and 8
Nos. 16mm diameter galvanised splice bolt
and nut with 23mm x 29mm slotted holes at
3810mm centres all laid to flat and/or
falls and/or curves on plan including
approved painting system in black and
white alternatively

Page : 4(ADDM1)/RC/6
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

ROAD AND CAR PARK (Cont'd)

A Approved galvanised steel W-shape guard No 2


rail end wing of overall size 699mm long
x 312mm x 254mm complete with end curved
panel with and including 1 No. 16mm
diameter post bolt and nut with 19mm x
64mm slotted hole and 8 Nos. 16mm
diameter splice bolt and nut with 23mm x
29mm slotted holes fixed to end of guard
rail including all fixing accessories and
approved painting system in black and
white alternatively

B Approved 356mm x 76mm x 6mm x 730mm Long No 17


galvanised iron C channel post welded
with 10mm thick fillet weld to 335mm x
335mm mild steel base plate with 4 Nos.
of 30mm diameter predrilled hole and
fixed with 2 Nos. of 668mm long 25mm
diameter square bend 'U' bolt, nuts and
washers into reinforced concrete
retaining wall (measured separately)
including all necessary fixing
accessories and painting system all as
per Drawing No. MS12345/06/CE/D-10 Rev. A

Page : 4(ADDM1)/RC/7
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/RC/1

Page : 4(ADDM1)/RC/2

Page : 4(ADDM1)/RC/3

Page : 4(ADDM1)/RC/4

Page : 4(ADDM1)/RC/5

Page : 4(ADDM1)/RC/6

Page : 4(ADDM1)/RC/7

Page : 4(ADDM1)/RC/8
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE

EARTH DRAIN ALL AS PER DRAWING


MS12345/06/CE/D-04

Excavate for earth drain 2400mm wide at


top splayed both sides to 600mm wide at
bottom not exceeding 1.50m deep laid to
fall including all necessary levelling
bottom and triming sloping sides all to
the satifaction of the Architect

Commencing from existing ground level

A Excavate trench with maximum depth not m3 343


exceeding 1.00m deep

Disposal of surplus excavated material

B Load and cart away from site to m3 343


contractor's own dump

CAST IN-SITU DRAIN ALL AS PER DRAWING NO.


MS12345/06/SG/CE/D-03 REV.A

The following in 190.50m long, 300mm wide


open drain (Type OD 300)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

C Excavate trench with maximum depth not m3 53


exceeding 1.00m deep

Disposal of surplus excavated material

D Load and cart away from site to m3 53


contractor's own dump

Vibrated reinforced concrete Grade 25/20


as described

E Drain base, exceeding 150mm and not m3 10


exceeding 300mm thick

F Drain wall, exceeding 100mm and not m3 10


exceeding 150mm thick

Page : 4(ADDM1)/WD/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

A 10mm Diameter rod kg 1,365

Drain wall

B 10mm Diameter rod kg 485

Sawn formwork as described to reinforced


concrete work

C To sides of drain wall m2 295

The following in 33m long, 600mm wide open


drain (Type OD 600)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

D Excavate trench with maximum depth not m3 44


exceeding 2.00m deep

Disposal of surplus excavated material

E Load and cart away from site to m3 44


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

F Not exceeding 100mm thick under drain base m3 1

Mass concrete Grade 15/20 as described

G Not exceeding 300mm thick to drain base m3 3

Vibrated reinforced concrete Grade 25/20


as described

H Drain base, exceeding 150mm and not m3 6


exceeding 300mm thick

I Drain wall, exceeding 100mm and not m3 16


exceeding 150mm thick

Page : 4(ADDM1)/WD/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

A 10mm Diameter rod kg 733

Drain wall

B 10mm Diameter rod kg 1,079

C 12mm Diameter rod kg 623

Sawn formwork as described to reinforced


concrete work

D To sides of drain wall m2 231

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand

E 300mm Diameter half round precast concrete m 33


channel

Weepholes

F Labour and material for forming 50mm No 60


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No.3 wrapped in approved
450mm x 450mm geotextile as filter

The following in 549m long, 1200mm wide


open drain (Type OD 1200)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

G Excavate trench with maximum depth not m3 1


exceeding 1.00m deep

H Excavate trench with maximum depth not m3 497


exceeding 2.00m deep

Page : 4(ADDM1)/WD/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Disposal of surplus excavated material

A Load and cart away from site to m3 498


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

B Not exceeding 100mm thick under drain base m3 41

Mass concrete Grade 15/20 as described

C Not exceeding 300mm thick to drain base m3 78

Vibrated reinforced concrete Grade 25/20


as described

D Drain base, exceeding 150mm and not m3 165


exceeding 300mm thick

E Drain wall, exceeding 100mm and not m3 142


exceeding 150mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

F 10mm Diameter rod kg 22,226

G 12mm Diameter rod kg 4,524

Drain wall

H 10mm Diameter rod kg 15,868

Sawn formwork as described to reinforced


concrete work

I To sides of drain wall m2 2,090

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand
(1:3)

J 300mm Diameter half round precast concrete m 549


channel

Page : 4(ADDM1)/WD/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Weepholes

A Labour and material for forming 50mm No 934


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No.3 wrapped in approved
450mm x 450mm geotextile as filter

The following in 295.50m, 1300mm wide open


drain (Type OD 1300)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

B Excavate trench with maximum depth not m3 488


exceeding 1.00m deep

Disposal of surplus excavated material

C Load and cart away from site to m3 488


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

D Not exceeding 100mm thick under drain base m3 25

Mass concrete Grade 15/20 as described

E Not exceeding 300mm high to drain base m3 51

Vibrated reinforced concrete Grade 25/20


as described

F Drain base, exceeding 150mm and not m3 124


exceeding 300mm thick

G Drain wall, exceeding 100mm and not m3 123


exceeding 150mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

H 12mm Diameter rod kg 26,700

Page : 4(ADDM1)/WD/5
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Drain wall

