TS-01 Domestic Pumps Flow and Head Calculation
The Contractor confirms herewith this document has been executed & coordinated strictly as per the approval of drawings from
the authorities and approved specifications from the engineering consultant.
STATUS OF QA / QC DEPARTMENT
☐ Approved ☐ Approved As Noted ☐ Re-Submit
Comment/s:
1. Contractor should comply all the comments as per projection specification – “SECTION 221429 -
SUMP PUMPS” and “SECTION 221123 for “DOMESTIC WATER PUMPS” and its controls and
Sequence of operation.
2. Basement to ground floor height approximately taken (+3.5 M to 3.5 M = 7 Meter) due to the
non-availability of Approved Schematic Drawing.
3. Pipe size, pipe length and fitting quantity considered from design drawing (it was measured
Approximately +/-) since considered the safety factor 20%. So pipe routing and length will not
affect during the MEP coordination drawing preparation. In case any major changes submit
separate drawing and approval to be obtained.
4. Safety factor to be confirmed by design Team- as per the calculation for SUMP Pump 15%
irrigation pump-20% , Booster & Transfer pump safety factor considered as 20%.
5. Contractor must submit shop drawings showing pump type, capacity, certified pump curves
showing pump performance characteristics with pump and system operating point plotted.
Include NPSH
(Net positive suction head) curve when applicable and include electrical characteristics.
6. Booster pumps calculation loading units verified with nomogram chart and as per design
drawings.
7. Booster pumps calculation the shower pressure considered 2 bar, design team to be confirmed.
8. Pump type, material of construction of pumps, electric motor specification details to be
submitted in the material submittal.
9. All Pump startup arrangements to be comply as per the approved and Dewa requirements &
regulation.
10. Supplier confirmation required for the selection of pumps as per the project designs.
11. All pump panels shall have control for auto sequencing, fused circuit for each motor, main
disconnect switch, selector switch for each pump, power on indicator light, run/trip indicators.
12. Pump Control panel U/L certificate should be provided, and Cable size and Breaker rating should
be as per DEWA requirements.
13. According to the pump selection schedule pump head and flow rates considered as follows: -
Domestic booster pump: - (Head 2.8 bar : Flow rate 5.107 L/s – 1D+1S) -4 FLOORS
Domestic Transfer pump: - (Head 9.3 bar : Flow rate 13 L/s – 1D+1S)
Irrigation pump: - (Head 2.5 bar : Flow rate 3 L/s – 1D+1S)
Sump pump: - (Head 2.5 bar : Flow rate 5 L/s – 1D+1S)
14. Provide hygienic certificate showing that the selected pump package is suitable for drinking
water.
15. All pumps shall be factory assembled & tested.
16. Subject to material Submittal approval.
PRABAKARAN NARAYANASAMY –
QAQC-MEP INSPECTOR
SCHEDULE FOR DOMESTIC BOOSTER PUMP
SL:NO FLOW RATE (l/s) HEAD (Bar) QTY Remarks PURPOSE
(1 Duty+1
1 5.107 2.8 1 set BOOSTER PUMP
Standby)
DOMESTIC COLD WATER BOOSTER PUMP - B-crest@ROOF FLOOR 19,18,17,16 FLOORS
Pipe pressure drop calculation(Water meter room) Pipe pressure drop calculation(MAIN RISER + HEADER)-3" RISER
Pipe pressure drop calculation(CORRIDOR to Flat 05) Pipe pressure drop calculation(FLAT8 TO WC)
EWC-STD-C 1 2
HF-C 1 1
WB-BC-C&H 1 2
1 FLAT NO-1(1BHK) 13
SHOWER-C&H 1 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 1 2
HF-C 1 1
WB-BC-C&H 1 2
2 FLAT NO-2(1-BHK) 13
SHOWER-C&H 1 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
3 FLAT NO-3(3BHK) 21
SHOWER-C&H 2 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
4 FLAT NO-4(2BHK) 21
SHOWER-C&H 2 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
5 FLAT NO-5(1BHK) 18 164 1.782 656 5.008 18 0.33 674 5.107
SHOWER-C&H 1 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
