You are on page 1of 2

AL TAWASUL DECORE

To: AL MATAR CONTRACTING CO. Date: 6-Dec-22


Attn : Mr. Muhammed QTN No: ATD/22/1263
Sharjah, UAE Validity: 7 Days
SUBJECT: QUOTATION FOR WOODEN DOORS
Dear Sir,
We would like to thank you for the opportunity to submit our best quote for the above mentioned job for your review and
acceptance based on the scope of works considered and exclusions below. Please find here below Details and Scope
works in this regard :-
QUOTATION
ITEM DESCRIPTION SIZES-MM UNIT QTY PRICE TOTAL PRICE

WOODEN DOOR:
Fabrication, supply and
installation of wooden door made
with 44mm thick solid core
moulding door mahogany veneer
1 and meranti wooden frame and Nos 1 1,500.00 1,500.00
architrave on PU laquer finish as
per approved sample and drawing.
Size:
90x220x26cm
(Excluded Irongmongeries)

WOODEN DOOR-ENTRANCE:
Fabrication,
supply and installation of wooden
door made with 44mm thick solid
core moulding door mahogany
2 veneer and meranti wooden frame Nos 1 4,200.00 4,200.00
and architrave on PU laquer matt
finish as per approved sample and
drawing. Size: 180x220x26cm
(Excluded
Irongmongeries)

WOODEN DOOR:
Fabrication, supply and
installation of wooden door made
with 44mm thick solid core veneer
with ss trip and meranti wooden
3 Nos 1 1,400.00 1,400.00
frame and architrave on PU laquer
matt finish as per approved sample
and drawing. Size: 90x220x26cm
(Excluded
Irongmongeries)
Total Amount AED 7,100.00
Vat 5% 355.00
Net Amount 7,455.00
SCOPE OF WORK: FABRICATION , SUPPLY AND INSTALLATION
Excluded :- Granite Threshold ,Subframe & Ironmongeries
SPECIFICATION
A Frame : 44mm thick Red Merant Wood on Mahogany veneer PU polish finish.
B Architrave: 60x12mm Red MerantI on PU Polish finish.
C IRONMONGERIES PROVIDED BY CLIENT : (Hinges, Door Handle with lock pad & door stoper )
Terms & conditions

1 . Quotation prepared as per the project drawings and design. Any changes may cause increase in the price .

2 . All prices are based on current market price . Incase recivse the price and regulation after your order confirmation

resulting in aditional or different panel components being required , these shall be charged extra.

3 . Excluding : 1- any work other than mentioned above.

2- any type of authority approvels

3- any type of civil work

4- any type external works

5- supply of Door ironmongeries

4 . Note : 1 1- Temporary power supply for site work shall be provided by client

5 . Payment: 1- 50% Advance against LPO, 40% against delivery and 10% after completion.

2- As per UAE LAW , 5% VAT will applicable in each invoice amount .

4 . Completion: As per the discussion

If there will be any delay on the approval of samples or approval on designs, it will affect on the completion of job

FOR AL TAWALSUL DÉCOR

JASHEER PT FASAL RAHMAN

Marketing Manager Sales Executive

Mob : 050 3831859 Mob : 050 3831659