A 16mm Diameter rod kg 9,686

Sawn formwork as described to reinforced


concrete work

B To sides of drain wall m2 946

C To edge of drain slab, not exceeding 250mm m 296


high

Precast concrete Grade 25 including all


moulds, ginished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand
(1:3)

D 300mm Diameter half round precast concrete m 296


channel

Weepholes

E Labour and material for forming 50mm No 496


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No.3 wrapped in approved
450mm x 450mm geotextile as filter

The following in 58.5m long, 1400mm wide


R.C crossover

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

F Excavate ground beam with maximum depth m3 5


not exceeding 1.00m deep

Disposal of surplus excavated material

G Load and cart away from site to m3 5


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

H Not exceeding 100mm thick under ground m3 1


beam

Page : 4(ADDM1)/WD/6
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Vibrated reinforced concrete Grade 25/20


as described

A Ground beam m3 3

B Crossover slab, exceeding 100mm and not m3 11


exceeding 150mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Crossover slab

C 12mm Diameter rod kg 2,915

Ground beam

D 10mm Diameter rod as stirrup kg 467

E 20mm Diameter rod kg 1,193

Sawn formwork as described to reinforced


concrete work

F To soffit of crossover slab m2 60

G To sides of ground beam m 117

H Labour and material for forming precast m 59


concrete drain cover opening, not
exceeding 250mm thick

Precast concrete Grade 25/20 including all


moulds, finished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand
(1:3)

I 700mm x 700mm x 60mm Thick drain cover No 21


reinforced with 12mm diameter rod welded
to angles complete with approved framing
set on crossover slab

Page : 4(ADDM1)/WD/7
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

The following in 40m long, 250mm x 250mm


deep spoon drain

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

A Excavate trench with maximum depth not m3 7


exceeding 1.00m deep

Disposal of surplus excavated material

B Load and cart away from site to m3 7


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

C Not exceeding 100mm thick under drain base m3 1

Vibrated reinforced concrete Grade 25/20


as described

D Drain base, not exceeding 100mm thick m3 2

E Drain wall, not exceeding 100mm thick m3 2

Mesh reinforcement with 150mm side and end


laps (measured nett and no allowance made
for laps)

F BMC A6 in drain base m2 14

G BMC A6 in drain wall m2 24

Sawn formwork as described to reinforced


concrete work

H To sides of drain wall, not exceeding m 80


250mm high

I To sides of drain wall, exceeding 250mm m 80


and not exceeding 500mm high

Page : 4(ADDM1)/WD/8
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

CAST IN-SITU BOX CULVERT ALL AS PER


DRAWING NO. MS12345/06/CE/D-04

The following in 17m long, 600mm wide


concrete box culvert (Type BC600)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

A Excavate trench with maximum depth not m3 30


exceeding 2.00m deep

Disposal of surplus excavated material

B Load and cart away from site to m3 30


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

C Not exceeding 100mm thick under drain base m3 1

Mass concrete Grade 15/20 as described

D Benching m3 2

Vibrated reinforced concrete Grade 25/20


as described

E Drain base, exceeding 150mm and not m3 3


exceeding 300mm thick

F Drain wall, exceeding 100mm and not m3 4


exceeding 150mm thick

G Drain cover slab, exceeding 150mm and not m3 2


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

H 12mm Diameter rod kg 364

Page : 4(ADDM1)/WD/9
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Drain wall

A 10mm Diameter rod kg 171

B 12mm Diameter rod kg 494

Drain cover slab

C 12mm Diameter rod kg 585

Sawn formwork as described to reinforced


concrete work

D To sides of drain walls m2 69

E To soffit of drain cover slab m2 10

F Labour and material for forming manhole No 7


cover opening 600mm diameter, not
exceeding 250mm thick

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
sotred, hoisted and fixed in position,
bedded and pointed in cement and sand

G 300mm Diameter half round precast concrete m 17


channel

Weepholes

H Labour and material for forming 50mm No 32


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No. 3 wrapped in approved
450mm x 450mm geotextile as filter

Sundries

I 600mm Diameter cast iron heavy duty hinged No 7


manhole cover to B.S.E.N. 124 (weighing
approximately 120kg) and frame all as per
drawing No. MS12345/06/CE/D-04

Page : 4(ADDM1)/WD/10
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

The following in 42m long, 1000mm wide


concrete box culvert (Type BC1000)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

A Excavate trench with maximum depth not m3 61


exceeding 2.00m deep

Disposal of surplus excavated material

B Load and cart away from site to m3 61


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

C Not exceeding 100mm thick under drain base m3 3

Mass concrete Grade 15/20 as described

D Benching m3 7

Vibrated reinforced concrete Grade 25/20


as described

E Drain base, exceeding 150mm and not m3 14


exceeding 300mm thick

F Drain wall, exceeding 150mm and not m3 5


exceeding 300mm thick

G Drain cover slab, exceeding 150mm and not m3 11


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

H 12mm Diameter rod kg 625

I 16mm Diameter rod kg 1,855

Drain wall

J 12mm Diameter rod kg 774

Page : 4(ADDM1)/WD/11
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A 16mm Diameter rod kg 674

Drain cover slab

B 12mm Diameter rod kg 1,702

C 16mm Diameter rod kg 684

Sawn formwork as described to reinforced


concrete work

D To sides of drain wall m2 133

E To soffit of drain cover slab m2 42

F Labour and material for forming manhole No 18


cover opening 600mm diameter, not
exceeding 250mm thick

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
sotred, hoisted and fixed in position,
bedded and pointed in cement and sand

G 300mm Diameter half round precast concrete m 42


channel

Weepholes

H Labour and material for forming 50mm No 72


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No. 3 wrapped in approved
450mm x 450mm geotextile as filter

Sundries

I 600mm Diameter cast iron heavy duty hinged No 15


manhole cover to B.S.E.N. 124 (weighing
approximately 120kg) and frame all as per
drawing No. MS12345/06/CE/D-04

The following in 99.10m long, 1200mm wide


concrete box culvert (Type BC1200)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