6 FLAT NO-6(1BHK) 18
SHOWER-C&H 1 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
7 FLAT NO-7(1BHK) 21
SHOWER-C&H 2 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
8 FLAT NO-8(1BHK) 21
SHOWER-C&H 2 3
SINK-BC-C&H 1 3
WM-C 1 2
EWC-STD-C 2 2
HF-C 2 1
WB-BC-C&H 2 2
9 FLAT NO-9(1BHK) 18
SHOWER-C&H 1 3
SINK-BC-C&H 1 3
WM-C 1 2
GENERAL SERVICE
Lavatory 5 2
18 0.33
Lavatory 4 2
SCHEDULE FOR IRRIGATION PUMP
SL:NO FLOW RATE (l/s) HEAD (Bar) QTY Remarks PURPOSE
1 3 2.5 1 set (1 Duty+1 Standby) IRRIGATION
IRRIGATION TANK CAPACITY(3M(L)*3M(W)*1M(H))
IRRIGATION PUMP(P4 TO FIRST FLOOR LOW LEVEL) - B-CREST,JVC P4-Irrigation water tank size (3M(L)*3M(W)*1M(H)(0.8m(w.t)+.2(f.b)
P4-Irrigation water tank capacity 9.00 cu.m
Flow rate & Pipe Sizing P4-Irrigation water tank capacity 9,000.00 l
GREEN AREA +PAM TREES
=
Total tank capacity @ Podium-03 9.00 M³ Water consumption for each Total quanitity
SL:NO DESCRIPTION UNIT QTY Remarks
plants Lit/Daily at peak in Liters
Required flow rate = 2.73 l/s
Required flow rate = 43 Us.gpm 1 Palm trees Nos 2 150 300
2 Trees Nos 11 100 1,100
Pump head calculation 3 Shrubs Nos 12 20 240
Pressure loss in the pipe & fittings = 2.3 m H₂0 4 Ground cover Nos 0 10 0
Pressure considered at discharge valve 5.0 m H₂0
Total head = 7.3 m H₂0 TOTAL Irrigation water required in Liters 1,640
Safety factor 20.0 % = 1.5 m H₂0 Daily water operation 10 min per 3times(8am,1pm,6pm) 2.73 lps
Static head = 7.8 m H₂0
Total pressure loss with safety = 16.5 m H₂0
1.6 bar
Pipe selected
Ø 65 mm SCH 80 PIPE(2 1/2")
Flow rate = 2.73 l/sec
Velocity = 3.27 ft/sec
1.0 m/sec
Pipe friction loss = 0.80 psi/100ft
Pipe friction loss = 1.85 ft/100ft
Pipe length No. of fittings
(M) ELBOW90 TEE GV STR. NRV
Suction (A) 2.0 0 0 1 1 1
Discharge (B)+Riser
(C )+FF LOW LEVEL 51.0 9 11 1
(D)
Total 53.0 9 11 2 1 1
Total equivalent length
Pipe selected
Ø 75 mm SCH 80 PIPE(3")
Flow rate = 4.63 l/sec
Velocity = 3.56 ft/sec
1.1 m/sec
Pipe friction loss = 0.71 psi/100ft
Pipe friction loss = 1.64 ft/100ft
Pipe length No. of fittings
(M) ELBOW90 TEE GV STR. NRV
Suction (A)
Discharge (B)+Riser
(C )+B/L Break
41.0 9 1 1 0 1
pressure manhole
(D)
Total 41.0 9 1 1 0 1
Total equivalent length
Total Length
Qnty. Eq. Length (ft)
(ft)
Pipe 41.0 134.5 134.48
Fittings
E90 9 11.0 99.00
TEE 1 12.0 12.00
GV 1 1.9 1.90
STR. 0 0.0 0.00
NRV 1 27.0 27.00
Total 274.38 ft
3. Presure gauges shall be provided on common suction & discharge header and limit switches on supply header.
4. Transfer water pumps shall be constructed with SS 316L Casing, impellers and Shafts.
6. All pump panels shall have control for auto sequencing, fused circuit for each motor, main disconnect switch,
selector switch for each pump, power on indicator light, run/trip indicators.
DOMESTIC WATER TRANSFER PUMP( BASEMENT FLOOR TO ROOF) - B-CREST,JVC
Flow rate & Pipe Sizing
Total tank capacity @ Roof floor = 20,000.00 Imp.Gal
Total tank capacity @ Roof floor = 90.9 M³
Filling time considered = 2.00 Hrs.
Required flow rate = 45.46 M³ / Hr.
= 200 US gpm
= 13 l/s
Pump head calculation
Pressure loss in the pipe & fittings = 4.5 m H₂0
Pressure considered at discharge valve 10.0 m H₂0
Total head = 14.5 m H₂0
Safety factor 20.0 % = 2.9 m H₂0
Selected Pump
1 set of transfer pump (1 Duty + 1 Standby) @ 13 l/s, 9.3 bar
Pipe selected
Ø 100 mm SCH 80 PIPE(4")
Flow rate = 13 l/sec 200.15
Velocity = 5.75 ft/sec
1.8 m/sec
Pipe friction loss = 1.20 psi/100ft
Pipe friction loss = 2.76 ft/100ft Data as per Mcquay Pipe sizer
Pipe length No. of fittings
(M) ELBOW90 TEE GV STR. NRV
Suction (A) 7.0 2 1 2 1 0
Discharge
line+Riser+Roof 86.0 9 1 2 0 1
floor(B+C+D)
Total 93.0 11 2 4 1 1
Total equivalent length
Total Length
Qnty. Eq. Length (ft)
(ft)
Pipe 93.0 305.0 305.04
Fittings
E90 11 12.5 137.50
TEE 2 21.0 42.00
GV 4 2.0 8.00
STR. 1 18.5 18.50
NRV 1 18.5 18.50
Total 529.54 ft