CASA

COMPRAS
NOMBRE:
FECHA: 10/7/2022
PRESUPUESTO $ 240,000.00
SUBSIDIO 7 % $ 16,800.00
MANO DE OBRA $ 49,000.00
DINERO SOBRANTE $ 223,200.00
PRIMERA ETAPA
PRECIO
FECHA CANTIDAD DESCRIPCION TOTAL
UNITARIO
800 BLOCK 12X20X40 Cms. $ 14.30 $ 11,440.00
comisión $ 215.00
70 Varilla 3/8 $ 210.00 $ 14,700.00
80 Cemento Gris Holcim $ 220.00 $ 17,600.00
6 Armex Castillo 12 x 12 $ 210.00 $ 1,260.00
10/7/2022 23 Malla Soldada mtrs. $ 95.00 $ 2,185.00
150 Alambron $ 36.00 $ 5,400.00
40 Alambre recocido $ 43.00 $ 1,720.00
22 Clavo 2 1/2 $ 49.00 $ 1,078.00
2 Camion de Arena $ 3,600.00 $ 7,200.00
1 Camion de Grava $ 3,800.00 $ 3,800.00
10/22/2022 Mano de Obra $ 6,000.00 $ 6,000.00
10/29/2022 Mano de Obra $ 2,000.00 $ 2,000.00
1 Tubo 3 " $ 200.00 $ 200.00
1 Tee 3 " $ 30.00 $ 30.00
11/9/2022
1 Tee 4" $ 35.00 $ 35.00
comision $ 10.00 $ 10.00
1 Tubo CPVC 3/4 $ 90.00 $ 90.00
3 Tubo 1/2 $ 40.00 $ 120.00
4 Codos 1/2 $ 10.00 $ 40.00
4 Codos 3/4 $ 6.00 $ 24.00
11/9/2022 1 Pegamento $ 50.00 $ 50.00
3 Codos 3" $ 20.00 $ 60.00
1 Codo 4 " $ 25.00 $ 25.00
1 Reductor de 4 a 3 $ 25.00 $ 25.00
comision $ 10.00 $ 10.00
20 Alambrito $ 35.00 $ 700.00
11/11/2022
comision $ 16.00 $ 16.00
11/12/2022 Mano de Obra $ 6,000.00 $ 6,000.00
30 Alambron $ 30.00 $ 900.00
11/17/2022
1 Electroducto 3/4 s/g Manguera corrugada $ 300.00 $ 300.00
11/20/2022 Mano de Obra $ 3,000.00 $ 3,000.00
11/26/2022 18 Tablas $ 100.00 $ 1,800.00
TOTAL
$ 0.00
SEGUNDA ETAPA
22 Varilla 3/8 $ 170.00 $ 3,740.00
12/1/2022
9 Monteng c 22 $ 295.00 $ 2,655.00
12/3/2022 Mano de Obra $ 1,500.00 $ 1,500.00
12/5/2022 17 Tablas $ 100.00 $ 1,700.00
300 BLOCK 12X20X40 Cms. $ 14.62 $ 4,386.00
5 Polin Monten 3 x 1 1/2 Cal. 16 $ 710.00 $ 3,550.00
30 Laminas 3.5 $ 271.00 $ 8,130.00
12/7/2022
250 Pija $ 2.05 $ 513
10 Cemento Apasco $ 230.00 $ 2,300.00
5 Alambrito $ 36.00 $ 180.00
12/7/2022 1 Camion de Grava $ 3,900.00 $ 3,900.00
12 Codos CPVC 3/4 $ 7.00 $ 84.00
7 Tubo CPVC 3/4 $ 92.00 $ 644.00
1 Tubo CPVC 1/2 $ 52.00 $ 52.00
6 Reductor CPVC de 3/4 a 1/2 $ 6.00 $ 36.00
4 Tee CPVC 3/4 $ 11.00 $ 44.00
12/7/2022
2 Tee CPVC 4 $ 36.00 $ 72.00
3 Codo CPVC 4 $ 26.00 $ 78.00
1 Tubo CPVC 3 $ 205.00 $ 205.00
1 Reduccion CPVC 3 a 2 $ 26.00 $ 26.00
1 Reuccion de 2 a 1/2 $ 11.00 $ 11.00
12/7/2022 7 Varilla 3/8 $ 174.00 $ 1,218.00
12/10/2022 Mano de Obra $ 6,000.00 $ 6,000.00
12/15/2022 130 BLOCK 12X20X40 Cms. $ 14.62 $ 1,901
12/17/2022 Mano de Obra $ 2,500.00 $ 2,500.00
40 BLOCK 12X20X40 Cms. $ 14.62 $ 584.80
12/20/2022
4 Cemento apasco $ 230.00 $ 920.00
1 Tinaco 750 ML $ 2,500.00 $ 2,500.00
1 Paq. Florencia celeste (Baño) $ 2,000.00 $ 2,000.00
1 Manguera $ 50.00 $ 50.00
1 Manguera $ 50.00 $ 50.00
12/22/2022
1 Llave $ 220.00 $ 220.00
1 Cespo $ 65.00 $ 65.00
1 Empaque $ 15.00 $ 15.00
Comision $ 110.00 $ 110.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
TOTAL $ 139,971.90