J Excavate trench with maximum depth not m3 1


exceeding 1.00m deep

Page : 4(ADDM1)/WD/12
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A Excavate trench with maximum depth not m3 34


exceeding 2.00m deep

B Excavate trench with maximum depth not m3 37


exceeding 4.00m deep

Disposal of surplus excavated material

C Load and cart away from site to m3 73


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

D Not exceeding 100mm thick under drain base m3 8

Mass concrete Grade 15/20 as described

E Benching m3 19

Vibrated reinforced concrete Grade 25/20


as described

F Drain base, exceeding 150mm and not m3 37


exceeding 300mm thick

G Drain wall, exceeding 150mm and not m3 30


exceeding 300mm thick

H Drain cover slab, exceeding 150mm and not m3 29


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

I 12mm Diameter rod kg 2,571

J 16mm Diameter rod kg 3,854

Drain wall

K 12mm Diameter rod kg 3,968

L 16mm Diameter rod kg 1,983

Drain cover slab

M 12mm Diameter rod kg 4,751

Page : 4(ADDM1)/WD/13
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A 16mm Diameter rod kg 1,889

Sawn formwork as described to reinforced


concrete work

B To sides of drain wall m2 289

C To sides of drain wall, exceeding 500mm m 94


and not exceeding 1000mm high

D To soffit of drain cover slab m2 76

E Labour and material for forming manhole No 39


cover opening 600mm diameter, not
exceeding 250mm thick

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
sotred, hoisted and fixed in position,
bedded and pointed in cement and sand

F 300mm Diameter half round precast concrete m 99


channel

Weepholes

G Labour and material for forming 50mm No 180


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No. 3 wrapped in approved
450mm x 450mm geotextile as filter

Sundries

H 600mm Diameter cast iron heavy duty hinged No 39


manhole cover to B.S.E.N. 124 (weighing
approximately 120kg) and frame all as per
drawing No. MS12345/06/CE/D-04

The following in 62m long, 2500mm wide


concrete box culvert (Type BC2500)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

I Excavate trench with maximum depth not m3 346


exceeding 2.00m deep

Page : 4(ADDM1)/WD/14
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Disposal of surplus excavated material

A Load and cart away from site to m3 346


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

B Not exceeding 100mm thick under drain base m3 9

Mass concrete Grade 15/20 as described

C Benching m3 22

Vibrated reinforced concrete Grade 25/20


as described

D Drain base, exceeding 150mm and not m3 55


exceeding 300mm thick

E Drain wall, exceeding 150mm and not m3 46


exceeding 300mm thick

F Drain cover slab, exceeding 150mm and not m3 41


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Drain base

G 12mm Diameter rod kg 2,869

H 16mm Diameter rod kg 6,498

Drain wall

I 12mm Diameter rod kg 1,832

J 16mm Diameter rod kg 8,183

Drain cover slab

K 12mm Diameter rod kg 1,897

L 16mm Diameter rod kg 5,192

Sawn formwork as described to reinforced


concrete work

M To sides of drain wall m2 491

Page : 4(ADDM1)/WD/15
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A To soffit of drain cover slab m2 130

B Labour and material for forming manhole No 22


cover opening 550mm diameter, not
exceeding 250mm thick

Precast concrete Grade 25 including all


moulds, finished fair on all faces,
sotred, hoisted and fixed in position,
bedded and pointed in cement and sand

C 300mm Diameter half round precast concrete m 62


channel

Weepholes

D Labour and material for forming 65mm No 106


diameter UPVC x 150mm long weephole
through concrete wall and complete with
crushed stone No. 3 wrapped in approved
450mm x 450mm geotextile as filter

Sundries

E 550mm Diameter cast iron heavy duty hinged No 22


manhole cover to B.S.497 (weighing
approximately 255kg) and frame all as per
drawing No. MS12345/06/CE/D-04

CAST IN-SITU SUMP ALL AS PER DRAWING NO.


MS12345/06/CE/D-05 REV. B, D-06 REV. B,
D-07 AND D-08 REV. B

The following in 1 No. 1350mm x 1350mm


sump (Sump 1)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

F Excavate sump base with maximum depth not m3 6


exceeding 2.00m deep

Disposal of surplus excavated material

G Load and cart away from site to m3 6


contractor's own dump

Page : 4(ADDM1)/WD/16
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

A Not exceeding 100mm thick under sump base m3 1

Vibrated reinforced concrete Grade 25/20


as described

B Sump base, exceeding 150mm and not m3 1


exceeding 300mm thick

C Sump cover slab, exceeding 100mm and not m3 1


exceeding 150mm thick

D Sump wall, exceeding 150mm and not m3 1


exceeding 300mm thick

E Sump beam m3 1

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

F 12mm Diameter rod kg 26

G 16mm Diameter rod kg 41

Sump wall

H 12mm Diameter rod kg 9

I 20mm Diameter rod kg 31

Sump cover slab

J 12mm Diameter rod kg 23

K 16mm Diameter rod kg 12

Sump beam

L 10mm Diameter rod as stirrup kg 15

M 16mm Diameter rod kg 26

Sawn formwork as described to reinforced


concrete work

N To sides of sump wall m2 8

Page : 4(ADDM1)/WD/17
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A To soffit of sump cover slab m2 1

B To sides and soffits of beam m2 3

C Labour and material for forming drain No 1


cover opening size 700mm x 700mm wide,
not exceeding 250mm thick

Precast concrete Grade 25/20 including all


moulds, finished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand
(1:3)

D 700mm x 700mm x 60mm Thick drain cover No 1


reinforced with 12mm Diameter rod welded
to angles complete with approved framing
set on sump slab

Sundries

E Approved G.I. grating to suit width and No 1


height of drain generally constructed at
20mm diameter mild steel G.I. bar as
frame, infilled with 12mm diameter mild
steel bars at 50mm centres vertically and
20mm diameter mild steel bars at 500mm
centres horizontally, all welded together
and fixed to sump beam (measured
separately) and including all necessary
fixing accessories all to the
satisfaction of the Architect

