SF Projects

E&I

Ibrahim Khaleel

Ali Mufleh

21.12.2022
Rotaion Day Date Sr

Day 1 08/12/22
1
2
3
Day 2 09/12/22

1
2
3
Day 3 10/12/22

1
2
3
4
5
Day 4 11/12/22

1
2
3
4
Day 5 12/12/22

1
2
3
4

Day 6 13/12/22

1
2
3
4
Day 7 14/12/22

1
2
3
Day 8 15/12/22

1
2
3
4
5
Day 9 16/12/22

1
2
3
Day 10 17/12/22

1
2
3
4
Day 11 18/12/22

1
2
3
4
Day 12 19/12/22

1
2
3
4
Day 13 20/12/22

1
Day 14 21/12/22

1
Tasks

Site visit to TPS project regarding RFIs, for generators test, transformer test, MV switchgear test, battery test, UPS test and ins
Working on transmittal WIPP-CWT-DOC-AOS-T-0715 with Aymen
Read handover report from Ali Mufleh

Continue checking the installation of AC & DC UPS and MV Switchgear at TPS Project.
Site visit to WIP project with Mohammed and Saleh to sign material receiving RFI for power & telecome cables + Cathodic pro
Working on transmittal WIPP-CWT-DOC-AOS-T-0715 with Aymen

Site visit to TPS regarding RFI # 0027 Inspection request for Loop check, RFI not signed.
An email sent to hasan Almatrood regarding the above RFI, because CJI not have loop tester and they already taped the wire c
Ask Abdulla from ETLALAT to send to me the last instrumentation progress report for SAA project and the RFI for power & inst
Working on transmittal WIPP-CWT-DOC-AOS-T-0715 with Aymen
Sent Email to FM project QA/QC Lead regarding CCTV installation RFI, they attached the wrong drawings.

Attend MC Walkdown at TPS & CPF2 side with Mr. Laith BOC Engineer.
Sent an Email contain Instrument Punch List points to Muhammad Yasin for TPS project
Discuss with Moumin and Aymen about SAA Project orfice plate flowmeter, Its orfice plate diameter very small will cause back
working on transmittal SSEP-SAA-EXPANSION-EAH-ANT-T-0181 for SAA project

transmittal SSEP-SAA-EXPANSION-EAH-ANT-T-0181 for SAA project, review completed and submitted to DCC
Working on Transmittal SSEP-SAA-EXPANSION-EAH-ANT-T-0183 for SAA project
sent Well pad TQs that we did during the Off-line test to Omar Zaki for proper close out
Recived an Email from Eng. Abdulla regarding the new routing they did for Instrument cable layout. And an Email replied to hi

Working on Transmittal SSEP-SAA-EXPANSION-EAH-ANT-T-0183 for SAA project


Site visit to NODS project to check the RFI for visual inspection for instrument cables layout/ this RFI will be signed after Civil te
An Email sent to Ma Zan contain the prvious & latest revision of E20-2 P&ID. Requested by Mr. Xu.
transmittal SSEP-SAA-EXPANSION-EAH-ANT-T-0183 for SAA project, review completed and submitted to DCC

Sign a RFI for instrument cables layout approval for NODS project
Working on RFI for instrument material receving which include magentic level gauge, ultrasonic level transmitter and electrom
Site visit to WIP project with Ayman to inspect the instrument material receiving RFI. Tomorrow will continue the inspection

Complete the inspection for Instrument materials RFI at WIP project. RFI will signed approved with notes: Magentic level gaug
Site visit to TPS to check the installation of CCTV and FGS flame detector & heat detector. RFI will be signed with notes.
Reciving progress report of SAA project from Abdullah ETLALAT Engineer.
A Noted Email sent to Mr. Xu. That we will support construction team regarding the temporary Tags for WHCP as KBR suggest
Study the RMU control wiring diagram for connecting with CPF2 6.6 kv switch gear.

Study the RMU control wiring diagram for connecting with CPF2 6.6 kv switch gear.
Sent Email to hassan conatin explanation of the control/FO cables connection between CPF2/TPS switchgears and the 33kV RM
Print Certificates requested by Hasan of MV switchgears, LV switchgear, Transformer …. for TPS project

Follow up with Chen, CJI engineer to close the punch list at TPS, some of them are closed and others not yet.
Test the RMU Incomer feeder signals from 11kV switch gear (scada system) and check the wiring and connection.
Ask Chen to send to me the last updated documents of RMU terminal connection diagram
Working on transmittal CPFE-CP1-ANT-TZC-T-0090

Site visit to TPS with Hasan, Muhanad and Saleh to check punch list, SCADA system and protection relay settings
reviewed and submitted transmittal CPFE-CP1-ANT-TZC-T-0090
Sent Email to Zainb that we will not review any telcom document. All detail design will be reviewd by IT dept. according to Mr
Take the loop diagram from Chen for control cables connection between CPF2 6.6kV swtichgear and 33kV RMU at TPS, scanne

Received an Email from Mr. LV to review Feed documents about new project at CPF1. (New sludge catcher & existing floating
Meet Mr. Salah the Instrument lead at CPF1 and Emerson engineer and discuss about the above project. Will meet Mr. Basim
An email sent to you and Ayman fo your further review of the above project Feed doc. And it contain my comments on some d
This Feed document should be submitted to Mr. Xia before 25th of Dec 2022

Emergency Leave

Emergency Leave
Status

Closed
Closed
Closed

Closed
Closed
Closed

Closed
Closed
Closed
Closed
Closed

Closed
Closed
Closed
Closed

Closed
Closed
Closed
Closed

Closed
Closed
Closed
Closed

Closed
Closed
Closed

Closed
Closed
Closed
Closed
Closed

Closed
Closed
Closed

Closed
Closed
Closed
Closed

Closed
Closed
Closed
Closed

Closed
Open
Closed
Open
Remarks