A The contractor shall provide at his own risk and cost all materials
scaffolding, tools , plants transport and workmen required for the
works except in so far as may be stated otherwise herein. No timber
used for scaffolding, formwork , or similar purposes shall be
used afterwards in the permanent works.
D The Contractor shall provide at his own risk and cost all water for
the use in connection with the works including Sub- contractor's
work , make arrangement for the connection to the main and
provision of a meter for all water used by him throughout the
construction and pay all costs , fee and charges in connection
herewith. He shall provide all necessary storage, cisterns, tubing
and the like and remove on compleion. All water used in the works
shall be fresh, clean and pure; free from organic matters and
alkaline substances in solution or in suspension.
A The area of the site which may be occupied by the contractor will
be indicated to him and the contractor must not occupy or
encroach on any ground beyond the area as directed.
B The contractor shall make every effort to avoid and in any event
shall be liable for any undue disturbance amounting to nuisance
to the occupiers of the contigous properties by reasons of
noise, dust, traffic and the like or by negligence in controlling his
workmen or materials.
Testing:
E The Architect may, whenever he considers it desirable, test any
materials before they leave the maker's premises as well as after delivery
on the site, and the Architect shall be at liberty to reject any materials
after delivery should he consider them unsatisfactory, notwithstanding
the preliminary test and approval of the materials at the maker's premises.
The costs of these tests are to be borne by the contractor.
Sign boards
A The contractor shall, unless otherwise directed, obtain any necessary
consent or license from the Local Authority and immediately upon
commencement of the works the contractor shall, in accordance with
the details supplied by the Architect, make and erect a sign board
showing the name of the Employer and such other information as shall
be directed and approved by the Architect.
COLLECTION
Page 1/1
Page 1/2
Page 1/3
Disposal of water:
G Keeping all excavations free from general
water (except spring or running water) by pumping,
bailing or by other means necessary. Item
Hardcore:
I 150mm thick Bed levelled compacted and blinded to
receive damp proof membrane (mesured separately) m2
To collection
3/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Sterilization
A Aldrin 0.5% solution applied at a rate of 7 litres
per square metre on hardcore. m2
CONCRETE WORK
C 50mm Blinding m2
D Foundations m3
E 100mm Bed m2
F Column bases m3
G Columns
Reinforcement:
High tensile hot rolled deformed steel bar
reinforcements to B.S. 4449;1969
A 230mm Wall. m2
Finishes
Painting:
To collection
COLLECTION
Page No 3/1/1
Page No 3/1/2
Page No 3/1/3
SUBSTRUCTURE
CARRIED TO SUMMARY OF BILL
3/1/3
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
CONCRETE WORK:
Reinforced in situ concrete (1:2:4) grade 20
nominal mix:
A Columns m3
B Ring beams m3
Reinforcements:
Supply and fix hot rolled mild steel round
bar reinforcements to B.S. 4449; straight or bent
in any location:
Formwork:
Supply and fix sawn softwood formwork:
FRAME
CARRIED TO SUMMARY OF BILL
3/2/1
ITEM DESCRIPTION DESCRIPTIONUNIT RATE AMOUNT
B Lintels m2
C Horizontal beams m3
E Columns m3
Reinforcement
F 10 mm Bar kg
G 16mm Bar kg
Sawn formwork to;
H Sides and soffits of horizontal beams m2
BLOCK WORK
150mm Wall.
WALLING
CARRIED TO SUMMARY OF BILL
3/3/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ROOF COVERING
B Raking cutting m
Reinforcement
G 10 mm Bar kg
H 16mm Bar kg
Roof drainage
ROOF STRUCTURE
CARPENTRY
50x100mm Rafters m
50x100mm Struts m
50x50mm Purlines m
COLLECTION
Page No 3/4/1
Page No 3/4/2
ROOF
CARRIED TO SUMMARY OF BILL
3/4/2
ITEM DESCRIPTION QTY UNIT RATE
JOINERY
Sawn Hardwood
DOORS
CARRIED TO SUMMARY OF BILL
3/5/1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Metal Work
Supply and fix aluminium window units as
manufactured by casement African Co.Ltd as
approved by Architect, coloured, anodized aluminium
complete with glazing 6mm thick ordinary quality clear
sheet glass with 80 x 40 x 20mm minimum thickness
of frame with approved necessary locks, hinges, pull
handles,glazing beads,screws including mullion
and transom.
WINDOW COLLECTION
Page 3/6/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Sanitary Appliances:
Supply and fix the following sanitary appliances; Ex - Italy
including all connections and screwing and bolting to floor
or wall where necessary:
Ancillaries:
Draw off taps; stop valves; copper alloy to BS 5154
or BS 1010; or as manufactured by Dizayn; joint to
Dizyan pipes:
Builder's Work:
M Allow sum for all builder's work in connection with
Plumbing and Engineering installation including chasing
away walls, trench excavation, making good, backfillng
and compacting in trench and removal of surplus material
away from site. Item
COLLECTION
Page No 3/7/1
Page No 3/7/2
Page No 3/7/3
Page No 3/7/4
Page No 3/7/5
PLUMBING INSTALLATION
CARRIED TO SUMMARY OF BILL
3/7/5
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Allow for necessary cutting away holes, chases and the like
for and making good afterthe works on concealed electrical
installations to Architect's approval.
Sundries:
ELECTRICAL INSTALLATIONS
CARRIED TO SUMMARY OF BILL
3/8/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
B 22mm To walls m2
G 40mm Floors m2
Sub totalcollection
3/9/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
TILES, SLABS AND BLOCK FINISHING.
A 225x225x9mmTiling to floor m2
Page 3/9/1
Page 3/9/2 `
FINISHING
CARRIED TO SUMMARY OF BILL
3/9/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
C Column m2
D 15mm To ceiling m2
F Grilles m2
G Wood frame m
O Grilles m2
PAINTING
CARRIED TO SUMMARY OF BILL
3/10/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
Gullies;
A Construct gully; size 150x150mm; comprising
of 100mm diameter UPVC trap; 100mm thick plain
in situ concrete (1:3:6) bed and surround; precast
concrete (1:1:5:2) cover with 3 Nos. 6mm diameter
steel bars; cement sand (1:4) plaster to walls internally nr
Manholes;
B Manhole; size 750x750mm comprising of 150mm
thick solid concrete blockwalls resting on 100mm
thick plain concrete (1:3:6) bed; 200x200mm
benching forming half round channels 100mm dia;
cement sand (1:4) plaster to walls internally; complete
with 610x460mm cast iron manhole cover nr
Pipework
Unplasticised PVC pipes and fittings to B.S 3506
class 'B' with push fit joints in the running length; as
manufactured by Plasco or approved equal:
DRAINAGE
CARRIED TOTAL SUMMARY
3/11/1
SUMMARY OF BILL No. 3:
TOTAL
CARRIED TO GENERAL SUMMARY
GENERAL SUMMARY :
ITEM DESCRIPTION AMOUNT
MEASURED WORKS
4 ALLOW FOR:
DEMOLITION GENERALLY
Avoid of nuisance
Wrecking
To collection
RATE AMOUNT
350,000.00 350,000.00
60,000.00 60,000.00
120,000.00 120,000.00
202,800.00 202,800.00
289,000.00 289,000.00
364,800.00 364,800.00
84,500.00 84,500.00
213,000.00 213,000.00
450,000.00 450,000.00
65,000.00 65,000.00
240,000.00 240,000.00
2,439,100.00