The following in 1 No. 1350mm x 1550mm


sump (Sump 2)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

F Excavate sump base with maximum depth not m3 6


exceeding 4.00m deep

Disposal of surplus excavated material

G Load and cart away from site to m3 6


contractor's own dump

Page : 4(ADDM1)/WD/18
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

A Not exceeding 100mm thick under sump base m3 1

Vibrated reinforced concrete Grade 25/20


as described

B Sump base, exceeding 150mm and not m3 1


exceeding 300mm thick

C Sump wall, exceeding 150mm and not m3 1


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

D 12mm Diameter rod kg 35

E 20mm Diameter rod kg 97

Sump wall

F 12mm Diameter rod kg 14

G 20mm Diameter rod kg 43

Sawn formwork as described to reinforced


concrete work

H To sides of sump wall m2 2

The following in 1 No. 2960mm x 1660mm


sump (Sump 3)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

I Excavate sump base with maximum depth not m3 6


exceeding 2.00m deep

Disposal of surplus excavated material

J Load and cart away from site to m3 6


contractor's own dump

Page : 4(ADDM1)/WD/19
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

A Not exceeding 100mm thick under sump base m3 1

Vibrated reinforced concrete Grade 25/20


as described

B Sump base, exceeding 150mm and not m3 1


exceeding 300mm thick

C Sump wall, exceeding 150mm and not m3 3


exceeding 300mm thick

D Sump cover slab, exceeding 150mm and not m3 1


exceeding 300mm thick

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

E 12mm Diameter rod kg 67

F 16mm Diameter rod kg 184

Sump wall

G 12mm Diameter rod kg 34

H 16mm Diameter rod kg 147

Sump cover slab

I 16mm Diameter rod kg 336

J 20mm Diameter rod kg 24

Sawn formwork as described to reinforced


concrete work

K To sides of sump wall m2 26

L To soffit of sump cover slab m2 3

M Labour and material for forming drain No 1


cover opening size 700mm x 700mm wide,
not exceeding 250mm thick

Page : 4(ADDM1)/WD/20
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Precast concrete Grade 25/20 including all


moulds, finished fair on all faces,
stored, hoisted and fixed in position,
bedded and pointed in cement and sand
(1:3)

A 700mm x 700mm x 60mm Thick drain cover No 1


reinforced with 12mm Diameter rod welded
to angles complete with approved framing
set on sump slab

The following in 1 No. 2960mm x 4950mm


sump (Sump 4)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

B Excavate sump base with maximum depth not m3 32


exceeding 4.00m deep

Disposal of surplus excavated material

C Load and cart away from site to m3 32


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

D Not exceeding 100mm deep under sump base m3 1

Vibrated reinforced concrete Grade 25/20


as described

E Sump base, exceeding 150mm and not m3 5


exceeding 300mm thick

F Sump wall, exceeding 150mm and not m3 2


exceeding 300mm thick

G Sump cover slab, exceeding 150mm and not m3 3


exceeding 300mm thick

H Sump beam m3 1

Page : 4(ADDM1)/WD/21
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

A 12mm Diameter rod kg 257

B 16mm Diameter rod kg 764

Sump wall

C 12mm Diameter rod kg 52

D 16mm Diameter rod kg 155

Sump cover slab

E 12mm Diameter rod kg 134

F 16mm Diameter rod kg 445

Sump beam

G 12mm Diameter rod as stirrup kg 29

H 16mm Diameter rod kg 52

Sawn formwork as described to reinforced


concrete work

I To sides of sump walls m2 12

J To soffit of sump cover slab m2 18

K To sides and soffit of sump beam m2 5

L To edge of drain base exceeding 150mm and m 3


not exceeding 300mm high

M To edge of drain base exceeding 150mm and m 3


not exceeding 300mm thick

N To edge of sump cover slab exceeding 150mm m 10


and not exceeding 300mm high

O To edge of sump cover slab exceeding 300mm m 3


and not exceeding 450mm high

P Labour and material for forming manhole No 2


cover opening 600mm diameter, not
exceeding 250mm thick

Page : 4(ADDM1)/WD/22
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Sundries

A 600mm Diameter cast iron heavy duty hinged No 2


manhole cover to B.S.E.N. 124 (weighing
approximately 120kg) and frame all as per
drawing No. MS12345/06/CE/D-07

The following in 2 Nos. 1900mm x 1400mm


sump (Sump 5)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

B Excavate sump base with maximum depth not m3 3


exceeding 1.00m deep

Disposal of surplus excavated material

C Load and cart away from site to m3 3


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

D Not exceeding 100mm deep under sump base m3 1

Vibrated reinforced concrete Grade 25/20


as described

E Sump base, exceeding 150mm and not m3 2


exceeding 300mm thick

F Sump wall, exceeding 150mm and not m3 1


exceeding 300mm thick

G Sump cover slab, exceeding 150mm and not m3 1


exceeding 300mm thick

H Sump beam m3 1

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

I 12mm Diameter rod kg 41

Page : 4(ADDM1)/WD/23
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

A 16mm Diameter rod kg 60

Sump wall

B 12mm Diameter rod kg 157

Sump cover slab

C 12mm Diameter rod kg 119

Sump beam

D 12mm Diameter rod as stirrup kg 17

E 16mm Diameter rod kg 25

Sawn formwork as described to reinforced


concrete work

F To sides of sump wall m2 12

G To soffit of sump cover slab m2 3

H To sides and soffit of sump beam m2 2

The following in 1 No. 1680mm x 1300mm


sump (Sump 6)

Excavate, get out, part return, fill in,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

I Excavate sump base with maximum depth not m3 4


exceeding 2.00m deep

Disposal of surplus excavated material

J Load and cart away from site to m3 4


contractor's own dump

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base of excavation

K Not exceeding 100mm deep under sump base m3 1

Page : 4(ADDM1)/WD/24
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

Vibrated reinforced concrete Grade 25/20


as described

A Sump base, exceeding 150mm and not m3 1


exceeding 300mm thick

B Sump wall, exceeding 150mm and not m3 1


exceeding 300mm thick

C Sump beam m3 1

High yield deformed rod reinforcement


(460N/mm2) to concrete work including
hooks and cranks as described in

Sump base

D 10mm Diameter rod kg 115

Sump wall

E 10mm Diameter rod kg 68

Sump beam

F 10mm Diameter rod as stirrup kg 2

G 16mm Diameter rod kg 11

Sawn formwork as described to reinforced


concrete work

H To sides of sump walls m2 8

I To sides and soffit of sump beam m2 1

Sundries

J Approved 1000mm x 850mm x 4mm thick mild No 1


steel plate as flap gate complete with 2
Nos. of approved hinges each generally
constructed of 40mm x 30mm x 10mm thick
G.I. plate, 1 No. of 16mm diameter G.I.
bolt complete with nut and washer fixed
to approved 75mm x 75mm x 10mm thick G.I.
angle framing all round fixed to sump
beam (measured separately) and including
all necessary fixing accessories all to
the satisfaction of the Architect

Page : 4(ADDM1)/WD/25
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

SURFACE WATER DRAINAGE (Cont'd)

GROUTED STONE PITCHING CASCADING DRAIN ALL


AS PER DRAWING NO. MS12345/06/CE/D-09

The following in 2 Nos. 4300mm x 1500mm x


2050mm deep grouted stone pitching
cascading drain

Excavate, get out, part return, fillin,


well compacted, level, grade and ram
bottom, trim sides and including planking
and strutting

Commencing from existing ground level

A Excavate trench with maximum depth not m3 10


exceeding 1.00m deep

Approved grouted stone pitching

B 150mm thick drain base m3 1

C 150mm thick sloping drain base m3 1

D 150mm thick drain wall m3 1

E 150mm thick sloping drain wall m3 2

TESTING

F Test whole drainage system in the presence Item 1


of the Architect with water or by other
means before trenches are filled in, make
good any defects, retest on completion
and leave the whole work in perfect
working order all to the satisfaction of
the Architect

Page : 4(ADDM1)/WD/26
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/WD/1

Page : 4(ADDM1)/WD/2

Page : 4(ADDM1)/WD/3

Page : 4(ADDM1)/WD/4

Page : 4(ADDM1)/WD/5

Page : 4(ADDM1)/WD/6

Page : 4(ADDM1)/WD/7

Page : 4(ADDM1)/WD/8

Page : 4(ADDM1)/WD/9

Page : 4(ADDM1)/WD/10

Page : 4(ADDM1)/WD/11

Page : 4(ADDM1)/WD/12

Page : 4(ADDM1)/WD/13

Page : 4(ADDM1)/WD/14

Page : 4(ADDM1)/WD/15

Page : 4(ADDM1)/WD/16

Page : 4(ADDM1)/WD/17

Page : 4(ADDM1)/WD/18

Page : 4(ADDM1)/WD/19

Page : 4(ADDM1)/WD/20

Page : 4(ADDM1)/WD/21

Page : 4(ADDM1)/WD/22

Page : 4(ADDM1)/WD/23

Page : 4(ADDM1)/WD/24

Page : 4(ADDM1)/WD/25

Page : 4(ADDM1)/WD/26

Page : 4(ADDM1)/WD/27
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY

SETTING OUT PIPELINE, EXCAVATE TRENCH, GET


OUT, GRADING BOTTOM TO FALL, PART RETURN
INCLUDING BACKFILLING WITH 300MM THICK
SAND OR APPROVED GRANULAR BEDDING WELL
RAMMED IN LAYER OF 150MM THICK, 1000MM
THICK WITH WELL COMPACTED SELECTED
BACKFILL (MIN. 150MM THICK) AND REMAINDER
WITH SUITABLE BACKFILL WELL RAM IN LAYER
OF 300MM THICK INCLUDING TRIM SIDES,
PLANKING AND STRUTTING ALL AS DESCRIBED
AND AS PER DRAWING NO. MS12345/06/W/PD-01

Commencing from platform level

A Excavate trench 600mm wide for water m 1


supply pipes not exceeding 200mm diameter
maximum depth not exceeding 2.00m deep,
average 1550mm deep

DISPOSAL OF SURPLUS EXCAVATED MATERIAL

B Load and cart away from site to m3 1


contractor's own dump

APPROVED DUCTILE IRON PIPE WITH CEMENT


MORTAR LINING INTERNALLY, METALLIC ZINC
COATING EXTERNALLY AND A FINISHING LAYER
OF BITUMINOUS MATERIAL AS SPECIFIED IN
APPROVED JOINTING INCLUDING STAINLESS
STEEL G316 BOLTS, NUTS AND WASHERS ALL IN
STRICT ACCORDANCE TO THE MANUFACTURER'S
INSTRUCTIONS

C 150mm Diameter x 300mm long double flanged No 1


short piece

D 200mm Diameter x 600mm long double flanged No 1


short piece build through brickwall

E 200mm Diameter x 600mm long double flanged No 1


short piece comple with one puddle flange
cast through basement wall

F 200mm Diameter x 750mm long double flanged No 2


short piece build through brickwall

G 200mm Diameter x 1100mm long double No 1


flanged short piece

H 200mm Diameter x 1400mm long double No 1


flanged short piece

I 200mm Diameter x 2250mm long double No 1


flanged short piece

Page : 4(ADDM1)/WS/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY (Cont'd)

A Labour and material for tapping off Item 1


existing 225mm (9") diameter water supply
pipe and connected to new 200mm diameter
water supply pipe including all necessary
fittings, thrust blocks, excavation and
backfilling all to the satisfaction of
the Architect

Extra over ductile iron pipe for flanged


and fittings including all necessary
stainless steel bolts, nuts and washers

B 150mm x 150mm x 100mm Diameter all flanged No 1


Y-strainer

C 200mm - 150mm Diameter double flanged flat No 2


reduce

D 200mm Diameter flanged adapter No 3

E 200mm Diameter x 90 degree double flanged No 2


horizontal bend

F 200mm Diameter x 90 degree double flanged No 2


vertical bend

G 200mm x 200mm x 200mm Diameter all flanged No 1


tee

THE FOLLOWING IN 1 NOS. SLUICE VALVE


CHAMBER ALL AS PER DRAWING NO.
MS12345/06/W/PD-02

Excavate, get out, part return, fill in,


level, grade and ram bottom, trim sides
and including planking and strutting

Commencing from platform level

H Excavate for sluice valve chamber with m3 3


maximum depth not exceeding 2.00m deep

Bed of compacted gravel backfill as


described, spread, leveled, well rammed
and consolidated, watered and blinded on
top with sand to receive concrete
including trimming base of excavation

I 300mm Thick under surface slab m2 1

Disposal of surplus excavated material

J Load and cart away from site to m3 2


contractor's own dump

Page : 4(ADDM1)/WS/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY (Cont'd)

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base

A Not exceeding 100mm thick under base m3 1

Mass concrete Grade 25/20 as described in

B Thrust block m3 1

Vibrated reinforced concrete Grade 25/20


as described in

C Base, exceeding 100mm and not exceeding m3 1


150mm thick

D Cover top slab, not exceeding 100mm thick m3 1

E Ground slab, not exceeding 100mm thick m3 1

Mesh reinforcement with 150mm side and end


laps (measured nett and no allowance made
for laps)

F BMC No. A10 in base m2 1

G BMC No. A10 in cover top slab m2 1

H BMC No. A6 in ground slab m2 1

Sawn formwork as described to mass


concrete work

I To side of thrust block, exceeding 250mm m 1


and not exceeding 500mm high

J To side of thrust block, exceeding 500mm m 1


and not exceeding 1000mm high

Sawn formwork as described to reinforced


concrete work

K To edge of base, not exceeding 250mm high m 5

L To edge of cover top slab, not exceeding m 5


250mm high

M To edge of ground slab, not exceeding m 3


250mm high

Page : 4(ADDM1)/WS/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY (Cont'd)

Well burnt clay bricks bedded and jointed


in cement mortar (1:3) reinforced with
and including 'Exmet' or other equal and
approved reinforcement in every fourth
course complete with approved bonding tie
with one end cast into concrete and the
other end built into brick work including
all necessary perforation through
formwork

A 225mm Thick brickwall m2 5

Internal plastering consisting of two


coats of cement and sand (1:3) finished
with wood float and including raking out
joints of brickwall or hacking concrete
surfaces for key on

19mm Thick to brick and concrete surfaces

B To sides of wall m2 4

Cement and sand (1:3) screed trowelled


with a steel float to a smooth and level
surface

20mm Thick

C To ground slab m2 1

Sundries

D Approved surface box for sluice valve No 1


marking on LID 'SV, SGWS' and including
all necessary concrete mortar set in
position

THE FOLLOWING IN 2 NOS. PIPE SUPPORT

Excavate, get out, part return, fill in,


level, grade and ram bottom, trim sides
and including planking and strutting

Commencing from platform level

E Excavate for pipe support with maximum m3 1


depth not exceeding 1.00m deep

Lean concrete Grade 15/20 blinding with


surface finished level to receive
concrete including where necessary
trimming base

F Not exceeding 100mm thick under base m3 1

Page : 4(ADDM1)/WS/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY (Cont'd)

Vibrated reinforced concrete Grade 25/20


as described in

A Base, exceeding 150mm and not exceeding m3 1


300mm thick

Mesh reinforcement with 150mm side and end


laps (measured nett and no allowance made
for laps)

B BMC No. A6 in base m2 1

Sawn formwork as described to reinforced


concrete work

C To edge of base, not exceeding 250mm high m 5

Well burnt clay bricks bedded and jointed


in cement mortar (1:3) reinforced with
and including 'Exmet' or other equal and
approved reinforcement in every fourth
course complete with approved bonding tie
with one end cast into concrete and the
other end built into brick work including
all necessary perforation through
formwork

D 225mm Thick brickwall m2 1

External plastering consisting of two


coats of cement and sand (1:3) finished
with steel float and including raking out
joints of brickwall or hacking concrete
surfaces for key on

19mm Thick to brick and concrete surfaces

E To sides of wall m2 2

External: Prepare and apply approved paint


system of one coat of wall sealer and two
finishing coats of weather resistant
paint of approved colour on surfaces of

F Plastered top and sides of pipe support m2 2

Page : 4(ADDM1)/WS/5
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

EXTERNAL WATER SUPPLY (Cont'd)

APPROVED FLANGE VALVES AND FITTINGS AS


DESCRIBED

A 25mm Diameter exposed single air valve No 1


complete with isolation stopcock and all
necessary fittings, connecting to pipe
length to suit and approved saddle piece
for fixing to 200mm diameter ductile iron
pipe all as per Drawing No.
MS12345/06/W/PD-02

B 150mm Diameter flanged combination meter No 1


including all necessary extension piece,
fixing accessories and jointing to pipe
all as per Drawing No. MS12345/06/W/PD-02

C 150mm Diameter flanged sluice valve No 3


including all necessary extension piece,
fixing accessories and jointing to pipe
all as per Drawing No. MS12345/06/W/PD-02

PRECAST CONCRETE GRADE 25 INCLUDING ALL


MOULDS, FINISHED FAIR ON ALL FACES,
STORED, HOISTED AND FIX IN POSITION,
BEDDED AND POINTED IN CEMENT AND SAND
(1:3)

D Shaped marker post overall size 200mm x Item 1


100mm x 1165mm long with 455mm high being
exposed including grooved in lettering
painted with approved paint of
appropriate label including all necessary
excavation, cart away and formwork all as
per Drawing No. MS12345/06/W/PD-01

TESTING

E Allow for attendance on pipe burst and Item 1


making good defects during testing and
maintenance period all to the
satisfaction of the Architect

F Allow for carrying out pressure leakage Item 1


and system testing as directed by the
Architect on completion of work

G Allow for sterilising and flushing this Item 1


section of work after testing with
treated water from water supply main at
Contractor's own cost as specified
including all necessary connection to the
main pipe line pump and leave the whole
work in working order to the satisfaction
of the Architect

Page : 4(ADDM1)/WS/6
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/WS/1

Page : 4(ADDM1)/WS/2

Page : 4(ADDM1)/WS/3

Page : 4(ADDM1)/WS/4

Page : 4(ADDM1)/WS/5

Page : 4(ADDM1)/WS/6

Page : 4(ADDM1)/WS/7
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

RETAINING WALL

EXCAVATE, GET OUT, PART RETURN, FILL IN,


WELL COMPACTED, LEVEL, GRADE AND RAM
BOTTOM, TRIM SIDES AND INCLUDING PLANKING
AND STRUTTING

Commencing from existing ground level

A Excavate trench with maximum depth not m3 60


exceeding 4.00m deep

DISPOSAL OF SURPLUS EXCAVATED MATERIAL

B Load and cart away from site to m3 34


contractor's own dump

LEAN CONCRETE GRADE 15/20 BLINDING WITH


SURFACE FINISHED LEVEL TO RECEIVE
CONCRETE INCLUDING WHERE NECESSARY
TRIMMING BASE OF EXCAVATION

C Not exceeding 100mm thick under slab m3 4

VIBRATED REINFORCED CONCRETE GRADE 25/20


AS DESCRIBED IN

D Slab, exceeding 150mm and not exceeding m3 21


300mm thick

E Wall, exceeding 150mm and not exceeding m3 22


300mm thick

HIGH YIELD DEFORMED ROD REINFORCEMENT


(460N/MM2) TO CONCRETE WORK INCLUDING
HOOKS AND CRANKS AS DESCRIBED IN

Slab

F 12mm Diameter rod kg 2,610

Wall

G 12mm Diameter rod kg 2,427

SAWN FORMWORK AS DESCRIBED TO REINFORCED


CONCRETE WORK

H To sides of retaining walls m2 175

I To edge of slab, exceeding 150mm and not m 36


exceeding 300mm high

Page : 4(ADDM1)/RW/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/RW/1

Page : 4(ADDM1)/RW/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

FOOTPATH AND COVERED WALKWAY

NOTE

A Contractor shall include in his rate for Note 1


the construction of footpath on flat and
gently sloping ground

EXCAVATE, GET OUT, PART RETURN, FILL IN,


WELL COMPACTED, LEVEL, GRADE AND RAM
BOTTOM, TRIM SIDES AND INCLUDING PLANKING
AND STRUTTING

Commencing from existing ground level

B Excavate for footpath maximum depth not m3 55


exceeding 1.00m deep

C Excavate for footpath maximum depth not m3 129


exceeding 2.00m deep

D Excavate for footpath maximum depth not m3 245


exceeding 4.00m deep

APPROVED FILLING

E Approved filling with excavated material m3 429


from site, spread, levelled, well
compacted and consolidated in approved
layers to the required level

F Selected imported earth fill thoroughly m3 419


compacted in approved layers to the
required level

WELL COMPACTED HARDCORE SPREAD, LEVELLED,


WELL RAMMED AND CONSOLIDATED TO RECEIVE
CONCRETE INCLUDING TRIMMING BASE OF
EXCAVATION

G 100mm Thick under footpath m2 1,100

VIBRATED REINFORCED CONCRETE GRADE 25/20


AS DESCRIBED IN

H Slab as footpath, exceeding 100mm and not m3 147


exceeding 200mm thick including forming
25mm thick thickening 250mm wide at top
and splayed one side to 150mm wide at
bottom

MESH REINFORCEMENT WITH 150MM SIDE AND END


LAPS (MEASURED NETT AND NO ALLOWANCE MADE
FOR LAPS)

I BMC A7 in slab m2 1,191

Page : 4(ADDM1)/FC/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

FOOTPATH AND COVERED WALKWAY (Cont'd)

SAWN FORMWORK AS DESCRIBED TO REINFORCED


CONCRETE WORK

A To edge of slab not exceeding 250mm high m 1,047

B To edge of slab not exceeding 250mm high m 200


curved on plan to varying radii

EXTERNAL FLOOR FINISH

Labour, material, equipment for forming


TENTEX FAUTEX' or other equal and
approved stamped concrete impression

C To concrete footpath m2 1,100

Page : 4(ADDM1)/FC/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/FC/1

Page : 4(ADDM1)/FC/2

Page : 4(ADDM1)/FC/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

LANDSCAPE

TURFING

Prepare and clear the area to be turfed of


all undesirable matter by carting away
from site, cutting or otherwise including
all necessary trimming to level or
required slope as directed by and all to
the satisfaction of the Architect

A To flat or slightly sloping area for spot m2 221


turfing

250mm Thick layer of top soil well mixed


with rock phosphate fertilizer, spread
and levelled to area ready to receive
turfing all to the satisfaction of the
Architect

B To flat or slightly sloping area for spot m2 221


turfing

Turf to area with axonopus compressus or


other equal and approved turves including
all necessary watering, rolling, weeding,
tending and maintenance until firmly
established

C To flat or slightly sloping area for spot m2 221


turfing

LANDSCAPE

Planting Hole

Excavate for 500mm x 500mm x 500mm deep


planting hole including all necessary
planking, strutting and cart away all
excavated material

Groundcover

D Hemigraphis exotica (100mm Clear height x No 620


150mm Spread x 150mm x 150mm Root Ball)

Excavate for 1000mm x 1000mm x 1000mm deep


planting hole including all necessary
planking, strutting and cart away all
excavated material

Shrub

E Ixora coccinea 'pink' (450mm Clear height No 2,310


x 400mm Spread x 200mm x 200mm Root Ball)

Page : 4(ADDM1)/LS/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

LANDSCAPE (Cont'd)

A Justicia fragilis (450mm Clear height x No 1,370


400mm Spread x 200mm x 200mm Root Ball)

Excavate for 1500mm x 1500mm x 1500mm deep


planting hole including all necessary
planking, strutting and cart away all
excavated material

Fern Tree

B Filicium decipiens (2500mm Clear height x No 92


6000mm Spread x 600mm x 600mm Root Ball)

Soil Mixture

Supply and mix properly approved planting


medium of topsoil and chicken dropping at
the ratio of 3:1 to fill excavated 500mm
x 500mm x 500mm deep planting hole

Groundcover

C Hemigraphis exotica (100mm Clear height x No 620


150mm Spread x 150mm x 150mm Root Ball)

Supply and mix properly approved planting


medium of topsoil and chicken dropping at
the ratio of 3:1 to fill excavated 1000mm
x 1000mm x 1000mm deep planting hole

Shrub

D Ixora coccinea 'pink' (450mm Clear height No 2,310


x 400mm Spread x 200mm x 200mm Root Ball)

E Justicia fragilis (450mm Clear height x No 1,370


400mm Spread x 200mm x 200mm Root Ball)

Supply and mix properly approved planting


medium of topsoil and chicken dropping at
the ratio of 3:1 to fill excavated 1500mm
x 1500mm x 1500mm deep planting hole

Fern Tree

F Filicium decipiens (2500mm Clear height x No 92


6000mm Spread x 600mm x 600mm Root Ball)

Planting Work

Fern Tree

G Filicium decipiens (2500mm Clear height x No 92


6000mm Spread x 600mm x 600mm Root Ball)

Page : 4(ADDM1)/LS/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

LANDSCAPE (Cont'd)

Shrub

A Ixora coccinea 'pink' (450mm Clear height No 2,310


x 400mm Spread x 200mm x 200mm Root Ball)

B Justicia fragilis (450mm Clear height x No 1,370


400mm Spread x 200mm x 200mm Root Ball)

Supply, delivery and plant the following


Fern Trees, Shrubs and Groundcovers. All
prices to include additional soilmix,
fertilizers, manure and mulching
including providing maintenance until
growth is established, but excluding
maintenance Defects Liability Period

Groundcover

C Hemigraphis exotica (100mm Clear height x No 620


150mm Spread x 150mm x 150mm Root Ball)

Staking and Guying

Provide all necessary materials, labour


and tools for staking and guying of trees
and plants all as described as directed
by the Architect

Fern Tree

D Supply and construct square tree staking No 92


with approved hardwood to a framed timber
stake as specified

MAINTENANCE

E The maintenance period shall commence from month 12.00


the date of Certificate of Practical
Completion (CPC) with a period of 12
months. The Contractor shall maintain all
planted areas. Maintenance all includes
watering, weeding, pruning, fertilizing,
pest and disease control, grass cutting
for all turfing area etc. and other
operations for all fern trees, shrubs,
groundcovers and turfing (landscape
components) all as per specifications,
maintenance programme and as directed by
the Architect

Page : 4(ADDM1)/LS/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/LS/1

Page : 4(ADDM1)/LS/2

Page : 4(ADDM1)/LS/3

Page : 4(ADDM1)/LS/4
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

TURFING

SURFACE EXCAVATION

Commencing from existing ground level

A Excavate to formation level maximum depth m3 236


not exceeding 1.00m deep

B Excavate to formation level maximum depth m3 306


not exceeding 2.00m deep

C Excavate to formation level maximum depth m3 121


not exceeding 4.00m deep

APPROVED FILLING

D Approved filling with excavated material m3 663


from site, spread, levelled, well
compacted and consolidated in approved
layers to the required level

E Selected imported earth fill thoroughly m3 510


compacted in approved layers to the
required level

PREPARE AND CLEAR THE AREA TO BE TURFED OF


ALL UNDESIRABLE MATTER BY CUTTING,
CARTING AWAY FROM SITE OR OTHERWISE
INCLUDING ALL NECESSARY TRIMMING TO LEVEL
OR REQUIRED SLOPES AS DIRECTED BY AND ALL
TO THE SATISFACTION OF THE ARCHITECT

F To flat or slightly sloping area for m2 1,938


closed turfing

150MM THICK LAYER OF TOP SOIL, SPREAD AND


LEVELLED TO AREA READY TO RECEIVE TURFING
ALL TO THE ARCHITECT APPROVAL

G To flat or slightly sloping area for m2 1,359


closed turfing

H To sloping area for closed turfing m2 580

TURFING TO AREA WITH AXONOPUS COMPRESSUS


OR OTHER EQUAL AND APPROVED TURVES
INCLUDING ALL NECESSARY WATERING,
ROLLING, WEEDING, TENDING AND MAINTENANCE
UNTIL FIRMLY ESTABLISHED

I To flat or slightly sloping area for m2 1,359


closed turfing

J To sloping area for closed turfing m2 580

Page : 4(ADDM1)/TF/1
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description Unit Qty

TURFING (Cont'd)

MAINTENANCE

A Maintain turfing for the entire project month 12.00


including mowing, watering, weed control,
fertilization, moving and top dressing
etc. all as described and specified all
to the Architect’s satisfaction

Page : 4(ADDM1)/TF/2
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/TF/1

Page : 4(ADDM1)/TF/2

Page : 4(ADDM1)/TF/3
PROPOSED INFRASTRUCTURE WORKS FOR MIXED-D, BT LINTANG
BILL 4 - INFRASTRUCTURE

Ref Description

COLLECTION

Page : 4(ADDM1)/DM/4

Page : 4(ADDM1)/RC/8

Page : 4(ADDM1)/WD/27

Page : 4(ADDM1)/WS/7

Page : 4(ADDM1)/RW/2

Page : 4(ADDM1)/FC/3

Page : 4(ADDM1)/LS/4

Page : 4(ADDM1)/TF/3

Page : 4(ADDM1)/PS/1